BA-437048 001 01 P H13 82551 NOTES:

1. METERING AND CONTROL PANELS, H13-MCP-601, 602


REV. NO. SHT. NO. DRAWING NUMBER INDEX PLANT NO. JOB ORDER/EWO NO.

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO.NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
AND H13-TCP-601, 602 ARE LOCATED IN SWITCHGEAR
BUILDING.

2. THE CT/CVT DATA WILL BE FINALIZED AFTER FINAL


APPROVAL OF CT/CVT SIZING CALCULATIONS
DRAWING NO. BA-437049.

3. ALL ANNUNCIATOR/ALARMS ARE OUTSIDE ABB’S


SCOPE OF WORK.

115kV OVERHEAD LINE


TO HAWIYAH BSP SUBSTATION
EXTENDED FROM HARADH GOSP 1
TYPICAL FOR ALL GOSP 115kV OVERHEAD LINE
TO HAWIYAH BSP SUBSTATION
EXTENDED FROM HARADH GOSP 1

H13-OSW-601 H13-OSW-603
1200A OISC 1200A OISC
H13-LA-601, H13-LA-604,
602, 603 605, 606

TO LOCKOUT TO LOCKOUT
TO DIFFERENTIAL SUPERVISION SUPERVISION TO DIFFERENTIAL
CL.C500 AT P1 RELAY RELAY PROTECTION RELAY P1 CL.C500 AT
PROTECTION RELAY
ADOPTED TAP OUTSIDE ABB’S OUTSIDE ABB’S ADOPTED TAP
C800 AT 600/5A H13-MCP-601 SCADA RTU PANEL H13-MCP-602 C800 AT 600/5A
SCOPE OF WORK SCOPE OF WORK
CORE-1 OUTSIDE ABB’S CORE-1
-1CT2 400/5A SCOPE OF WORK 400/5A -1CT2
600/5A 600/5A
MRCT CL.C500 AT 50 50 50 50
CL.C500 AT MRCT
H G W XA XA W G H
ADOPTED TAP 51 51 51 51 ADOPTED TAP
C800 AT 600/5A ALARM ALARM C800 AT 600/5A
CORE-2 P2 XA
86-T1 86-T2 XA P2 CORE-2
(NOTE-3) (NOTE-3)
400/5A ALARM (86-T1 OPERATED) ALARM (86-T2 OPERATED) 400/5A
STATUS (OPEN/CLOSE) STATUS (OPEN/CLOSE) H13-CB-602
H13-CB-601
SF6-1200A, 40kA
SF6-1200A, 40kA
REMOTE REMOTE CKT. BKR.
CKT. BKR. 43 43
-1
CS R G A A G R CS -2

LOCAL ALARM (CONT PNL LOSS OF OPR. DC) ALARM (CONT PNL LOSS OF OPR. DC) LOCAL
CONTROL (OPEN/CLOSED) CONTROL (OPEN/CLOSED)
STATUS (LOCAL/REMOTE) STATUS (LOCAL/REMOTE)
CL.C500 AT P2 ALARM (LOW SF6 GAS PRESS) ALARM (LOW SF6 GAS PRESS) P2 CL.C500 AT
ADOPTED TAP ADOPTED TAP
C800 AT 600/5A 50BF(FUTURE) 50BF(FUTURE) C800 AT 600/5A
CORE-2 CORE-2
-1CT1 400/5A 400/5A -1CT1
600/5A THIS CORE MEGAWATS MEGAWATS THIS CORE 600/5A
MRCT SHALL BE KEPT MEGAVARS MEGAVARS SHALL BE KEPT MRCT
CL.0.38 0.9 AT SHORTED A VOLTS VOLTS A SHORTED CL.0.38 0.9 AT
600A TAP 600A TAP
CORE-1 Wh W var AS AS var W Wh CORE-1
W VAR V V VAR W
600/5A P1 P1 600/5A

V V

VS VS

H13-DSW-602 H13-DSW-604
1200A 1200A
DISC SW. DISC SW.
H13-VT-601, 602, 603 H13-VT-604, 605, 606
-CVT1 JB -CVT2 JB
-CVT1 WDG#1 3 3 WDG#1 -CVT2
10A 3 3 10A REFERENCE DRAWINGS
SPARE SPARE
3 3 3 3
10A 10A PLAN AND SECTIONAL LAYOUT BA-437059
SPARE SPARE
3 3 3 3 LIST OF SYMBOLS AND LEGEND BA-437046
SPARE SPARE
3 3
WDG#2 SPARE SPARE WDG#2 EQUIPMENT 115kV ONE LINE DIAGRAM BA-437048
3 3
4A 4A
3-1 { CCVT 3-1 { CCVT
115 115 115 115 115 115
kV V V kV V V
3 3 3 3 3 3
200-200VA, 200-200VA,
CL 0.5/3P CL 0.5/3P

