You are on page 1of 2

Draft statmen

Intial

kiri kanan
Draft Depan 0.98 0.93
Draft Belakang 0.72 0.68
Trim -0.255 QM
Displacement
density lokal 1,021 corr for density
density laut 1,025
corr displacement
Total cargo loaded 8521615
rata-rata muatan DT 17285
hidrostatick awal
draft(M) Displacement (t)
draft kecil 0.830 1,475,259
QM 0.8275 1,470,614
draft besar 0.840 1,493,841

-0.00249999999999995 18,582
0.01
-0.249999999999994 -4645.5

hidrostatick akhir
Draft (M) Displacement (t)
4.960 10,025,614

JUMLAH RETASE DT = 493


Final

mean kiri kanan mean


0.955 Draft Depan 4.55 4.53 4.540
0.700 Draft Belakang 5.38 5.38 5.380
0.8275 Trim 0.840 QM 4.960
1470614 Displacement 10,025,614
-5739 density lokal 1,021 corr for density -39124
density laut 1,025
1464875 corr displacement 9986490

You might also like