T3 q1

tp
A number of procedures are utilized for site remediation before to starting the construction work
on a theme park project in order to address any existing environmental or geotechnical issues
and guarantee a secure and legal construction process. The following methods are frequently
used:
1. Site preparation and demolition: The site is prepared by clearing it of any existing
buildings, vegetation, and trash. This might entail tearing down outdated structures,
removing trees and other plants, and properly disposing of rubbish.

2. Excavation and Earthworks: To achieve the desired levels and contours, the site is
excavated. This entails excavating foundations, constructing utility trenches, and grading
and compacting rock or soil to sculpt the terrain.

3. Remediation of Contaminated Soil: Remediation procedures are employed if the site is


contaminated with dangerous substances. This can entail excavating contaminated soil
and removing it, followed by off-site disposal or treatment. Techniques for soil
confinement or stabilization can also be used.
4. Ground Improvement: Ground improvement procedures are used to improve the site’s
soil or rock’s engineering qualities. To ensure a solid foundation for building, this could
involve techniques like compaction, stabilization, reinforcement, or densification.

5. Environmental impact analyses (EIAs): EIAs are carried out to evaluate potential
environmental consequences. A variety of factors are assessed, including
socioeconomic concerns, ecological effect, noise pollution, and air quality. It is advised
to take mitigation steps to reduce negative effects.

6. Utility Line Location and Identification: Existing utility lines are located, identified, and,
if necessary, preserved to avoid problems with the planned construction. By doing so,
important services are continuously provided, and risks are reduced.

Control of Sediment and Soil Erosion: Steps are taken to stop sediment discharge and soil
erosion. Stormwater runoff is managed and neighboring water bodies are safeguarded using
erosion control blankets, silt barriers, sediment basins, and suitable drainage systems.

1
Assessment and Removal of Hazardous Materials: If there are hazardous materials on the site,
they are located and securely removed. To guarantee worker safety and environmental
protection, certain procedures are followed when handling, containing, and disposing of
hazardous materials.

Geotechnical investigations: Geotechnical investigations are carried out to evaluate the state of
the soil and the rocks. To identify the engineering qualities of the ground, soil samples are
gathered, laboratory tests are run, and data analysis is done. Using this knowledge, adequate
foundation systems and slope stability measures can be designed.

Regulation Compliance: Local, regional, and federal requirements are all complied with during
the site cleanup process. To make sure that safety and environmental standards are being
followed, regulatory agencies obtain construction and environmental permits and conduct
routine inspections.

In conclusion, site remediation techniques are used to resolve environmental and geotechnical
concerns prior to the start of work on a theme park project. To create a secure and legal
construction environment, methods like site clearing, excavation, contaminated soil remediation,
ground improvement, environmental impact assessment, utility identification, erosion control,
hazardous material assessment, geotechnical investigations, and regulatory compliance are
used.

As the General Manager in charge of decision-making for the company’s construction project, I
will compare different structural frames for the superstructure, considering formwork,
reinforcement, fabrication of concrete, and steel. Here is a summary of the comparison:

1. Reinforced Concrete Frame:


- Primary Elements: Reinforced concrete columns, beams, and slabs.
- Secondary Elements: Shear walls, staircases, and lift cores.
- Formwork: Generally requires extensive formwork to mold the concrete into the desired
shapes.
- Reinforcement: Steel rebars are embedded within the concrete to provide tensile strength.
- Fabrication: Concrete is poured and cured on-site or precast off-site and transported to the
construction site.

2
2. Steel Frame:
- Primary Elements: Structural steel columns, beams, and trusses.
- Secondary Elements: Steel decking, stairs, and railings.
- Formwork: Minimal formwork is required as the steel members are prefabricated to precise
dimensions.
- Reinforcement: Steel members have inherent tensile strength, reducing the need for
additional reinforcement.
- Fabrication: Steel members are fabricated off-site, ensuring high precision and faster
construction.

3. Composite Frame:
- Primary Elements: Combination of steel beams and concrete slabs.
- Secondary Elements: Similar to the steel frame, including steel decking, stairs, and railings.
- Formwork: Similar to the reinforced concrete frame, as concrete is poured over the steel
beams.
- Reinforcement: Steel beams provide tensile strength, and additional reinforcement may be
added to the concrete slabs.
- Fabrication: Steel beams are fabricated off-site, while concrete slabs can be cast on-site or
precast.

