You are on page 1of 5

1

NOTES
- 1. ALL DIMENSIONS ARE IN MILLIMETRES AND LEVELS,
PEDESTAL
INSERT a CO-ORDINATES ARE IN METRES UNO.
PLATE
PEDESTAL
3-T12
LINKS e f e 2. FOR OTHER NOTES, REFERENCES AND LEGENDS REFER
EL (T.O.C)
DRAWING NO. NG-100-A2Q-5-01609-001.

t
F.G.L (VARIES) F.G.L (VARIES) 2d 3. INSERT PLATE SHALL BE WELDABLE STEEL IN
(REFER SPECIAL NOTE) ACCORDANCE WITH BS EN 10025-S275JR.

REFER SPECIAL
4. ALL STRUCTURAL HOLDFAST/ REINFORCEMENT LUGS

300 (MIN.)
CONCRETE PROTECTION

g
LUGS SHALL BE HOT DIP GALVANIZED IN ACCORDANCE WITH

NOTE

REFER PLAN
TYPE-B (CASE B1)
ASTM A123M OR BS EN ISO1461 AS PER
REFER STD. DWG NO. 6

LINKS
AGES-SP-01-001.
AD-90-C-331011
T10-200-C/C
LINKS (TYP) B SECTION
-

(TYP)
CJ (TYP) (NTS)

150
(TYP)

(TYP)
(TYP)
100

LAP

50
T16 @ 150 C/C
(BOTH WAYS)
FDN. THK

3-T16 BARS (EACH FACE)


(FOR FOOTING THK >= 700MM)

==
EL (B.O.F)
(TYP) a
=I=
100 Ld
e f e
(TYP) REFER NOTE 7 & 8 (TYP)
WELL COMPACTED 1-T10 LINK

e
50 THK BLINDING IN DWG NO.
SOIL (TYP) (TYP) SPECIAL NOTE
CONCRETE AD-90-C-331112
(TYP) T16 @ 150 C/C F.G.L SHALL BE MINIMUM 300 BELOW T.O.C. SITE

c
(BOTH WAYS) GRADING TO BE DONE LOCALLY TO MATCH
TYPICAL CROSS SECTION FOR B-

c c c
EXISTING GROUND PROFILE AROUND STRUCTURE.
TYPICAL CROSS SECTION FOR

=I=
IP

SPS-4-AG-2011, 2012 & 2017

b
(FORMWORK DETAILS) SPS-4-AG-2011, 2012 & 2017
(REINFORCEMENT DETAILS) HOLD

c
(NTS)
FOR B.O.F, TOC & FDN. THK REFER DRG. NO. (NTS)
IP

e
NG-100-A2Q-5-01609-001

TYPICAL DETAILS OF INSERT PLATE


REFER PLAN (NTS)
= =

REFER PLAN
=I=
INSERT PLATE
REFERENCE DRAWINGS
T12-200

L
REFER PLAN

REFER PLAN

C PEDESTAL
CLEAR TO MESH

IN SINGLE LAYER
=I=

=I=

PEDESTAL
(BOTH WAYS)
150

T12-200 IN SINGLE LAYER

CLEAR
3-T12

50
PD (BOTH WAYS)
LINKS

75
75
A-
PEDESTAL
LEGEND
TYPICAL PLAN FOR SLEEPER 1 DETAIL A SECTION
SPS-4-AG-2011, 2012 & 2017 - SCALE (NTS) - SCALE (NTS) PD : PEDESTAL
IP : INSERT PLATE
(FOR LOCATION, DIMENSIONS & ORIENTATION REFER DWG NO. (REINFORCEMENT DETAILS AT TOP OF SLEEPER FOR PD2 / PD3)
NG-100-A2Q-5-01609-001 & NG-100-A2Q-5-01610-001)
(NTS)

1500 1000
16-T20
24-T20
T10-200-C/C
T10-200-C/C
LINKS 2 12.10.23 ISSUED FOR CONSTRUCTION SKI RL SS/SPM DLC
SCHEDULE OF INSERT PLATE
500

LINKS
500

1 25.09.23 ISSUED FOR REVIEW ADK RL SS/SPM DLC


REV DATE DESCRIPTION DRN CHK ENG APP APP
ADGAS

(5-LINKS+2 TIES PER SET) (3-LINKS+2 TIES PER SET) DETAILS OF INSERT DETAILS OF LUG NO. OF DIA. OF
INSERT ABU DHABI GAS LIQUEFACTION COMPANY LTD.
PLATE LUGS LUGS NOS
PALTE (ADNOC GAS)
REINFORCEMENT DETAILS FOR PD2 REINFORCEMENT DETAILS FOR PD3 MKD LZ LTDP-1
(2 NO.S) (1 NO.) a b t e g c f N (mm) NEW MAIN GAS LINE (NMGL)
SCALE 1:25 SCALE 1:25 (mm) (mm) (mm) (mm) (mm) (mm) (mm) PROJECT
CONTRACTOR: NATIONAL PETROLEUM CONSTRUCTION COMPANY
P.O. BOX: 2058, MUSSAFAH ABU DHABI, UAE.
PEDESTAL/IP1
IP1 400 1400 167.5 340 Tel: +971 2 554 9000
PEDESTAL/IP2 16 30 250 9 16 2 Fax: +971 2 554 9111
1500 1000 IP2 400 900 16 30 250 168 340 6 16 1 CONTRACTOR
DRAWING NUMBER 2369-Q-08116-001
= = = =
DRAWING TITLE
FOUNDATION LAYOUT & DETAILS OF TRESTLE
= =