H13-LA-607 H13-LA-610
H13-TCP-601 H13-TCP-602
608,609 611, 612
RAISE/LOWER RAISE/LOWER
DV1 DV1 SCALE: NONE
XFR TAP POSITION XFR TAP POSITION
CORE-1 CORE-1
H13-XFR-601 H13-XFR-602 REVISION CERTIFICATION EDSD
200/5A LOCAL/REMOTE LOCAL/REMOTE 200/5A VERIFICATION
59/67MVA AOLTC AOLTC 59/67MVA
MRCT T2 LOCAL/REMOTE LOCAL/REMOTE T2 CT THIS INDICATES THAT REV. NO.
ONAN/ONAF, 65^C ONAN/ONAF, 65^C OF THIS DRAWING IS COVERED, FOR ALL
CONTROL NUMBER
Dyn, (SCADA) 43 43 (SCADA) Dyn, APPROVAL/CERTIFICATION REQUIREMENTS,
BY DRAWING COMPLETION CERTIFICATE (DCC) BY:
-4 -6
H13-CR-301 115kV-13.8kV 84 AUTO/MANUAL AUTO/MANUAL 84 115kV-13.8kV H13-CR-302 NO.:
. DATE:
-1 AVR AVR -2
400A Z=7% Z=7% 400A
10Sec. 10Sec.
ANN/SOE (NOTE-3) ANN/SOE (NOTE-3)
43 43
CS -3 -5 CS
TO TRAFO. TO TRAFO.
51N 51N
OUTSIDE ABB’S OUTSIDE ABB’S
SCOPE OF WORK) SCOPE OF WORK)
01 DEC.02 82551 CUR ZAB
AS-BUILT

51NT 51NT REV.


FROM FROM DATE JO/EWO DESCRIPTION ENGG. CERT. PMT OPRNS.
1200A BUS DUCT NO.
1 2 1200A BUS DUCT
OUTSIDE ABB’S TRIP TRIP DESIGN
OUTSIDE ABB’S THIS REVISION IS NOT TO BE USED FOR CONSTRUCTION REVIEW FOR
SCOPE OF WORK ALARMS ALARMS UNTIL CERTIFIED AND DATED. CERTIFICATION KEY DRAWINGS
SCOPE OF WORK
DESIGN CERTIFICATION
DRAWN BY ABB/AYUB PASHA CHECKED BY ABBAS DASTI
DATE STARTED 10-01-2003 DATE COMPLETED 11-10-2003
DISCIPLINE ENGINEER PASQUALE ZABTTA
H13-MCP-601 H13-MCP-602
PROJECT ENGINEER SILVANO CURTI

THIS DRAWING IS NOT TO BE CERTIFIED BY: SILVANO CURTI


USED FOR CONSTRUCTION (NAME)
UNTIL CERTIFIED AND DATED. SIGNATURE DATE 12-31-2003

26 49
63
PRI 71
63
SP1
63
SP2 63 71.1 71.1 63
63
SP2
63
SP1 71
63
PRI 49 26 SAUDI ARABIAN OIL COMPANY
REVIEW FOR KEY DRAWINGS REQUIRED x NOT REQUIRED
CONSTRUCTION AGENCY
OPERATIONS
OTHER

TO TRIP TO TRIP NO.: DIAGRAM


115 KV ONE LINE WING COMPLETION CERT DRAWING TYPE

13.8kV CB 13.8kV CB
E1L
OUTSIDE ABB’S OUTSIDE ABB’S NO.: WING COMPLETION C
RELAY AND METERING
SCOPE OF WORK SCOPE OF WORK WING COMPLETION C
NO.: GATHERING
TO 86-T1 TO 86-T2 HARADH GOSP-2 GAS
NO.: WING COMPLETION CERTIFICATE (DCC)
CONFIDENTIAL - downloaded by mawedwm on 5/15/2023 JOB ORDER/EWO NO.
HARADH
PLANT NO. INDEX
SAUDI ARABIA
DRAWING NUMBER SHT. NO. REV. NO.

82551 H13 P BA-437048 001 01


Saudi Aramco 2615 ENG. (03/99)