Professional Documents
Culture Documents
ASSIGNMENT 2:
SEMESTER : 06
INSTRUCTIONS TO STUDENTS:
1. This assignment is to be done in a group of a maximum of 4 students.
2. All submissions must be in ENGLISH.
3. Delay in submission shall be treated as NON-SUBMISSION.
4. The poster size is A1 paper.
5. A verbal group presentation will be conducted on WEEK 13.
ASSIGNMENT 2 OUTCOMES:
Students should be able to integrate written reports (poster presentation) and verbal forms on the
related essential management, construction manager’s skills, attributes, roles and responsibilities
at the managerial level, site planning and method statement (human resource, material, and plant
management), motivation theory approaches, project controlling and current software in
construction project management for the relevant case study of actual project implementation
(CLO3).
DQS 360: CONSTRUCTION PROJECT MANAGEMENT
ASSIGNMENT 2:
PROJECT PROPOSAL:
Infrastructure projects are one of the significant construction categories in the development of the
Malaysian construction Industry. Malaysia is among the South-East Asian nations that have pledged
to spend billions on infrastructure developments, as the country seeks to further boost its economic
prominence. The government has allocated billions of ringgits for infrastructure developments, for
example; Kuala Lumpur-Singapore HSR express rail, Pan Borneo highway, Klang Valley MRT project,
KTMB train branch lines, telecommunication towers, electricity towers and ports. Proposed an
example of an infrastructure development project in Malaysia for your project references. As a
project management consultant or design and build contractor, your tasks are as follows:
Any font type and size could be used for this poster presentation. The orientation of the poster should
be in a portrait layout. Be creative to present a unique poster.
Poster Contents
MARKING FORMS
Group name: