CYLINDRICAL OPEN CAISSON FOR A WELL

PIER CUT AND COVER CONSTRUCTION ILLUSTRATION


FOUNDATION
WELL CAP

DESCRIPTION
1
GROUNG WATER
CLEAR DIA OF THE CYLINDER : 3.1m LEVEL
THICKNESS OF THE SECTION : 0.2m
DEPTH BELOW THE GROUNG : 4m
EXTENT OF CONCRETE SEAL : 1.5 M 1

1. CONSTRUCTION OF 2. CONSTRUCTION OF 3. DECKING, EXCAVATION


0.2 DIAPHRAGM WALL DECKING AND DIAPHRAGM WALL DECKING AND STRUT INSTALLATION
SAND FILLING PIN PILES AT LEFT AREA AND PIN PILES AT RIGHT AREA AT CENTRAL AREA
2.5

3.1
A A

CONCRETE SEAL
1.5 CURB
4. CONSTRUCTION OF MAIN 5. PAVEMENT RESTORATION 6. COMPLETION OF
SECTION AA CUTTING EDGE STRUCTURE IN SECTION UNDERGROUND STATION
0.2
(DOWN - UP)

PLAN

SEACTION AA TOP - DOWN CONSTRUCTION METHOD CONSTRUCTION SITE


SCALE -1: 50
RETAINING WALL
STRUT
4 TYPICAL STAGES OF A ROOF
DISTORTED
ROAD
SUCTION CAISSON EXTRA
DRAWDOWN TO
SLAB TO
BE
CONSTRUCTED PROPOSED
NATURAL ASSIST
DESCRIPTION UNDERGROUND
DRAWDOWN PENETRATION
STRUCTURE
DIA OF THE CAISSION VAN : 3m GRAVITY
DEPTH OF MARINE CLAY : 10m SMALL
+ENVIRONMENTAL
LOAD
DEPTH OF MARINE SAND : 10m VOLUME OF
TRAPPED 1. INSTALLATION OF 2. EXCAVATION &
WATER NON
COMPRESSIBLE
RETAINING WALL INSTALLATION OF STEEL
PLUG STRUT
DUCKING
MARINE STRUT ROOF SLAB ROOF
CLAY SLAB
ROOF
10 STRUT SLAB
STRUT FLOOR
SLAB

MARINE SKIN SKIN SKIN END


SAND FRICTION FRICTION FRICTION BEARING
STAGE 1 STAGE 2 STAGE 3 3. CONSTRUCTION OF 4. CONSTRUCTION OF 5. CONSTRUCTION OF 6 BACKFILLING &
STAGE 4
BEFORE INTIAL SUCTION TO IN-PLACE 10 UNDERGROUND STRUCTURE UNDERGROUND STRUCTURE UNDERGROUND STRUCTURE REINSTATEMENT
TOUCHDOWN PENTRATION ASSIST PESISTANT
BY PENETRATION TO VERTICAL
SELF-WEIGHT AND POSSIBLY LOADS
PROOF LOAD

SCALE - 1:200
COMPACTION
CASING CASING
SUSCTION ANCHOR BEFORE DRILL ROD GROUT CASING

AND AFTER INSERTION

BEFORE AFTER

WATER WATER IS
DEPTH PUMPED CUT
TO CREATE TOPIC
9000ft NEGATIVE
PRESSURE
UNDERWATER
ROV
1.5m
&UNDERGROUNG
SUCTION
ANCHOR
1.5m
L
SUCTION ANCHOR
AFTER INSERTION
SOIL
CONSTRUCTION
UNDER
1.5m UNDER SUCTION
PRESSURE
SELF
WEIGHT
STEP ONE:
PREDRILLED
STEP TWO:
INSERT
STEP THREE:
BEGIN PUMPING LOW
STEP FOUR:
WITHDRAW CASING
K GOKULAVISHAL
COMPACTION
GROUTING HOLE TO
COMPACTION
GROUT CASTING IN
SLUMP COMPACTION
GROUT MIX IN
AS STAGES ARE
COMPLETE UNTIL THE USN-1NS17AT035
DESIRED DEPTH. PREDRILLED HOLE. STAGES AND HOLE IS COMPLETE
SCALE -1: 50
WITHDRAW AT
CONTROLLED RATE
SEM- 8TH
CUT AND COVER CONSTRUCTION ILLUSTRATION