In summary, the reinforced concrete frame offers a strong and durable structure, but requires
extensive formwork and on-site concrete pouring. The steel frame provides a quicker
construction process with minimal formwork, utilizing pre-fabricated steel members. The
composite frame combines the advantages of steel and concrete, with steel beams and
concrete slabs offering a balance of strength and speed of construction.

1. Based on the specific requirements and priorities of the company’s project, further
analysis and evaluation should be conducted to determine the most suitable structural
frame for the proposed building, whether it is a five-storied hospital, shopping complex,
or a theme park in CColom

3
1. Formwork: A temporary framework or mold is used to shape and hold freshly laid
concrete while it hardens and becomes sufficiently strong. Usually, prefabricated
materials, steel, aluminum, or wood are used to make it.

Formwork needs to be sturdy, rigid, and able to support the weight and pressure of fresh
concrete. It should be simple to put together, take apart, and put back together again if
necessary.
Formwork is used to build columns, beams, slabs, walls, and other structural components that
need to be a certain size and shape.
Formwork has several benefits, including the ability to create intricate architectural forms,
support during the curing process, and proper placement of reinforcement and concrete.
2. Reinforcement: To increase the concrete’s tensile strength and prevent cracking or
structural failure, reinforcement comprises of steel bars or mesh inserted into the
concrete.

- Features: High-strength steel is frequently used for reinforcement, such as in the form of
reinforcing bars or welded wire mesh. Depending on the structural requirements, it is offered in
a variety of sizes, forms, and configurations.
- Applications: Tensile forces are applied to concrete beams, columns, slabs, and other
structural components. It offers structural stability and aids in distributing loads fairly.
- Benefits: Reinforcement increases the tensile strength of concrete, reduces cracking and
deflection, and improves structural stability in general.
3. Fabricated Concrete: Precast concrete components that are made under controlled
conditions off-site and then delivered to the construction site for installation are referred to as
fabricated concrete.

Molds and casting procedures are used to create fabricated concrete pieces, which allows for
exact quality control and consistency. If necessary, they can be strengthened with steel bars or
mesh.
- Uses: Precast slabs, beams, columns, wall panels, and other structural elements are all made
of fabricated concrete.
- Benefits: Fabricated concrete may be shaped into intricate shapes and patterns, which
reduces construction time and improves quality control and durability. Additionally, it permits
ongoing on-site construction activity.

4
3. I'mSteel Steel is a flexible and often utilized material in the construction of
superstructures, either as structural members or as reinforcement within concrete
components.

Steel is extremely strong, resilient, and has good tensile strength. It comes in a variety of
shapes, such as I-beams, channels, hollow sections, and rebars.
- Uses: Steel is used for load-bearing structures such trusses, beams, columns, and structural
framing. Additionally, it can be utilized as reinforcement in concrete construction.
- Benefits: Steel has a high strength-to-weight ratio, is flexible in design, is simple to install, and
resists corrosion and fire. Long spans and wide areas are possible without the need for
intermediary supports.

Disadvantages: To ensure optimum positioning and sufficient cover to avoid corrosion, the
placement of reinforcement requires careful planning and coordination. It increases the project’s
overall cost and calls for skilled manpower.

The manufacture and construction phases of fabricated concrete must be carefully planned and
coordinated. Large precast pieces might be difficult to handle and move. Costs may rise with
specialized or complicated designs.

The poorer fire resistance of steel constructions compared to concrete may necessitate fire
prevention measures. If they are not adequately protected, they may be prone to rust. Skilled
manpower and specialized equipment are needed for steel manufacturing and installation.

Five-Story Hospital Complex with Parking Below:


- Structural Frame: For the hospital building’s superstructure, reinforced concrete and steel
frame construction are frequently combined. Steel would be used for beam components and
additional structural support, while concrete would be used for the walls, slabs, and columns.
- Formwork: To accept different concrete elements, such as slabs, columns, and walls, the
formwork system for the hospital building would need to be strong and adaptable. Formwork
panels, accessories, and other supporting systems would be used in this.
Rif For the hospital building to improve structural integrity and sustain potential loads,
considerable strengthening is required. Reinforcing bars (rebars) with various diameters, wire
mesh, and other reinforcement elements would be used in this.

