MID LANDING
1500
4500 250
R8-07-150
8T16-06
40mm Ø Circular hollow section handrail on,
40mm Ø CHS supports on,
C 60mm Ø CHS runner on, C
T12-01-150
60mm Ø CHS posts
150
150
T10-02-200 B2
R8-07-150
300
100mm A142 BRC reinfoced
200
8T16-06
walkway pavement 250
D D
T10-04-200-T2
T12-01-150 B1
T10-02-200 B2
E T12-03-150-T1 E
500
R8-05-150
8T16-06
335 1500 4200 1000
4500
F F
Plan Detail of walkway over the embankment slope 300
G G
REFERENCE:
2000
H A H
4000
J J
2000
ROAD EDGE
4500 1500 4200 1000
EMBANKMENT TOE
This document is the property of the TOTAL E&P UGANDA B.V. (TEPU) and it shall not be disclosed to third parties or reproduced
without the express written permission of the TOTAL E&P UGANDA B.V. (TEPU).
This document has been generated by an Electronic Document Management System. When printed it shall be considered as "for
information only". The controlled copy is the EDMS version and it is document holder's responsibility to make sure that latest version is
in use.
L Affiliate: UGANDA Site: TIL Project Phase: FE L
CCA-CPF
CCA/CPF ACCESS WALKWAY
WALKWAY STAIRCASE OVER EMBANKMENT SLOPE
ALPHA
ALPHA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
STR 001.DWG