You are on page 1of 1

Assam Power Distribution Company Limited

NAME OF ELECTRICAL SUB-DIVISION / IRCA : DHUPDHARA


CIN: U40109AS2003SGC007242
GSTIN: 18AABCL1354J1ZJ
ELECTRICITY BILL

Website: www.apdcl.org Centralized Customer Care Number: 1912

Consumer Name: JOYNAL ABDIN Consumer Number: 038010063005 Bill Amount: 52.0
Address: Chakhowajar NC Old Consumer Number: SANJOG2-109523-43-038 Due Date: 25-Aug-2023
DTR Number: 2223 Bill Number:901470467
Pole Number :000 Bill Period: 02-Jul-2023 To 01-Aug-2023
Connected Load in KW: 0.49 Bill Date : 10-Aug-2023
Contact Number : 6000809223 Contracted Demand in KVA: 0.58 Number of Days: 31
Email : moniruddinkpt.01999@gmail.com Load Security:0.0 Meter Status: RUNNING
Tariff Category: LT I JEEVAN DHARA (DOMESTIC) Meter Number: SE090951 Billing Status: NORMAL
Supply Voltage Level: LT

038010063005
Meter Reading Details
Reading Type Meter Number MF Previous Reading Previous Export in Current Reading Current Export in Difference Difference Export
in KWh KWh in KWh KWh Reading in KWh in KWh
KWH ( Normal ) SE090951 1.0 136.0 0.0 138.0 0.0 2.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0 0.0

Units Consumed PF Penalty/Rebate LT Metering Penalty @ 3% DTR Penalty @ 10% HT Rebate @ 3% Billable Units in KWh
2.0 0.0 2.0
0.0 0.0 0.0
Recorded Demand (in KVA) 0.0 Maximum Demand (in KVA) 0.0 Billing 0.58 Average 85.0
Demand (in Power
KVA) Factor
Power on Hours 0.0 Freeze Amount 0.0 Availability Percentage

Billing Details
Current Demand Outstanding Amount Adjustment Amount Government Subsidy Solar Rebate Net Bill Amount
Rs. 52.01 Rs. 0.00 Rs. 0.00 Rs. 2.0 0.0 Rs. 52.0
In Words: Rupees Fifty Two Only
PLEASE PAY YOUR BILL ON TIME AND HELP US TO SERVE YOU BETTER Charges Breakup
Details Units Rate Amount
Energy Charge 2.0 5.05 10.10
0.0 0.0 0.00
0.0 0.0 0.00
Total Energy Charge 10.10
Energy Charge Re- 0.00
Estimated
Demand/Fixed Charge 0.49 80.0 40.77
Energy Consumption (Last Month's Bill) FPPPA Charge 0.3 0.6
Electricity Duty 5.0 2.54
Govt. Subsidy 1.0 2.0
50
Energy Consumed

Meter Rent 20.0 0.0


40 Transformer M D Charge
Overdrawal Penalty 0.0
30
Adjustment Amount 0.0

20
Charges for dishonoured 0.0
cheque

10
Arrear Principal 0.0
Arrear Surcharge 0.0
0 Current Surcharge 0.0

Month1 Month2 Month3 Month4 Month5 Month6 Miscl. Arrear 0.0


Rebate if paid before due date 0.0
Months
Payable amount before due date 52.0
Payable amount after due date 52.0

Checked by E&OE: Prepared by: eSuvidha Signature with seal

Page 1

You might also like