5
- Fabrication: Precast elements including beams, columns, and panels would be built using
concrete fabrication processes. These precast elements help expedite construction while
enhancing quality assurance.
Steel: Beams, trusses, and other structural members requiring high strength and flexibility would
be made of steel.

Five-story Shopping Center with Parking Below:


- Structural Frame: Much to the hospital building, the superstructure of the retail center would
likely be constructed using a steel frame and reinforced concrete. Steel would be used for beam
components and additional structural support, while concrete would be used for columns, slabs,
and walls.
- Formwork: Just with the hospital building, the formwork system for the shopping complex
would need to be flexible and adaptive to varied concrete elements, accommodating slabs,
columns, and walls.
- Reinforcement: The shopping center’s reinforcement needs, which would involve the use of
rebars, wire mesh, and other reinforcement components, would be similar to those of the
hospital structure.
- Fabrication: Concrete fabrication techniques may be used for precast elements, such as
beams and columns, depending on the design and construction approach selected for the
shopping complex.
- Steel: Steel components, similar to those used in the hospital building, would be used for
beams, trusses, and other structural members needing high strength and flexibility.

Theme Park: -
Structural Frame: A theme park’s superstructure normally consists of a steel frame construction
with some lightweight components, like wood or aluminum for façades and decorative
structures. The core structural members would be made of steel, and the subsidiary elements
would be made of lightweight materials.
Formwork: As there would be fewer concrete components in the superstructure building for a
theme park than for a hospital or commercial center, the formwork needs would be less
substantial.

Reinforcement: The reinforcement needs for a theme park would primarily revolve around steel
elements and connections for the main structural frame.

6
Fabrication: The main focus of the fabrication process would be the steel components, such as
the beams, trusses, and other structural members needed for the main frame of the theme park.

Steel: Steel would be a key component of the theme park’s structural framework, offering
strength and longevity.
In conclusion, multiple structural frames containing different materials and techniques would be
needed to build a five-story hospital building with underground parking, a five-story commercial
center with underground parking, or a theme park in Colombo. The medical facility and
shopping center

Power generation: A power plant produces the electricity needed for the hospital’s structure.
The power plant may draw its energy from a variety of sources, including nuclear power, solar
or wind power, renewable sources like fossil fuels, or a mix of these. Through the use of
generators, the energy source is transformed into electrical energy throughout the generation
process.

2. Transmission: After being produced, the electricity is brought close to the hospital building
using high-voltage power lines. The transmission network, which includes these power lines,
often runs at high voltages (between thousands and hundreds of thousands of volts) to reduce
energy losses during long-distance transportation.

Substation: A substation is positioned close to the hospital building to scale down the high
voltage from the transmission cables to a lower voltage appropriate for distribution.
Transformers are used in this process.

4. Distribution Network: The hospital building and other nearby consumers are served by
the distribution network, which transports electricity from the substation to them. Lower
voltages are used by the distribution network, often between 400 and 33,000 volts.
Service Connections: Electrical panels or distribution boards are connected to the distribution
network inside the hospital facility. These panels distribute the electricity across the hospital's
numerous sections and departments, assuring a steady supply of power for various pieces of
machinery, lighting, and other electrical requirements.

7
5. Single-Phase and Three-Phase power: Both single-phase and three-phase power supply
arrangements are taken into consideration in the case of the hospital building. Lighting,
portable electronics, and other low-power equipment are frequently powered by single-
phase electricity. On the other hand, three-phase electricity is utilized for larger, more
powerful electrical loads such as motors, heavy machinery, and other huge electrical
loads. The distribution network is constructed in such a way as to meet the needs of
both single-phase and three-phase systems.
Note that the location, local laws, and the design decisions made by the project team or
electrical engineers in charge of the hospital building’s electrical system may all affect the
specific implementation and technical aspects.

3.1.1 Access to water


In order to maintain a steady supply of water, a water distribution system is necessary. The
terrain of the area largely determines the sorts of water distribution systems employed. Pumped
distribution, gravity distribution, and combination pumped and gravity systems are the three
primary ways to distribute water.

