Line History Sheet for CS Piping without PWHT

Reliance Industries Limited


Project RIL PLANT/Unit No Aromatics/ Report No:
Name of Contractor CR Asia Capex/MOC/FCO No Date: 28.05.2020
ISO/Line Number With Rev No 262-FV 39 Piping Line Class MPT/DPT % 100%
P&ID No:/PTW No. ITP No. & Rev RT/UT % NA

Dimensional, Alignment & Final DPT/MPI Hardness test


Root DPT Report Weld Visual RT/UT Report Pad Test Report
Type of Fitup check Report Report
Sl No Joint No. Size (NB) Thk(mm) Welder No. WPS No Remarks
Joint
Exe Insp
Cont. Date No Date Cont. Date No Date No Date No Date No Date
Engineer Engineer

1 J01 BW 2" 5.54 28.05.20 0937 14118 28.05.20 28.05.20 28.05.20 NA NA NA NA NA NA

2 J02 BW 3" 7.62 28.05.20 0937 14118 28.05.20 28.05.20 28.05.20 NA NA NA NA NA NA

3 J03 BW 3" 7.62 28.05.20 0937 14118 28.05.20 28.05.20 28.05.20 NA NA NA NA NA NA

4 J04 BW 3" 7.62 28.05.20 0937 14118 28.05.20 28.05.20 28.05.20 NA NA NA NA NA NA

Sheet of
Note: Welded support shall also to be included in Joint Number
RIL Inspection
Contractor RIL Execution Engineer
Engineer
Signature

Name
Date