You are on page 1of 1

CIVIL & STRUCTURAL PROJECT SPECIFIC DATA (PSD) FOR CONTRACTOR TO FULLY COMPLY WITH 2.

2. WELDINGS PRE CONSTRUCTION SURVEY SUB-STRUCTURE / ERSS SUPERVISION REQUIREMENT FOR PRE-CAST STRUCTURE MEMBER
GENERAL

CONCRETE MIX

₂ £

³ 3. BRACING, STAGING, TEMPORARY SUPPORT FOR FABRICATION & ERECTION OF STRUCTURE

¹
HOARDING
4. PAINTS LANDED NON-LANDED DEVELOPMENT
DEVELOPMENT

5. BOLTS AND SCREWS ² ³ ³

1. EXCAVATION
WORKS / ERSS

2. PILING DEMOLITION REQUIREMENTS

EQUIVALENT CONCRETE GRADE TABLE ¹


² CURTAIN WALLS
² ² ³

TIMBER STRUCTURE

POST INSTALLED REBARS & ANCHOR BOLTS


LANDED DEVELOPMENT DEMOLITION FOR BUILDING DEMOLITION FOR BUILDING
CONCRETE COVER TO STEEL REINFORCEMENT, INCLUDING LINK UP TO 5 STOREY HEIGHT MORE THAN 5 STOREY HEIGHT
·
· %
3. DEMOLITION WORKS
·
· %

EXPANSION BOLTS AND CAST-IN ANCHORS PRECAST CONCRETE


·
·

TYPE OF REINFORCEMENT ·
READY-MIXED CONCRETE (RMC)
FLOOR HARDENER
TEMPORARY WORKS

²
SITE WORKS / ECM ²

HANDRAIL / BARRIER
LAP LENGTH TO REINFORCEMENT STRUCTURAL STEEL INSPECTION & QUALITY CONTROL

MECHANICAL COUPLERS
FOR ALL GLASS, TEMPERED GLASS, ACRYLIC PANEL USED AS BARRIER / SWIMMING POOL WALL / GLASS
WALL
PREVENTING MUDDY WATERS FROM THE CONSTRUCTION SITES
CONCRETING

WORKS WITHIN THE RAILWAY CORRIDOR OR RAILWAY PROTECTION ZONE

·
WATERPROOFING

SHOP DRAWINGS / MISCELLANEOUS STRUCTURES (ARCH & M & E) NOT SHOWN IN STRUCTURAL DRAWING SPECIALISED TRADE

STRUCTURAL STEEL
1. GENERAL

WATERPROOFING ADMIXTURE

architecture
interiors TEAM DESIGN Architects Pte Ltd
·
FORMWORK DESIGN BY CONTRACTOR'S PE

· SINGLE QUALIFIED PERSON SYSTEM


C P LIM & PARTNERS LLP
²

M&E ROOMS / TANKS


·
·
·
BACK FILL MATERIAL FOR RETAINING & BASEMENT WALL ·
≥ ·
·
POWS Sim P K