You are on page 1of 1

SO A1 594m m x 841m m

NOTES:
1. FOR GENERAL NOTES REFER TO DRAWING NO.
60334056/C1/GAT/4005.

2. THIS DRAWING SHALL BE READ IN CONJUNCTION


> MAIN ACCESS TUNNEL (EAST) WITH DRAWING NO. 60334056/C1/GAT/4103.
I

A
RELOCATION OF
T25-125 3. THE LONGITUDINAL REINFORCEMENT SHALL NOT
BE LESS THAN 0.13% E.F. SHA TIN SEWAGE
oved:RCYK

4. THE EXTENT OF THE UNDRAINED TUNNEL TYPE TREATMENT WORKS


1b SHALL BE VERIFIED ON SITE AND AGREED
WITH THE PROJECT MANAGER/SUPERVISOR PRIOR TO CAVERNS
TO THE CONSTRUCTION ON SITE.
Appr

CONTRACT TITLE
RELOCATION OF SHA TIN SEWAGE
Checked:CYKY

A TREATMENT WORKS TO CAVERNS -


SITE PREPARATION AND
ACCESS TUNNEL CONSTRUCTION
A A
:AKW S

T20-150 T20-150
gner
Desi ni
ectM anagem entI i
t s:
al

AECOM Asia Company Ltd.

www.aecom.com
oj

2
Pr

2T3
2T3

2
0

2T4
T25

2T4

T25
0
T25

T25
2T40-125 2T40-125 2T32-125
2T32-125
11000
dgn

A
C1_GAT_4105.

S.O.P. T20-150
T20-150 B FEB. 19 WORKING DRAWING CYKY

A A SEP. 18 TENDER ADDENDUM NO.1 CYKY


4000\

- AUG. 18 TENDER DRAWING CYKY


C1\
CONTRACT\

2T40
2T32

2T32
2T40
NG\

2T32-125 T16/125x150 WORKING DRAWING


T16/125x150 2T32-125

2T32
DRAW I

2T40
2800

2800
2T32

2T40
2400
ON\

2T40-125 2T40-125 A1 1 : 50 MILLIMETRES


CAD PRODUCTI

4800 4800

2T32-125 2T32-125
STSTW \

T32 T32
2T32
2T32
A
60334056-

T16/125x300 T16/125x300
s\
2018
Docum ent

2T40-125 T32 2T40-125


T32
-
em ber

2T40 2T40
Sept
AECOM _DS01_AS\

4800 T20-150 T20-150 4800


21-

T32-125

R.C. DETAILS FOR PERMANENT LINING - UNDRAINED TUNNEL TYPE 1b


60334056 DC/2018/05
l
bent com :
ey.

MAIN ACCESS TUNNEL - PERMANENT


pw.

LINING R.C. DETAILS


as-

A
e by:chanws
\
PATH pw:\aecom -
l
otFi
Pl

60334056/ B
C1/GAT/4105A

You might also like