= =
500

500

PEDESTAL/IP1 PEDESTAL/IP2

SUPPORTS STRETCH-9 FROM SPS-4-AG-2011

ADNOC GAS A1 FORMAT


2012 & 2017. SHT-4
PLAN FOR PEDESTAL PD2 PLAN FOR PEDESTAL PD3 READ THIS DRAWING IN CONJUNCTION WITH
DRG. NO. NG-100-A2Q-5-01609-001,
CONTRACT No. ADNOC LNG DRAWING NUMBER REV.
(SHOWING INSERT PLATE LAYOUT)
SCALE 1:25
(SHOWING INSERT PLATE LAYOUT)
SCALE 1:25
NG-100-A2Q-5-01610-001. 4700016503
NG-100-A2Q-5-01616-001 2
SCALE: AS SHOWN CAD FILE No. NG-100-A2Q-5-01616-001_REV 2.dwg
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

NPCC Transmittal No: 2369-NPCC-ADNOC-T-52958 ADNOC Offshore Trl ref No: 11689-E-O-T-LNG-IFR-000270

Dated Received : 25-09-2023 Date Reviewed: : 05-10-2023

Rev Document Approval Approval code **


Document No. Document Title Class Class *

PLAN, ELEVATION & DETAILS OF TRESTLE


NG-100-A2Q-5-01612-001 SUPPORTS STRETCH-9 FOR SPS-4-AG-2001, 2007, 1 2 2 Approved with comments
2013 AND 2014 SHT-1

NG-100-A2Q-5-01613-001 PLAN, ELEVATION & DETAILS OF TRESTLE


SUPPORTS STRETCH-9 FOR SPS-4-AG-2001, 2007, 1 2 2 Approved with comments
2013 AND 2014 SHT-2

NG-100-A2Q-5-01614-001 PLAN, ELEVATION & DETAILS OF TRESTLE


SUPPORTS STRETCH-9 FOR SPS-4-AG-2001, 2007, 1 2 2 Approved with comments
2013 AND 2014 SHT-3

NG-100-A2Q-5-01615-001 PLAN, ELEVATION & DETAILS OF TRESTLE


SUPPORTS STRETCH-9 FOR SPS-4-AG-2001, 2007, 1 2 2 Approved with comments
2013 AND 2014 SHT-4

NG-100-A2Q-5-01616-001 FOUNDATION LAYOUT & DETAILS OF TRESTLE


SUPPORTS STRETCH-9 FROM SPS-4- AG-2011 1 2 2 Approved with comments
2012 & 2017. SHT-4

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 1 of 4
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

Review Code (MUST BE SELECTED): 2 = Approved with comments


(proceed with work, incorporate comments and resubmit)
1 = Approved
4 = For Information 5= Rejected
3 = Reviewed with comments (correct & resubmit) (Accepted for information only) (Document must be resubmitted once comments are incorporated and then
contents meets the requirements of Agreement)

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 2 of 4
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

COMMENTS ON Rev 1

Document No. NG-100-A2Q-5-01612-001 TO 01616-001 2369-Q-08112-001 TO 08116-001

Contractor
Srl. Reference Company Comment Contractor Response Company Comments
Response

1 NG-100-A2Q-5-01612-001 Comments in calculation report shall be addressed in drawings. Noted and Incorporated
SPS-4-AG-2007 and
NG-100-A2Q-5-01612-001 Contractor to note that position of Trestle shall be finalized based on
2 2001 is as per final
final company agreed routing of NMGL pipe.
position.
3 NG-100-A2Q-5-01612-001 Add base plate stiffener MTO Noted and Incorporated

4 NG-100-A2Q-5-01613-001 Welded to Base plate Noted and Incorporated


Base plate design has not been reviewed as native files for base
5 NG-100-A2Q-5-01613-001 Noted and Incorporated
plate is missing in the report.
UB406x60 is connected
How to connect UB406 beam with UC152 column. to UC203x46 columns
6 NG-100-A2Q-5-01614-001 This type of connection is not available in standard connection not UC 152x30. Hence
drawing. this beam to column
connection is possible.
7 NG-100-A2Q-5-01615-001 Comments in calculation report shall be addressed in drawings. Noted and Incorporated

8 NG-100-A2Q-5-01616-001 Add insert plate and lug specification follow valve pit drawings. Noted and Incorporated

9 NG-100-A2Q-5-01616-001 These are not sleepers, correct to 2011 2012 2017. Noted and Incorporated

Not reviewed sleeper foundations as Mat3D files are missing in


10 NG-100-A2Q-5-01616-001 Noted and Incorporated
report.
*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 3 of 4
LOWER ZAKUM LONG TERM DEVELOPMENT PHASE-1 (LZ LTDP-1)
2369 - EPC FOR NEW MAIN GAS LINE (NMGL) PROJECT
Document Review/Comment Sheet

Title Name Signature Date

Engineer Sunil Shinge 12-10-2023

Sanjay Shelar / Sreekanth P 12-10-2023


Lead Engineer
Menon
PEM Devdatt Liladhar Chaure 12-10-2023

*Approval Class:
1: Requires COMPANY review and approval to allow CONTRACTOR to proceed”
2: CONTRACTOR shall incorporate comments received from COMPANY within the Contract review period”
3: Documents issued for information, CONTRACTOR may proceed without COMPANY comments or approval:
**Approval Codes:
1: Approved without comment, 2: Approved with comments 3: Reviewed with Comments, 4: Information only,
5: Rejected
Page 4 of 4

You might also like