Professional Documents
Culture Documents
SHAABAN
a. Designer
b. inspector
c. Owner
d. None of the above
9 . I n sp ect io n reco rd s is v a li d f o r
a. 6 months
b. 1 year
c. 1 month
d. 2 weeks
1 0 . Ac co r di ng t o N EM A, w ha t i s t he de sig n c l a s sif ica t io n w it h po sit i v e
di s pla c e me nt p u mp s?
a. design A
b. design B
c. design C
d. design D
1 1 . Afte r f i re a la r m t e s t ing w hic h o f th e fo l lo w ing sy st e ms s ha l l r et u rn to it s
fun ctio na l o p era t io n.
a. HVAC
b. Suppression
c. Emergency
d. all of the above
1 2 . S ite s pec if i c so f t w a re sha ll i ncl u de B o t h o f:.
Q 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
EXAM-2 BY: Eng. Ibrahim
1 – dra w S. L.D f o r ( 2 B + G +1 0 )
2 - S TO RE D E N ER G Y t est ed a s pe r
a. NFPA72
b. NFPA101
c. NFPA 110
d. NFPA 111 (NFPA72-2.2)
3 – T IM E FO R L I GH T IN G WH E N CH A N G F RO M SO U RC PO W E R TO
EM ER G E NC Y P O W E R ?
a. 3 SEC
b. 10 SEC
c. 30 SEC
d. 1 MIN
4 – D EV IC E U S E TO S TO R E S I NS U SO I D AL
a. UPS
b. DISEL
c. PGS
5 – E ACH T H I N G B E CO M PL E T WI TH NF P A 7 2 O NL Y O N E D O S EN T
a. SMOK DETECTOR TEST
b. HEAT DETECTOR TEST
c. INSPECTION
d. DISCHARGE SUPPRTION SYSTEM
6 – CA RB O N M O NO X I DE TE S T ED
a. MONTHLY
b. SEMIANNUAL
c. ANNUAL
7 – E NS S UR E CO M PL I AN CE W I TH APP RO V ED D RA W IN G ‘
a. INITIAL TEST
b. INITIAL INSPECTION
c. periodic test
d. periodic inspection
8 – to en s ur e sy st e m o p era t io n a c co r da n ce de s ig n
a. INITIAL TEST
b. INITIAL INSPECTION
c. periodic test
d. periodic inspection)
9 – a b no r ma l co n di t io n in sy st e m d ue to fa u lt
a. Trouble Condition
b. Normal Condition
c. Supervisory Condition
1 0 - sy st e ms , a n d co mp o ne nt s a re fu nct io ni ng a s de sig ne d a nd no a b n o r ma l
co n dit io n e xi st s.
a. Trouble Condition
b. Normal Condition
c. Supervisory Condition
Q 1 2 3 4 5 6 7 8 9 10 11 12 13 14
A