3.1.1.1 Cold water delivery and storing

There are two ways to distribute cold water: directly or indirectly. Water for direct systems In the
direct system, water is fed into an overhead tank, typically in a loft, and then distributed to
various levels by gravity. In the indirect system, water is fed into an overhead tank, typically in a
loft, and distributed to various floors

3.1.1.2 Systems for Instantaneous Hot Water


This kind of system does not store the water itself, instead using electricity or gas to heat the
water to a working temperature. To quickly heat the water, coiled electrical heating components
are utilized.

In the Hospital case study, the water is supplied to the hospital through gravity and then

Distributed throughout using a combined distribution system. The water is stored in Suction
tanks within the basement of the hospital. An electrical booster pumps the water To the storage
tanks situated on the roof of the building. The water is then distributed Throughout the building

8
Communication pipes are used to carry the water supply from the neighborhood water treatment
facility to the mains. The water from these pipes is fed into a suction pump in the cellar or
basement once they come to an end at the bulk meter. The water is subsequently pumped up to
the building's top by the electrical pump.

Where the pipe crosses the line separating the street or pavement and private land, a
communication pipe links the water mains to that location. Alternately, a service pipe is fed from
the building’s main water supply to its water distribution system.

The generation and supply phase of the fire and safety services for the hospital building
involves the implementation of various systems and procedures to ensure the safety and
security of the facility. Here is an overview of the generation and supply phase:

1. Fire Safety Systems Design: During the design phase, fire safety engineers and experts
develop a comprehensive plan for the installation and implementation of fire safety
systems. This includes determining the locations of fire alarms, fire sprinklers, smoke
detectors, and emergency exits based on the building layout and relevant safety codes
and standards.

2. Procurement of Fire Safety Equipment: Once the design phase is completed, the client
or their appointed sub-contractors proceed with the procurement of fire safety
equipment. This includes purchasing fire alarms, fire extinguishers, fire sprinkler
systems, emergency lighting systems, fire doors, and other necessary safety equipment
from reputable suppliers.

3. Installation of Fire Safety Systems: The next step is the installation of fire safety
systems. Skilled technicians and subcontractors carry out the installation process
according to the design specifications and safety standards. This involves the wiring and
connection of fire alarms, the placement of fire sprinklers, and the installation of
emergency lighting systems.

4. Testing and Commissioning: After the installation, thorough testing and commissioning
of the fire safety systems are conducted. This ensures that all components are
functioning correctly and are capable of detecting and responding to potential fire
hazards. It includes checking the functionality of fire alarms, conducting flow tests for
sprinkler systems, and verifying the effectiveness of emergency exits and evacuation
routes.

9
5. Training and Documentation: Once the fire safety systems are commissioned,
appropriate training is provided to the hospital staff on fire safety protocols, emergency
evacuation procedures, and the proper usage of fire extinguishers. Documentation of the
fire safety systems, including the layout plans, maintenance schedules, and inspection
records, is prepared and kept for future reference and compliance.

6. Ongoing Maintenance and Monitoring: Fire and safety systems require regular
maintenance and monitoring to ensure their continuous functionality. The client or their
appointed maintenance team conducts routine inspections, testing, and maintenance of
the fire safety systems, adhering to the relevant regulations and standards. This includes
checking the batteries of smoke detectors, inspecting fire extinguishers, and conducting
periodic audits to identify any potential issues or necessary upgrades.

Throughout the generation and supply phase, close coordination between the client, sub-
contractors, and relevant authorities is essential to ensure that the fire and safety services meet
the necessary requirements and regulations for the hospital building.
In the context of the lift service for the hospital building, the generation and supply phase refers
to the process of designing, installing, and ensuring the operational functionality of the lifts
within the building.
Lift
The generation phase involves the initial planning and design of the lift system. This includes
determining the number of lifts required based on factors such as building size, occupancy
levels, and traffic flow patterns. The design phase also takes into account any specific
requirements or regulations for hospital buildings, such as the need for accommodating
stretchers or medical equipment.

Once the design is finalized, the supply phase begins. This involves procuring the necessary
components and equipment for the lifts, such as the elevator cars, control panels, motors,
cables, and safety mechanisms. The supplier or contractor responsible for the lift installation
may work closely with the client to ensure the specifications and requirements are met.

During the supply phase, the installation of the lifts takes place. This includes assembling the
components, wiring the electrical connections, and integrating the control systems. The
installation process must adhere to safety standards and building codes to ensure the lifts are
safe and reliable for use in a hospital environment.

