You are on page 1of 3

FINISHED GRADE

(MIN.)
760mm
MINIMUM CONTACT
AREA 50 SQ CM STEEL
( 8 SQUARE INCHES) COLUMN
COPPER GROUND
CABLE
2
25mm BARE COPPER
BENDS SHALL NOT EXCEED
90 DEGREES & BENDING
RADIUS SHALL NOT BE
SMALLER THAN 203 mm

3 METER x 19 mm DIA.
GROUND ROD

1.5M
EXOTHERMIC WELDED CONNECTION
GROUND ROD
3M BOND TO BUILDING
GROUND SYSTEM NOTES:

1. CONDUCTOR SIZE SHALL BE AS INDICATED ON PLANS.

2. EXOTHERMIC WELDS SHALL BE AS RECOMMENDED BY


MANUFACTURER FOR THE SIZE OF CONNECTION AND
MATERIAL INVOLVED.SEE DETAIL 5 ON SHEET SE-7.

COLUMN GROUNDING DETAIL BELOW GRADE GROUNDING ROD DETAIL


NOT TO SCALE NOT TO SCALE

TIS AFGHANISTAN
MRRD

ELICTRECAL/DESIGH Eng. ZABIHULLAH MOE/ISD SHEET NO.


MOE

REVIEWED BY
Ministry of Rural Ministry of Eduction PROJECT NAME
Rehabilitation and STANDARD SCHOOL CHECKED BY MOE/ISD
Department of DESIGN BY Eng. ZABIHULLAH AS SHOWN ( A3)
DESIGN
Development construction IN AFGHANISTAN DRAWING TITLE SOLAR WATER PUMP FOR 60 METERS GROUNDING.
WatSIP PREPLANNED BY
MOE/ISD APPROVED BY MOE/ISD DATE: April 2020
NO. DESCRIPTION SIGNS UNIT PIECES REMARKS

FINISHED GRADE

(MIN.)
760mm
COPPER GROUND
CABLE

3 METER x 19 mm DIA.
GROUND ROD


FINISHED GRADE

TIS AFGHANISTAN
MRRD

ELECTRCAL/DESIGH Eng. ZABIHULLAH MOE/ISD SHEET NO. FLASH FEMALE TOILET 6 COMPARTMENT, RCC AND WOODEN
MOE

REVIEWED BY
Ministry of Rural Ministry of Eduction PROJECT NAME TRUSS ROOF & BURNT BRICK MASONRY WALL
Rehabilitation and STANDARD SCHOOL CHECKED BY MOE/ISD
Department of DESIGN BY Eng. ZABIHULLAH AS SHOWN ( A3)
DESIGN
Development construction IN AFGHANISTAN DRAWING TITLE
WatSIP PREPLANNED BY
MOE/ISD APPROVED BY MOE/ISD DATE: April 2020 SOLAR SYSTEM FOR WATER PUMP 60 METERS LEGEND AND NOTS
TIS AFGHANISTAN
MRRD

ELETRECAL/DESIN Eng. ZABIHULLAH MOE/ISD SHEET NO. FLASH FEMALE TOILET 6 COMPARTMENT, RCC AND WOODEN
MOE

REVIEWED BY
Ministry of Rural Ministry of Eduction PROJECT NAME TRUSS ROOF & BURNT BRICK MASONRY WALL
Rehabilitation and STANDARD SCHOOL CHECKED BY MOE/ISD
Department of DESIGN BY Eng. ZABIHULLAH AS SHOWN ( A3)
DESIGN
Development construction IN AFGHANISTAN DRAWING TITLE
WatSIP PREPLANNED BY
MOE/ISD APPROVED BY MOE/ISD DATE: April 2020 SOLER SYSTEM FOR 60 METER.

You might also like