Field Service Repo rt

Subject/title Karapan Armada Sterling III,Indonesia 2022-01-01


Location Date

RD
SERVICE REQUIREMENT,3
PARTY SCOPE OF WORK
Replacement Bushing Crosshead LP Gas Compresor A
2HHE-VB2(9”X7.5”X12”)

Project : Replacement Bushing Crosshead LP Gas Compresor


A Customer Name : PT. Amada Gema Nusantara
Contact PT.fajar mas murni : Iqwal Zulfetra, iqwal@fajarmasmurni.com
Field Servce Representative : Doni Ashari , Sefriyandri
Order’s File ref : PO#4500211710

Equipment Number : 2HHE-VB2(9”X7,5”X12”)


Product Type : LP Gas Compresor
Type of Activity : Replacement Bushing Crosshead Lp Gas Compresor
A Mobilization date : 2021-12-11
Demobilization date : 2022-01-01
Client Contact Name : Agustinus Krovan

Prepared by Approved by Acknowledge by


3. Daily report

LP GAS COMPRESSOR A
DATE DESCRIPTION
11-12-2021 - 16-12-2021 • Quarantine four point in Surabaya hotel.

17-12-2021 • Moving to Madura area, and safety HES induction training at FPSO armada

18-12-2021 • Prepare material and tools use to overhaul replace bushing to pin bushing
• Cleaning bushing new and pin bushing new at workshop (maintenance)

19-12-2021 • Kick of meeting (tailgate meeting)


• Prepare and installation scaffolding with scaffolding crew’s
• Dismantled to cover packing rod
• Dismantled to cover frame crosshead
• Dismantled to cover distance piece

20-12-2021 • Dismantled to cover head compressor


• Measuring bumping clearance piston to cyl crank end and outer end
• Measuring clearance crosshead to diametral frame
nd
• Measuring run out piston rod at 2 stage
LP GAS COMPRESSOR A
DATE DESCRIPTION
21-12-2021 • Dismantled river hawk supernut/jamnut 2nd stage
• Dismantled piston rod 2nd stage
• Balancing (crosshead, jamnut, pin crosshead)

22-12-2021 • Install bushing crosshead and pin bushing new at workshop maintenance
LP GAS COMPRESSOR A
DATE DESCRIPTION
23-12-2021 • Install crosshead to compressor A ,at 2nd stage
• Install counterweigh crosshead
• Install piston
• Install jamnut/supernut river hawk
• Measure bumping clearance
nd
• Checked oil scraper packing at 2 stage

24-12-2021 • Install cover head at 2nd stage


• Retourque cover head compressor 2nd stage
• Install wire lock nut for counterweigh crosshead 2nd stg
• Dismantled cover head crosshead 1st stg compressor A
st
• Dismantled cover valve and valve compressor 1 stg comp A
LP GAS COMPRESSOR A
DATE DESCRIPTION
25-12-2021 • Measuring bumping clearance piston outer end and crank end 1st
stg compressor alpha
• Measuring bottom clearance piston to liner at 1st stg compressor A
st
• Measuring run out rod piston compressor at 1 stg compressor A

st nd
26-12-2021 • Leaking test valve suction oe and ce ,1 and 2 stage Compressor A
27-12-2021 • Make list of material for 5.000 and 10.000 OH compressor
• Check material stock for OH 5.000 and 10.000 LP gas compressor
28-12-2021 • Service and repair condensate pump alpha
• Completed learning test compressor alpha
• Start up compressor alpha
29-12-2021 • Start up compressor A
• Start monitoring and waiting repair for condensate pump.
• Re-start up again and monitoring
30-12-2021 • Monitoring and preparation start up compressor A
• Start monitoring
31-12-2021 • Start monitoring and running compressor A
• Prepare for document and planning to demob
LP GAS COMPRESSOR A
DATE DESCRIPTION
01-01-2022 • Back to Surabaya
• Leave juanda airport to return pekanbaru

4. Completed scope of work

Diassembley Gas Compressor Alpha

• Perform Original Bumping clearance recorded before outer head disassembled, compressor
alpha
• Remove the outer head, compressor alpha
• Remove the piston with rod assembled for compressor alpha
• Remove the crosshead assembly
• Remove suction valve outer and crank end compressor alpha

Re assembly

• Renewal the crosshead bushing new and pin bushing new compressor alpha 2 nd stage
• Installing and joint supernut to crosshead compressor alpha 2 nd stage
• Installing the crosshead pin and joint with connecting rod, compressor alpha 2nd stage
• Re installing suction valve 2nd stage compressor alpha
• Final cleaning and housekeeping

5. Recommendation for next Overhaul

• To replace rider ring and piston ring,packing ring set,suction and discharge
valve,gasket kit,main bearing,connecting rod bearing,crankshaft oil seal and oil filter
• To replace pin bushing crosshead,bushing crosshead,bushing connecting rod,kompresor
B
• Suggestion to add scope of work oil flushing in 5000 PM
• Suggestion scope of work NDT:
1. NDT crosshead
2. NDT liner cyl
3. NDT conecting rod
4. NDT cap main bearing
5. NDT main frame
6. NDT frame crosshead
7. NDT pulsation dampener suction,discharge stg1,stg 2
8. NDT all bushing and bearing compressor
6. Recommendation Parts List for 5.000 and 10.000 hours
I. FRAME 2 CYLINDER
MLH62644DP1G4N (Page 4 of 47)
Item No.
on Description PN Qty UOM
Drawing
8 GASKET W30765 1 PCS
19 BREATHER W82559HIM 1 PCS
2 SHELL MAIN BEARING 1R74098AIM 2 PCS
26 GASKET FRAME COVER W55938P1 4 PCS
24 BOLT 35A2D323 10 PCS
2 SHELL MAIN BEARING 1R74098AIM 5 PCS
3 GASKET W30766P1 1 PCS
6 GASKET W30764 2 PCS
8 GASKET W30765 1 PCS

