You are on page 1of 1

APEX LINE +3.50 M. APEX LINE +3.50 M.

150 450

150 450
TOP OF BEAM +2.85M. TOP OF BEAM +2.85M.

CEILING HEIGHT CEILING HEIGHT


ELEV. +2.70 M. ELEV. +2.70 M.
3,500

3,500
2,700

2,700
FFL ELEV. +0.20 M. FFL ELEV. +0.20 M.
200

200
NGL ELEV. ±0.00 M. NGL ELEV. ±0.00 M.

1 ELEVATION 01 2 ELEVATION 02

APEX LINE +3.50 M. APEX LINE +3.50 M. APEX LINE +3.50 M.


150 450

150 450

150 450
TOP OF BEAM +2.85M. TOP OF BEAM +2.85M. TOP OF BEAM +2.85M.

CEILING HEIGHT CEILING HEIGHT CEILING HEIGHT

685
ELEV. +2.70 M. ELEV. +2.70 M. ELEV. +2.70 M.
600.0000

355
325.0000
3,500

3,500

3,500
2,700

2,700

2,700
FFL ELEV. +0.20 M. FFL ELEV. +0.20 M. FFL ELEV. +0.20 M.
200

200

200
150

150
NGL ELEV. ±0.00 M. NGL ELEV. ±0.00 M. NGL ELEV. ±0.00 M.

3 ELEVATION 03 4 ELEVATION 04 5 SECTION THRU A

REPUBLIC ACT 9266(SEC 20)5 SEAL PROJECT TITLE : APPROVED BY: DESIGNED BY: SHEET CONTENT : SHEET NUMBER

CIVIL ENGINEER / ARCHITECT


A
OWNER
3

PRINTED : COMPUTER DRAFTED, DO NOT REVISED MANUALLY

You might also like