Professional Documents
Culture Documents
To,
MSIL Projects
Dear Sir/Madam,
We acknowledge with thanks the receipt of your valuable enquiry referred above, we are hereby
pleased to furnish the offer as under which consists of this covering letter and the following
annexure:
Please feel free to contact the undersigned in case you require any further clarifications or
information.
KAMAL A
SEIPL, Bangalore
Page 1 of 11
ANNEXURE-I
TECHNICAL SPECIFICATION
The capacitors shall have low-loss, units tested in accordance with IS 13340-1993/IS 13341-1992,
IEC 60831 part 1&2. Each element is of a self-healing type and manufactured using metallized
polypropylene film.
A protection system shall be provided to each capacitor which shall comprise, integral discharge
resistor and overpressure disconnector device (PSD). The discharge resistor provided, ensure that
the capacitor is discharged to a voltage not exceeding 50 V measured at the capacitors terminals,
one minute after disconnection from the power supply.
Scope
Schneider Scope:
Design, manufacture and supply of Active Harmonic filter AHF.
Customer Scope:
Installation of AHF/APFC/Hybrid panels, related power and control cabling, mounting and
cabling of CT’s, testing and commissioning.
Supply of Power cables, CT control cables, Sensing CT, Subtraction CT (if neededs) hardware
required for Installation of AHF.
Providing suitable space. Ensure adequate air ventilation for proper functioning of panel.
Civil work and Cable trench / ducts.
Clearance from Electrical inspectorate and/or any other government authorities.
Page 2 of 11
Customer CT requirements
AHF sensing CT: please install 3 x X/5A, Cl:1.0 15VA CT’s on the main Incomer. The output of
these CT’s to be connected to AHF sensing CT input terminals, X=Maximum load current of
the connected loads.
Subtraction CT: Please install 3 x Y/1A Cl:1.0 15VA CT’s on the incoming power cable of the
capacitor bank. This CT can be split core CT as required per site conditions.
Both the above CT’s (AHF main sensing CT & Subtraction CT’s on APFC) should be of same
ratio. Eg. If X=5000A then Y=1000A. So, the same ratio of 1000 is maintained.
Technical reason for subtraction CT installation: If AHF and APFC are going to be in the same
bus section. AHF should not see APFC as a Load, So APFC Should be subtracted from main
signal input to AHF.
APFC Relay sensing CT: One number CT to be installed on R phase of main incomer. The CT
Chosen should be Cl:1.0, 15VA Suitable to sense the maximum current at the point of
installation. This CT output to be connected to APFC relay for sensing purpose.
Disclaimers:
The AHF should not be connected to the same bus where capacitors are connected, also
there should not be capacitor banks downstream to the AHF.
In case of capacitor banks present in same Bus or downstream, the same must be
subtracted, from the AHF, using additional three CT’s installed on the capacitor bank feeder.
The sensing CT and Subtraction CT should be of the same ratio.
The plain capacitor banks must be replaced with detuned capacitor banks. Detuned filter
should be installed before connecting AHF.
It is recommended, that all non-linear loads ( such as VFD’s and etc ) shall be equipped with
Line chokes, for better performance of Harmonics filters.
Equipment’s are to be operated in clean industrial atmosphere only (No dust: Metallic or
Non-metallic, no fumes or corrosive or flammable vapours and non-saline atmosphere)
AccuSine+ Features
Harmonic mitigation 2nd to 51st
Phase harmonic correction (PCS+), neutral harmonic correction user adjustable upto 3 times
(PCSn)
Power Factor correction – Capacitive or Inductive load.
Mains current Load balancing.
Page 3 of 11
ANNEXURE-II
Material: CRCA
Thickness of Sheet Steel Used: Frame-2.0 mm
Doors-2.0 mm
Partitions-1.6 mm
Switching Auto/Manual
7. Protection IP- 42
Application Indoor
Cable Entry TOP
Painting RAL 9003 MUL White
9. Capacitors
Type Varplus Can Gas filled @ 525V
No of Steps Refer BOM
Configuration Refer BOM
Page 4 of 11
ANNEXURE-III
Page 5 of 11
Page 6 of 11
Page 7 of 11
Note: All other Make of the components is as per Schneider Electric Bill of Material.
