You are on page 1of 1

Assam Power Distribution Company Limited

NAME OF ELECTRICAL SUB-DIVISION / IRCA :


CIN: U40109AS2003SGC007242
GSTIN: 18AABCL1354J1ZJ
ELECTRICITY BILL

Website: www.apdcl.org Centralized Customer Care Number: 1912

Consumer Name: ANANDA KALITA Consumer Number: 015000028111 Bill Amount: 85.0
Address: ,GOPAL NAGAR,NARENGI Old Consumer Number: 51000547582 Due Date: 19-Jan-2023
DTR Number: A072 Bill Number:900866695
Pole Number :068072TMP Bill Period: 01-Dec-2022 To 31-Dec-2022
Connected Load in KW: 1.0 Bill Date : 04-Jan-2023
Contact Number : 9365457529 Contracted Demand in KVA: 1.18 Number of Days: 31
Email : Load Security:1722.0 Meter Status: RUNNING
Tariff Category: LT II DOMESTIC A Meter Number: AS1300897 Billing Status: NORMAL
Supply Voltage Level: LT

015000028111
Meter Reading Details
Reading Type Meter Number MF Previous Reading Previous Export in Current Reading Current Export in Difference Difference Export
in KWh KWh in KWh KWh Reading in KWh in KWh
KWH ( Normal ) AS1300897 1.0 41.0 0.0 45.0 0.0 4.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0

Units Consumed PF Penalty/Rebate LT Metering Penalty @ 3% DTR Penalty @ 10% HT Rebate @ 3% Billable Units in KWh
4.0 0.0 4.0
0.0 0.0 0.0
Recorded Demand (in KVA) 0.0 Maximum Demand (in KVA) 0.0 Billing 1.21 Average 83.0
Demand (in Power
KVA) Factor
Power on Hours 0.0 Freeze Amount 0.0 Availability Percentage

Billing Details
Current Demand Outstanding Amount Adjustment Amount Government Subsidy Solar Rebate Net Bill Amount
Rs. 84.67 Rs. 0.00 Rs. 0.00 Rs. 3.0 0.0 Rs. 85.0
In Words: Rupees Eighty Five Only
PLEASE PAY YOUR BILL ON TIME AND HELP US TO SERVE YOU BETTER Charges Breakup
Details Units Rate Amount
Energy Charge 4.0 5.3 21.20
0.0 6.6 0.00
0.0 7.6 0.00
Total Energy Charge 21.20
Energy Charge Re- 0.00
Estimated
Demand/Fixed Charge 1.0 60.0 61.15
Energy Consumption (Last Month's Bill) FPPPA Charge 0.3 1.2
Electricity Duty 5.0 4.12
40 Govt. Subsidy 0.75 3.0
Energy Consumed

35 Meter Rent 0.0 0.0


30 Transformer M D Charge
25 Overdrawal Penalty 0.0
20 Adjustment Amount 0.0

15
Charges for dishonoured 0.0
cheque
10 Arrear Principal 0.0
5 Arrear Surcharge 0.0
0 Current Surcharge 0.0

Month1 Month2 Month3 Month4 Month5 Month6 Miscl. Arrear 0.0


Rebate if paid before due date 0.0
Months
Payable amount before due date 85.0
Payable amount after due date 85.0

Checked by E&OE: Prepared by: 40002438 Signature with seal

Page 1

You might also like