Professional Documents
Culture Documents
RD
SERVICE REQUIREMENT,3
PARTY SCOPE OF WORK
Replacement Bushing Crosshead LP Gas Compresor A
2HHE-VB2(9”X7.5”X12”)
LP GAS COMPRESSOR A
DATE DESCRIPTION
11-12-2021 - 16-12-2021 • Quarantine four point in Surabaya hotel.
17-12-2021 • Moving to Madura area, and safety HES induction training at FPSO armada
18-12-2021 • Prepare material and tools use to overhaul replace bushing to pin bushing
• Cleaning bushing new and pin bushing new at workshop (maintenance)
22-12-2021 • Install bushing crosshead and pin bushing new at workshop maintenance
LP GAS COMPRESSOR A
DATE DESCRIPTION
23-12-2021 • Install crosshead to compressor A ,at 2nd stage
• Install counterweigh crosshead
• Install piston
• Install jamnut/supernut river hawk
• Measure bumping clearance
nd
• Checked oil scraper packing at 2 stage
st nd
26-12-2021 • Leaking test valve suction oe and ce ,1 and 2 stage Compressor A
27-12-2021 • Make list of material for 5.000 and 10.000 OH compressor
• Check material stock for OH 5.000 and 10.000 LP gas compressor
28-12-2021 • Service and repair condensate pump alpha
• Completed learning test compressor alpha
• Start up compressor alpha
29-12-2021 • Start up compressor A
• Start monitoring and waiting repair for condensate pump.
• Re-start up again and monitoring
30-12-2021 • Monitoring and preparation start up compressor A
• Start monitoring
31-12-2021 • Start monitoring and running compressor A
• Prepare for document and planning to demob
LP GAS COMPRESSOR A
DATE DESCRIPTION
01-01-2022 • Back to Surabaya
• Leave juanda airport to return pekanbaru
• Perform Original Bumping clearance recorded before outer head disassembled, compressor
alpha
• Remove the outer head, compressor alpha
• Remove the piston with rod assembled for compressor alpha
• Remove the crosshead assembly
• Remove suction valve outer and crank end compressor alpha
Re assembly
• Renewal the crosshead bushing new and pin bushing new compressor alpha 2 nd stage
• Installing and joint supernut to crosshead compressor alpha 2 nd stage
• Installing the crosshead pin and joint with connecting rod, compressor alpha 2nd stage
• Re installing suction valve 2nd stage compressor alpha
• Final cleaning and housekeeping
• To replace rider ring and piston ring,packing ring set,suction and discharge
valve,gasket kit,main bearing,connecting rod bearing,crankshaft oil seal and oil filter
• To replace pin bushing crosshead,bushing crosshead,bushing connecting rod,kompresor
B
• Suggestion to add scope of work oil flushing in 5000 PM
• Suggestion scope of work NDT:
1. NDT crosshead
2. NDT liner cyl
3. NDT conecting rod
4. NDT cap main bearing
5. NDT main frame
6. NDT frame crosshead
7. NDT pulsation dampener suction,discharge stg1,stg 2
8. NDT all bushing and bearing compressor
6. Recommendation Parts List for 5.000 and 10.000 hours
I. FRAME 2 CYLINDER
MLH62644DP1G4N (Page 4 of 47)
Item No.
on Description PN Qty UOM
Drawing
8 GASKET W30765 1 PCS
19 BREATHER W82559HIM 1 PCS
2 SHELL MAIN BEARING 1R74098AIM 2 PCS
26 GASKET FRAME COVER W55938P1 4 PCS
24 BOLT 35A2D323 10 PCS
2 SHELL MAIN BEARING 1R74098AIM 5 PCS
3 GASKET W30766P1 1 PCS
6 GASKET W30764 2 PCS
8 GASKET W30765 1 PCS
IV. CROSSHEAD
MLH54288G24 (Page 11 of
47)
Item
No. on Description PN Qty UOM
Drawing
2 BUSHING R71921B 4 PCS
3 SHOE CROSSHEAD 1H27213B 4 PCS
6 SHIM SET X-HEAD 2VG493IM 4 PCS
7 PIPE X HEAD OIL W145445 2 PCS
8 PIN CROSSHEAD R71923P1 2 PCS
9 PIN GROOVE 29A13F106IM 4 PCS
V. SCRAPPER OIL
MLH57757DG1 (Page 19 of
47)
Item No.
on Description PN Qty UOM
Drawing
3 RING OIL SCRAPER R79480T5BIM 4 SET
4 RING PACKING 2A11T48IM 4 SET
X. VALVE INLET
MLH44432XG4 (Page 33 of
47)
Item No.
on Description PN Qty UOM
Drawing
VALVE INLET MLH44432XG4 4 PCS
XVI. PISTON
MLF33092G4 (Page
41 of 47)
Item No.
on Description PN Qty UOM
Drawing
2 RING PISTON WIN43021RJ49IM 8 PCS
3 RING RIDER WIN43020PJ55IM 8 PCS