ANNEXURE-V
Unit Total
Sl. No Panel Description Qty Ex- Works Ex- Works
Cost (Rs.) Cost (Rs.)
75kVAr, 3Ph, 415V, 50Hz, 14% detuned
1.) thyristor switched APFC Panel with 1 11,97,700/- 11,97,700/-
VarplusCan Gas filled Capacitors.
80kVAr, 3Ph, 415V, 50Hz, 14% detuned
2.) thyristor switched APFC Panel with 1 13,09,200/- 13,09,200/-
VarplusCan Gas filled Capacitors.
85kVAr, 3Ph, 415V, 50Hz, 14% detuned
3.) thyristor switched APFC Panel with 1 13,16,500/- 13,16,500/-
VarplusCan Gas filled Capacitors.
The below disclaimer is to be used strictly in accordance with the ‘Bid Disclaimer and Force Majeure
Notification Process’.
“Schneider Electric reserves the right to amend, withdraw or otherwise alter this submission without
penalty or charge because of any event bseyond its control arising from or due to the current Covid-
Page 8 of 11
19 epidemic or events after this epidemic / pandemic including changes in laws, regulations, by laws
or direction from a competent authority. “
PRICE BASIS:
VALIDITY:
Our offer will remain open for your acceptance for 30 days from the offer date and will be subject to
our confirmation in writing thereafter.
We warrant the equipment supplied by us against any defects in design, material and workmanship
for a period of 12 months from the date of commissioning or 18 months from the date of dispatch
whichever is earlier provided the defects appear in the normal and appropriate use of the
equipment and subject having been properly stored, installed and maintained as per our instructions
contained in our manuals or supplier’s manual and also only if prompt notice is given to us
immediately on its occurrence.
Note: This warranty is applicable for sales in India only and will become null & void once the
equipment’s leave India shores
All equipment’s would be routine tested as per relevant IS standards at our / sub suppliers’ works
prior to dispatch. However, no type tests will be carried out on any components / equipment’s. TTRs
(type test reports) of major components of similar rating, if available, would be furnished during
inspection on request. If the customer desires to witness any routine / acceptance tests during
inspection, a prior notice of 7 days shall be given by us. In case, the inspection is not be witnessed on
the agreed date by customer for whatever reasons, it is then presumed that the inspection is waived
off and equipment’s are cleared for dispatch without any further claims from customer".
From the date of customer inspection clearance / intimation of waiver of inspection, the equipment
shall be dispatched within 7 days from the works, in case dispatch does not happen due to non-
receipt of necessary documents from customer side, within this time, customer is liable to pay
Page 9 of 11
demurrage charges at the rate of 18% per annum of the PO value, for number of days delayed, till
dispatched.
TERMS OF PAYMENTS:
DELIVERY:
The equipment’s will be delivered ex-our works, Bangalore. The delivery of equipment’s will be
within 12-14* weeks from the date of receipt of the approved drawings / Manufacturing Clearance.
Please note that the above delivery schedule is given in good faith and subject to following events:
(a) Drawings for customer approval would be furnished within 8 days from the date of receipt
of techno-commercial clear and firm PO.
(b) Customer approval for the documents is to be received by us within next 7 working days.
* The delivery schedule furnished as above is only indicative. We request you to kindly check with us
for the actual delivery period at the time of order finalization.
ANNEXURE-VI
Equipment’s are to be operated in clean industrial atmosphere only (No dust: Metallic or Non-
metallic, no fumes or corrosive or flammable vapours and non-saline atmosphere)
Proper ventilation around equipment is to be ensured.
Operating temperature – 40 ° C, higher operating temp may need derating/additional
ventilation, if possible. Nevertheless, it is recommended to install panels in air cooled/AC rooms,
if design ambient is more than 45 ° C.
Storage Conditions: Store the equipment in its original packing, in a dry location, sheltered from
rain and sun and at a temperature ranging between -25° C and +55 ° C before installations
LV APFC:
De tuned APFC:
Page 11 of 11