Thermal Engineering Laboratory - I

EXPT 7-.V-NOTCH

7.1 Aim: To calibrate the given notch and to estimate the coefficient of discharge.

7.2 Apparatus /Instruments required:


Experimental setup consisting centrifugal pump, regulating valve, channel fitted with V notch ,
Hooks gauge , measuring tank fitted with piezometer , main tank and stop watch etc.

7.3 Procedure :
1) Angle of V Notch is noted
2) Pump is started. The regulating valve of the delivery pipe is opened and water is made to flow
through the channel.
3) The regulating valve is closed completely so that the excess water drains out of the channel
through the notch. The channel will now be filled only up to the crest of the notch.
4) The hook gauge is lowered till the tip of it just touches the free surface of water and the reading
of hook gauge is noted this is initial reading h1
5) The regulating valve is opened slightly so that water is flowing over the crest with some head
under steady condition.
6) The hook gauge tip is adjusted so that it just touches new free surface of water
7) The tip is observed for some time and if the tip and water surface are at the same condition, the
final reading of hook gauge h2 is noted. Otherwise the process 6 is repeated till required
condition is achieved.
8) The exit valve of the measuring tank is closed and time taken for specified raise R of water in the
piezometer of the measuring tank is noted.
9) The exit valve of the measuring tank is opened after taking the above reading.
10) the above procedure is repeated at least three times for different increased heads by gradually
opening the regulating valve
11) The experiment is completed by stopping the pump.

7.4 Hints:
1) The hook gauge readings are noted accurately by using the provided vernier-scale
SDMCET, DEPARTMENT OF MECHANICAL ENGINEERING, DHARWAD Page 1
Thermal Engineering Laboratory - I

2) Heads are selected properly so that each successive head is increased at least by one cm

7.5 Available data


1. Net area of measuring tank. A=0.12 m2
2. Type of the notch = V notch
3. Angle of V-Notch =

7.6 Observation table

Hook gauge reading (cm) Rise of water level Time taken for the rise of
Trial No Initial h1 Final h2 Head in the measuring water in the measuring

h = h2-h1 tank R- m tank t- seconds

1
2
3
4

7.7 Specimen calculation


1. Theoratical discharge Qth

 
5
8
Qth = tan    2 g  H 2 − − − − − − − −m 3 / sec
15  2  ---( V-Notch)

2. Actual discharge Qact


A R
Qact = = − − − − − − − − − − m 3 / sec
t

3. Coefficient of discharge
Qact
Cd = =−−−−−
Qth

4) Average coefficient of discharge


Cd 1 + Cd 2 + Cd 3 + Cd 4
Cd = =−−−−−
4

SDMCET, DEPARTMENT OF MECHANICAL ENGINEERING, DHARWAD Page 2


Thermal Engineering Laboratory - I

7.8 Results table


Trial Head over the notch Theoretical Actual Coefficient of Average
No h in cm discharge discharge discharge Cd coefficient
Qth(m3/sec) Qact (m3/sec) of discharge
1 h H=h/100
cm (m)
2
3
4

7.9 Results:
1) The average coefficient of discharge from the calculations:
Cd =………………………….