PARAPET WALL LINE +6100 PARAPET WALL LINE +6100

0.20

0.20
HIGHEST ROOF APEX +5900 HIGHEST ROOF APEX +5900

1.20

1.20
2.05

2.05
LOWEST ROOF APEX +4700 LOWEST ROOF APEX +4700

0.65

0.65
TOP OF THE BEAM +4050 TOP OF THE BEAM +4050

0.30

0.30
CEILING LINE +3750 CEILING LINE +3750

3.50

3.50
FIRE WALL

FINISH FLOOR LINE +550 FINISH FLOOR LINE +550


0.20 0.10

0.20 0.10
PORCH LEV. +450 PORCH LEV. +450
0.25

0.25
CARPORT LEV. +200 CARPORT LEV. +200
ROAD LEV. +000 ROAD LEV. +000

PROPOSED BUNGALOW RESIDENCE PROPOSED BUNGALOW RESIDENCE


1 REAR ELEVATION 1 FRONT ELEVATION
A-1 SCALE 1:100M A-1 SCALE 1:100M
0 0.5 1 2 3 4 5 6

PARAPET WALL LINE +6100 PARAPET WALL LINE +6100


0.20

0.20
HIGHEST ROOF APEX +5900 HIGHEST ROOF APEX +5900
1.20

1.20
2.05

2.05
LOWEST ROOF APEX +4700 LOWEST ROOF APEX +4700
0.65

0.65
TOP OF THE BEAM +4050 TOP OF THE BEAM +4050
0.30

0.30
CEILING LINE +3750 CEILING LINE +3750

FIRE WALL FIRE WALL


3.50

3.50
FINISH FLOOR LINE +550 FINISH FLOOR LINE +550
0.20 0.10

0.20 0.10
PORCH LEV. +450 PORCH LEV. +450
0.25

0.25
CARPORT LEV. +200 CARPORT LEV. +200
ROAD LEV. +000 ROAD LEV. +000

PROPOSED BUNGALOW RESIDENCE PROPOSED BUNGALOW RESIDENCE


1 LEFT ELEVATION 1 RIGHT ELEVATION
A-1 SCALE 1:100M A-1 SCALE 1:100M
0 0.5 1 2 3 4 5 6

PARAPET WALL LINE +6100 PARAPET WALL LINE +6100

0.20
0.20

HIGHEST ROOF APEX +5900 HIGHEST ROOF APEX +5900

1.20
1.20

2.05
2.05

LOWEST ROOF APEX +4700 LOWEST ROOF APEX +4700

0.65
0.65

TOP OF THE BEAM +4050 TOP OF THE BEAM +4050

0.30
0.30

CEILING LINE +3750 CEILING LINE +3750

3.50
3.50

0.15

FINISH FLOOR LINE +550


0.10

FINISH FLOOR LINE +550


0.20 0.10
0.20 0.10

0.10
PORCH LEV. +450 PORCH LEV. +450
0.25
0.25

CARPORT LEV. +200 CARPORT LEV. +200


ROAD LEV. +000 ROAD LEV. +000

PROPOSED BUNGALOW RESIDENCE PROPOSED BUNGALOW RESIDENCE


1 SECTION ALONG X ELEVATION 1 SECTION ALONG Y ELEVATION
A-1 SCALE 1:100M A-1 SCALE 1:100M