Professional Documents
Culture Documents
To,
Mr. Shashikant Patil.
Final bill for “Architectural Design & Site Development Consultancy Work” for Farm
House at Vangaon.
Please note that the ground floor of the Farm House considered in construction area.
Herewith enclosed are construction area calculations.
Kindly note that
Total Site Development Area (swimming pool) = 545 SFT X Rs. 50/- = Rs. 27250/-
Note:
Following services is considered free of cost
site development except swimming pool,
Interior finishes and false ceiling design work’
Kindly note that
A) Total Fees for “Architectural Design & Site Development Consultancy Work”
= Rs. 1,51,990/-
Stage 1
Stage 2
Stage 4
After completion of 1st slab level. 60% Of The Total Fees Payable.
Stage 7
After completion of brick work & Plaster. 80% Of The 215000/- Total Fees Payable.
Stage 6
After completion of Swimming Pool, Painting and 100% Of The Total Fees Payable.
finishes.
Total Fees for Architectual Design & Site Development = Rs. 1,51,990/-
Now at present the work has been completed 100%,
So the value of the contract work comes = Rs. 1,51,990/-
Fees Received Apr2021 = Rs. 25,000/-(cash)
Yours Faithfully,