10
After the installation, rigorous testing and commissioning are conducted to ensure that the lifts
operate properly and meet the necessary performance standards. This involves running various
tests to check the functionality of the lifts, including load tests, emergency stop tests, and
verification of safety features like door sensors and interlocks.

Once the lifts pass all the tests and inspections, they are ready for operation and use. The
supply phase concludes with the handover of the lifts to the client, who assumes responsibility
for their maintenance and ongoing operation.

It’s important to note that the generation and supply phase of the lift service is just one
component of the overall MEP (Mechanical, Electrical, and Plumbing) work for the hospital
building. Other services like electrical systems, HVAC (Heating, Ventilation, and Air
Conditioning), and plumbing systems will have their own generation and supply phases, tailored
to their specific requirements.

Summary:

The provision of single phase and three phase electricity, air conditioning and ductwork, water
supply, fire and safety systems, lift installation, and IT infrastructure are all included in the
generation and supply phase of the hospital building’s major services. Needs analysis, design
and planning, procurement, installation and configuration, integration and testing, training and
documentation, and service delivery are some of the tasks included in this phase. The timely
and successful performance of these services depends on effective cooperation with
subcontractors. To satisfy the needs and standards of the hospital, the main contractor in
charge of the construction project should make sure that suitable supply arrangements and
quality control are made.

11
Building services encompass various systems installed in buildings to ensure their comfort,
functionality, efficiency, and safety. Here are some common services included in building
systems:

1. HVAC (Heating, Ventilation, and Air Conditioning): HVAC systems provide heating,
cooling, and ventilation to maintain a comfortable indoor environment. This includes
heating equipment (e.g., boilers, furnaces), cooling systems (e.g., air conditioners,
chillers), ventilation systems (e.g., ductwork, fans), and controls to regulate temperature,
humidity, and air quality.

2. Electrical Systems: Electrical services involve the installation of electrical power supply,
distribution, and lighting systems. This includes wiring, circuit breakers, electrical panels,
switches, outlets, lighting fixtures, emergency lighting, and grounding systems.

3. Plumbing and Sanitary Systems: Plumbing services include the installation of water
supply, drainage, and sanitary systems. This involves pipes, fixtures (sinks, toilets,
showers), water heaters, pumps, water storage tanks, wastewater treatment systems,
and plumbing fixtures for kitchens and bathrooms.

4. Fire Protection Systems: Fire protection services focus on preventing, detecting, and
suppressing fires. This includes fire detection systems (e.g., smoke detectors, heat
detectors), fire alarm systems, fire sprinkler systems, fire extinguishers, fire suppression
systems, and emergency evacuation systems.

5. Elevators and Escalators: Elevators and escalators provide vertical transportation within
buildings. Installation and maintenance services for these systems ensure safe and
efficient movement of people between different floors.

6. Lighting and Daylighting: Lighting services involve the design and installation of artificial
lighting systems to provide adequate illumination within the building. This includes
interior and exterior lighting fixtures, controls, and energy-efficient lighting solutions.
Daylighting focuses on maximizing natural light penetration into the building to reduce
reliance on artificial lighting.

12
7. Security Systems: Security services encompass various systems to ensure the safety
and security of building occupants and assets. This includes access control systems,
video surveillance systems, intrusion detection systems, alarm systems, and security
monitoring systems.

8. Communication and Data Systems: Communication services involve the installation of


systems for voice and data communication within the building. This includes structured
cabling systems, telephone systems, intercom systems, network infrastructure, wireless
networks, and audio-visual systems for presentations and meetings.

9. Building Management Systems (BMS): BMS services integrate and control various
building systems to optimize their performance and energy efficiency. BMS can monitor
and control HVAC systems, lighting, security, fire protection, and other services,
providing centralized management and automation.

10. Renewable Energy Systems: With the growing focus on sustainability, building services
may include the installation of renewable energy systems such as solar panels or wind
turbines to generate clean energy for the building’s power needs.

These are just some examples of the building services that contribute to creating comfortable,
functional, efficient, and safe buildings. The specific servvices required will depend on the
building type, purpose, size, and local regulations.

Residential building: Residential building entails the creation of residences such as homes,
apartments, and other living spaces. The provision of services in residential building is
concentrated on satisfying the requirements of inhabitants and homeowners. Architectural
design, construction labor, electrical and plumbing services, interior design, landscaping, and
property management are among the services frequently needed in this industry.

