You are on page 1of 1

REFERENCE DRAWINGS

DRAWING TITLE DRAWING NUMBER


PLOT PLAN FOR SV-1 STATION (FOR P/L STRETCH
1009-S1-CS-PPL-6001
FROM URIUMGHAT TO GOLAGHAT STATION)
STANDARD DRAWING FOR POLE INSTALLATION
VPC-SD-EL-011 / 012
(AREA LIGHT)
ELECTRICAL EARTING STANDARD INSTALLATION
DETAILS VPC-SD-EL-102/103-104/117/118/119

NOTES:-
1. ALL DIMENSIONS ARE IN MILLIMETERS, UNLESS SPECIFIED OTHERWISE.
2. SHARP BENDS SHALL BE AVOIDED IN ALL GROUNDING CONDUCTORS. SURFACE SHALL BE
THOROUGHLY SMOOTHED AND CLEANED BEFORE MAKING GROUNDING CONNECTION.
3. GROUND/EARTH STRIP SHALL BE BURIED AT THE DEPTH OF 600MM.
4. PIPE RACK AND PIPE SUPPORTS SHALL BE GROUNDED AFTER EVERY 30 METERS.
5. NON ELECTRICAL EQUIPMENTS EXPOSED TO LIGHTNING ( TANKS, COLUMNS, TALL METAL
STRUCTURE, LADDER, RAILING, GRATING, METALLIC GATES ETC.) SHALL BE CONNECTED TO
MAIN EARTH GRID.
47000 6. FENCING SHALL BE CONNECTED TO GROUND GRID AFTER EVERY 30 METERS DISTANCE.
GRID N:2913776.462 7. G.I STRIP SHALL BE CROSSED ACROSS THE ROAD USING ELECTRICAL ROAD CROSSING PIPES.
GRID N:2913776.387 8. JOINING OF G.I STRIPS SHALL BE DONE BY WELDING ONLY FOR BURIED PORTION. BOLTING MAY
GRID E:593295.264 GRID E:593342.184
BE USED FOR ABOVE GROUND STRUCTURE.THE WELDED PORTION SHALL BE SUITABLY
PAINTED WITH BITUMINOUS PAINT TO AVOID CORROSION.
1.0M WIDE 9. RE-BAR OF CONCRETE FOUNDATION OF THE BUILDINGS/ COLUMNS SHALL BE EARTHED WITH
EMERGENCY GATE STEEL COLUMNS/ G.I STRIPS OF 50X6 MM.
PLOT LIMIT 10.INSTRUMENTATION EARTH PITS SHALL BE CONNECTED TO MAIN ELECTRICAL EARTH PIT AT
ELECTRODE LEVEL. INSTRUMENTATION EARTH PITS.
11. Al. LIGHTNING CONDUCTOR FROM LIGHTNING PITS TO BE CONNECTED TO DOWN CONDUCTORS
FROM SHED / BUILDING COLUMNS.
DRAIN
12. ALL EARTHING TO BE EXTENDED AND CONNECTED TO THE EXISTING EARTH GRID.
13. ALL PROCESS EQUIPMENT SHALL BE EARTHED.
STARTING POINT 14. ALL EQUIPMENTS UPTO 250V AC SHALL BE PROVIDED WITH SINGLE EARTHING AND OTHER
DRAIN
SHALL BE DOUBLE EARTHED.
15. ALL JOINTS IN ABOVE GROUND PIPELINES, VALVES AND OTHER ASSOCIATED FACILITIES SHALL
BE MADE CONTINUOUS BY BONDING WITH EACH OTHER USING Cu. JUMPER CABLE ACROSS THE
FLANGES. THESE PIPELINES SHALL BE EARTHED AT ENTRY/EXIT POINTS AT BATTERY LIMIT.

TO GOLAGHAT STATION
16. THE MARKED LOCATION OF PITS, EARTH STRIPS/ WIRE, EARTH BUS ETC. ARE INDICATIVE ONLY.
THE EXACT LOCATION SHALL BE AS PER ACTUAL SITE CONDITIONS. THE EARTH STRIP/ WIRE
SHALL BE ROUTED THROUGH CABLE TRENCHES AS MUCH AS POSSIBLE.
17.LIGHTING POLE SHALL BE EARTHED BY 25mmX6mm GI STRIP, CONNECTED TO MAIN EARTH
GRID. ALL LIGHTING POLE JB SHALL BE EARTHED WITH 6mm Cu. CABLE (DOUBLE EARTHING).
18.FOR INSTALLATION DETAILS OF EARTHING SYSTEM, REFER STD DRAWING.
19.MINIMUM DISTANCE BETWEEN EARTH PITS AND CABLE TRENCHES SHALL BE 300MM.
N:1018.300 20.JB FOR POWER CABLE TERMINATION OF E/H VALVES & MOVs SHALL BE EARTHED USING
E:1038.550 25X6MM GI STRIP.
21.THE MIN. SIZES FOR CONNECTION OF ENCLOSURES OF ELECTRICAL/ NON ELECTRICAL
EQUIPMENT SHALL BE AS BELOW:
· SWITCHBOARD, STORAGE TANK AND COMPRESSOR - 50X6MM GI STRIP
· LIGHTING POLES, DISTRIBUTION BOARD - 25X6MM GI STRIP
· INSTRUMENT - 10MM² Cu. CABLE

4" VENT
EL.100.150
LEGENDS :-
SYMBOL MATERIAL DESCRIPTION
0
R1500
50 X 6 mm G.I EARTHING STRIP

25 X 6 mm G.I EARTHING STRIP

ELECTRICAL G.I EARTH PIT (EP)

PHYSICAL CONNECTION (WELDING/BOLTING)

AG
1 X125/100W LED FLP STREET LIGHTING FIXTURE,

UG
MOUNTED ON 9M HIGH POLE
1 X125/100W LED FLP STREET LIGHTING FIXTURE,
MOUNTED ON 4.5M HIGH POLE

50000
MTO:-

MATERIAL DESCRIPTION QTY. UNIT.

SV1 50 X 6 mm G.I EARTHING STRIP 80 mtr.


1022

25 X 6 mm G.I EARTHING STRIP 80 mtr.


N:1021.540
E:1040.600
ELECTRICAL G.I EARTH PIT (EP) 03 Nos

FROM URIUMGHAT NEW STATION


STARTING POINT
DRAIN

RTU/CP/PANEL
PORTA CABIN
6500X4000
MAIN GATE
4.0M WIDE

99.700 100.150
RTL

GUARD
ROOM
2000X2000

0 15.09.20 ISSUED FOR CONSTRUCTION SY VV AD


DRAIN

C1 25.07.20 ISSUED FOR REVIEW SY VV AD


GRID N:2913726.462 GRID N:2913726.462
GRID E:593295.264 GRID E:593342.264
REV. DATE DESCRIPTION PREP. CHKD. APPD.
41000

CLIENT:

ASSAM GAS COMPANY LTD.

PMC: VCS PROJECT


VCS QUALITY
CONSULTANTS PVT. LTD.
SERVICES PVT. LTD. (ENGINEERING)
PROJECT:
NAMBOR - KHORAGHAT - NUMALIGARH
GAS PIPELINE PROJECT
PLOT PLAN
TITLE:
ELECTRICAL OUTDOOR EATHING LAYOUT
FOR SV-1 STATION FROM URIUMGHAT TO GOLAGHAT STATION

SCALE: 1:150 TOTAL NO. OF SHTS:

SIZE JOB NO. DRAWING NUMBER REV.

A1 1009 1009-S1-EL-EAR-4001 0