II. FRAME 2 CYLINDER


MLH65710G3 (Page 7 of 47)
Item
No. on Description PN Qty UOM
Drawing
7 SHOE THRUST BEARING R74079IM 2 PCS
9 BOLT MAIN BEARING W25306 5 PCS

III. CONNECTING ROD


MLH53593AG5 (Page 10 of 47)
Item
No. on Description PN Qty UOM
Drawing
2 BUSHING CON ROD EBHP0001 2 PCS
3 BOLT CON ROD R74322IM 2 PCS
7 BOX CRANK PIN 1R74099AIM 2 PCS

IV. CROSSHEAD
MLH54288G24 (Page 11 of
47)
Item
No. on Description PN Qty UOM
Drawing
2 BUSHING R71921B 4 PCS
3 SHOE CROSSHEAD 1H27213B 4 PCS
6 SHIM SET X-HEAD 2VG493IM 4 PCS
7 PIPE X HEAD OIL W145445 2 PCS
8 PIN CROSSHEAD R71923P1 2 PCS
9 PIN GROOVE 29A13F106IM 4 PCS
V. SCRAPPER OIL
MLH57757DG1 (Page 19 of
47)
Item No.
on Description PN Qty UOM
Drawing
3 RING OIL SCRAPER R79480T5BIM 4 SET
4 RING PACKING 2A11T48IM 4 SET

VI. PACKING PLATE PARTITION


MLH65188DG4 (Page 21 of 47)
Item No.
on Description PN Qty UOM
Drawing
2 RING PACKING R87096E728T48IM 4 SET

VII. PACKING ROD


MLH65180KEKG2 (Page 23 of
47)
Item No.
on Description PN Qty UOM
Drawing
4 GASKET SPIRAL WOUND DRGAGE0508X0524 6 SET
3 O-RING 20A11EM012 40 PCS
3 O-RING 20A11EM013 40 PCS
6 RING PACKING - RTB R87096C728BT48 24 PCS
7 RING PACKING PURGE R87096E728T48IM 8 PCS

VIII. CYLINDER LINERED


MLH66187AG2 (Page 28 of 47)
Item No.
on Description PN Qty UOM
Drawing
7 STUD R78164VX08021 6 PCS
5 NUT 46A4K11 6 PCS
4 WASHER R83707T10 6 PCS
6 O RING VBZP0001T454IM 4 PCS
25 GASKET WATER COVER H60798 3 PCS
IX. PISTON
MLF33092G3 (Page
31 of 47)
Item No.
on Description PN Qty UOM
Drawing
2 RING PISTON WIN43021RK38IM 8 PCS
3 RING RIDER WIN43020PK45IM 4 PCS

X. VALVE INLET
MLH44432XG4 (Page 33 of
47)
Item No.
on Description PN Qty UOM
Drawing
VALVE INLET MLH44432XG4 4 PCS

XI. VALVE DISCHARGE


MLH44433XG5 (Page 34 of 47)
Item No.
on Description PN Qty UOM
Drawing
VALVE DISCH MLH44433XG5 4 PCS

XII. ACCESS VALVE INLET


MLH44436MG3 (Page 35 of 47)
Item
No. on Description PN Qty UOM
Drawing
2 O RING VBZP0001T362IM 6 PCS
3 RING BACKUP 90A11AF362IM 6 PCS
5 GASKET VALVE SEAT 30A11F0618X09IM 6 PCS

XIII. ACCESS VALVE DISCH


MLH44437MG30 (Page 36 of 47)
Item No.
on Description PN Qty UOM
Drawing
2 O RING VBZP0001T362IM 6 PCS
3 RING BACKUP 90A11AF362IM 6 PCS
7 GASKET VALVE SEAT 30A11F0618X09IM 6 PCS
XIV. ACCESS VALVE DISCH
MLH44437MF51 (Page 46 of 47)
Item
No. on Description PN Qty UOM
Drawing
2 O RING VBZP0001T362IM 6 PCS
3 RING BACKUP 90A11AF362IM 6 PCS
7 GASKET VALVE SEAT 30A11F0618X09IM 6 PCS

XV. CYLINDER LINERED


MLH66187CG2 (Page 38 of 47)
Item
No. on Description PN Qty UOM
Drawing
6 O RING VBZP0001T451IM 4 PCS
3 STUD R78164MX09027 6 PCS
4 WASHER R83707T10 6 PCS
5 NUT 46A4K11 6 PCS
18 STUD R78164VX07019 8 PCS
19 NUT 38A4K9 8 PCS

XVI. PISTON
MLF33092G4 (Page
41 of 47)
Item No.
on Description PN Qty UOM
Drawing
2 RING PISTON WIN43021RJ49IM 8 PCS
3 RING RIDER WIN43020PJ55IM 8 PCS

XVII. VALVE INLET


MLH44432XF2 (Page 43 of
47)
Item No.
on Description PN Qty UOM
Drawing
VALVE INLET MLH44432XF2 4 PCS

XVIII. VALVE DISCHARGE


MLH44433XF2 (Page 44 of 47)
Item No.
on Description PN Qty UOM
Drawing
VALVE DISCH MLH44433XF2 4 PCS
XIX. ACCESS VALVE INLET
MLH44436MF3 (Page 45 of 47)
Item No.
on Description PN Qty UOM
Drawing
5 GASKET VALVE SEAT 30A11F0618X09IM 6 PCS
2 O RING VBZP0001T432IM 6 PCS
3 RING BACK UP 90A11AF432IM 6 PCS
6 SETSCREW 109A2S1 15 PCS