Construction of office buildings, retail stores, hotels, restaurants, and other non-residential
structures is referred to as commercial construction. Specialized knowledge is frequently
required for the supply of services in commercial construction, including structural engineering,
HVAC (heating, ventilation, and air conditioning) system installation, commercial electrical work,
and specialty interior finishes. Furthermore, essential roles are played by services like project
management, construction management, and facilities management in commercial building.

13
4. Industrial Construction: Industrial construction entails the development of infrastructure
for the production, processing, distribution, and storage of goods. To address the
specific requirements of industrial processes, this industry needs specialist services.
Industrial design and engineering, equipment installation, heavy machinery operations,
industrial electrical work, plumbing, and specialized safety and security systems are all
services that are frequently related to industrial building.

Fire and safety systems are crucial for assuring the safety of occupants and safeguarding the
structures from fire-related incidents in both the hospital building and the shopping center. The
location of numerous parts across the structures is necessary for the dispersion of these
systems, including:

Fire alarm systems are strategically positioned throughout the structures, including in hallways,
public spaces, and individual rooms. These alarms sound when they detect heat or smoke,
alerting occupants and starting the emergency response process.

b) Fire Extinguishers: Fire extinguishers are positioned strategically in easily accessible


positions throughout the structures, particularly in those that may have fire concerns. They are
frequently located close to exits, utility rooms, and locations with electrical equipment and are
installed on walls.
c) Fire Sprinkler Systems: These systems use sprinkler heads attached to a network of pipes to
automatically discharge water when heat is detected. Fire sprinklers are often put in every room
and hallway of a hospital building, although they are typically concentrated in the areas where
there is a larger risk of fire in shopping centers.

D) Emergency Exits and Evacuation Routes: To ensure a safe and effective evacuation in the
case of a fire, the hospital building and retail center should both have clearly designated
emergency exits and well-defined evacuation routes. Local building codes and standards should
be followed by these exits and passageways.
Water supply: To meet the needs of inhabitants and diverse activities, water supply is another
essential service that must be adequately distributed across buildings. The supply of water is
distributed by:

A) Plumbing Systems: Plumbing systems make sure that potable water is


distributed to all areas of the structures for drinking, sanitary needs, and other
uses. Plumbing systems in a hospital facility must be able to handle a higher
water demand brought on by medical operations, equipment, and patient care.

14
Plumbing systems in a shopping center are primarily concerned with supplying
water to restrooms, restaurants, and other public spaces.

b) Water Storage & Tanks: To meet the demand for water during peak consumption,
both the medical building and the shopping center may need specialized water storage tanks or
reservoirs. The plumbing system is connected to these tanks, which are often found on higher
floors or rooftops and provide a constant supply of water.

c) Water Fixtures and Outlets: According to each building’s unique needs, water fixtures
including faucets, sinks, showers, and toilets are placed throughout the space. There will be
more water fixtures in patient rooms, medical facilities, and hygienic areas of a hospital. Water
fixtures are generally scattered throughout toilets, food courts, and other public spaces in a
shopping center.

The supply chains for these services have a big impact on the building’s overall architecture. As
an illustration, fire and safety services demand specific areas for the storage of equipment, fire
control panels, and fire-rated walls and doors. Tanks, pumps, and water distribution pipelines
must be strategically placed as part of water supply networks, which must be effectively
integrated into building designs.

When designing a hospital building and shopping complex, the supply networks for these
primary services must be carefully considered from the initial planning stages. The architectural
layout should accommodate the necessary infrastructure for fire and safety services and water
supply systems, ensuring that they are easily accessible, well-distributed, and meet regulatory
requirements. Collaboration between architects, engineers, and relevant authorities is crucial to
ensuring that the design of the building supports the efficient and effective distribution of these
primary services

In conclusion, the distribution of primary services, such as fire and safety systems and water
supply networks, is crucial to a medical building’s and shopping center’s architecture. To ensure
safety, functionality, and regulatory compliance, these services must be strategically placed
throughout the structure. While taking into account the unique requirements of the residents and
the activities taking place in various regions of the building, the layout and architectural
characteristics of the building should be carefully developed to accommodate the infrastructure
required for these services.