You are on page 1of 2

^7/N7/NL.

rllt'tlIlI
Certificate No. 1 1 33S/GBBPAN
Date: March 24,2020
ftrr^ltrt
\/r\7/7 7'
succtFtNEtct
lssuing Office:
J r' Arte ri ro r ci b itu ns No;
J;3ill'i8rt"i e'rgi?'d,it1?ffi B
Email: bawono@sucofndo.co.id

REPORT OF ANALYSIS
The sample was submitted by client with the following identification '. -
CLIENT : PRO INTERTECH INDONESIA, PT.
PROJECT : BP TANGGUH EXPANSION PROJECT.
ADDRESS : Bangka Raya No. 33 A Rt. 001 Rw, 011
Pela Mampang, Mampang Prapatan. .
JAKARTA SELATAN.
ryPE OF SAMPLE BASE COURSE.
DATE OF RECEIVED 13t03t2020.
TEST REQUIRED Base Corse.
DESCRIPTION OF SAMPLE Form : Base Course.
WeighWolume : 1 Sample.
Packing : Plastic bag.
SAMPLE IDENTIFICATION Code: B 1 M.
DATE OF ANALYSIS 13I 03 I 2020 to 23 I 03 12020.
YOUR REFERENCE
Result:
Parameter Unit Value Reference

Particle size distribution attached ASTM C136.14


Plastic limits % NP

Liquid limits ok NP ASTM D4318-17


Plasticity index % NP

Compaction.test modified effort gr/cm3 2,063


ASTM D1557.12
Cptimum moisture content % 7,27
o/o
CBR Laboratory (soaked) 94,18 ASTM D1883-16
LA. Abrasion test % 26,36 ASTM C131.14
NazSOn Soundess Test (fine aggregate) % 4,04
ASTM C88-18
NazSOa Soundess Test (coarse aggregate) Yo 3,47

The Attachment available is an integral part of this certificate.


"This the result (s) related to the sample (s) submitted only and the repoft/ceftificate cannot be
with the prior approval in witing from Sucofindo Laboratory. This Celifrcatefteporl is issued copy of which is available
upon rcquest or may be accessed at www.sucofindo.co.id".

c8T500039920501 0

Illffi iltililtililll]ililililtilliltil
3475524
scr-2007A.
Attachment
Certificate No. 1 1 338/cBBPAN
Date: March 24,2020
lssuing Office:
Phone/Facs: +62 21 88321 176/88321 166
Page 1 of 1 Jl. Arteri Tol Cibitung No. '1, Cibitung Bekasi 17520, lndonesia
Email: julianto@sucofi ndo.co.id

REPORT OF ANALYSIS

P ARTICLE S IZE D IS TRI B UTIO N


AGGREGATE - BASE A

Reference :ASTM C136 1 4 Commencementlate :17tO3t2O2O


JobNo. :5010.0399 Completed dale i 18lO3l2O2O
Client INDONESIA
:PT. PRO INTERTECH Sample prepared by : MJ
Project : BP Tangguh Expansion Project Tested by : YR
Client sample lD : BASE 1-M Checked by : RF
Lab. Sample lD :028.20

W eig ht retain ed Weight retained Cumulative Cum ulative pass


Size fraction (m m) (%)
(s r) (%) retained (% )
plu s 75,00 0 0,00 0,0 0 100,00
75 -
50,00 0 0,00 0,0 0 '100,00
50 -
37,50 0 0,00 0,0 0 '100,00
37.5'- 25,00 0 0,00 0,0 0 100,00
25 - 9,50 1 060 40,47 40,47 59,53
9.5 - 4,75 407 15,55 56,02 43,98
4.7 5 - 2,00 5 8'1 22.18 7 8,20 21 ,80
2 - 0,425 400 15 ,27 93,47 6,53
0.425 - 0,075 122 4,66 98,13 1 ,87
pan 49 1 ,87 1 00,00 0,00
Total 2.6 19 1 00,00

90

BO
s 70
o
6
(E 60
CL
o 50

s5 40 I
/
tr 30 12
/
o 20

10

0
0 10 1 ,00 10,00 100,00

Sieve opening (mm)

Base CoutseAr.
'/ /r€-^-^

;,,, ^{:.
tl,ih

You might also like