Project: Konark Virtue

CABLE SCHEDULE FOR HT


CABLES
CABLE
NO OF TOTAL
SR. NO FROM TO SIZE IN CORE TYPE AL/CU LENGTH TERMINATION
RUNS LENGTH
SQ. MM
1 RMU TR1 95 3 AL 15 1 15 2
2 RMU TR2 95 3 AL 15 1 15 2
3 MSEDCL POINT HT SWITCH 300 3 AL 295 1 295 2
CABLE SCHEDULE FOR LT
MSEDCL POWER
CABLE
NO OF TOTAL
SR. NO FROM TO SIZE IN CORE TYPE AL/CU LENGTH TERMINATION
RUNS LENGTH
SQ. MM
1 TR 1 MAIN LT PANEL 1 240 3.5 AL 15 3 45 6
2 TR 2 MAIN LT PANEL 2 240 3.5 AL 15 3 45 6

3 MAIN LT PANEL 1 TOWER 1 METER ROOM 1 300 3.5 AL 55 1 55 2


4 MAIN LT PANEL 1 TOWER 1 METER ROOM 2 240 3.5 AL 81 1 81 2
5 MAIN LT PANEL 1 TOWER 2 METER ROOM 1 95 3.5 AL 115 2 230 4
6 MAIN LT PANEL 1 PROJECT COMMON LOAD PANEL 70 3.5 AL 100 1 100 2
7 MAIN LT PANEL 2 LOCAL FEEDER PILLER 1 70 3.5 AL 90 2 180 4
8 MAIN LT PANEL 2 LOCAL FEEDER PILLER 2 300 3.5 AL 185 2 370 4
9 MAIN LT PANEL 2 LOCAL FEEDER PILLER 3 300 3.5 AL 200 1 200 2
10 LOCAL FEEDER PILLER 1 TOWER 2 METER ROOM 2 95 3.5 AL 155 2 310 4
11 LOCAL FEEDER PILLER 2 TOWER 3 METER ROOM 1 I/C-1 120 3.5 AL 35 1 35 2
12 LOCAL FEEDER PILLER 2 TOWER 3 METER ROOM 2 I/C-1 95 3.5 AL 45 1 45 2
13 LOCAL FEEDER PILLER 3 TOWER 4 METER ROOM 1 I/C-1 95 3.5 AL 55 1 55 2
14 LOCAL FEEDER PILLER 3 TOWER 4 METER ROOM 1 I/C-2 70 3.5 AL 55 1 55 2
15 LOCAL FEEDER PILLER 3 TOWER 4 METER ROOM 2 I/C-1 70 3.5 AL 90 1 90 2
16 LOCAL FEEDER PILLER 3 TOWER 4 METER ROOM 2 I/C-2 70 3.5 AL 90 1 90 2

PROJECT COMMON LOAD


1 STP PUMP 16 4 AL 65 1 65 2
PANEL 1
PROJECT COMMON LOAD
2 LANDSCAPE DB 16 4 AL 120 1 120 2
PANEL 1
PROJECT COMMON LOAD
3 STREET LIGHT DB 16 4 AL 120 1 120 2
PANEL 1
PROJECT COMMON LOAD
4 CLUB HOUSE-1 16 4 AL 120 1 120 2
PANEL 1
PROJECT COMMON LOAD
5 CLUB HOUSE-2 16 4 AL 40 1 40 2
PANEL 1
PROJECT COMMON LOAD
6 CLUB HOUSE-3 16 4 AL 190 1 190 2
PANEL 1
PROJECT COMMON LOAD
7 UGWT PUMP 16 4 AL 65 1 65 2
PANEL 1
PROJECT COMMON LOAD
8 OWC 16 4 AL 65 1 65 2
PANEL 1
PROJECT COMMON LOAD
9 FLUSHING PUMP 16 4 AL 65 1 65 2
PANEL 1
PROJECT COMMON LOAD
10 DRINKING PUMP 16 4 AL 65 1 65 2
PANEL 1
PROJECT COMMON LOAD
11 DOMESTIC PUMP 16 4 AL 65 1 65 2
PANEL 1
PROJECT COMMON LOAD
12 BOOSTER PUMP 16 4 AL 65 1 65 2
PANEL 1
PROJECT COMMON LOAD
13 PUMP 10 4 AL 120 1 120 2
PANEL 1

CABLE SCHEDULE FOR DG


POWER

CABLE
NO OF TOTAL
SR. NO FROM TO SIZE IN CORE TYPE AL/CU LENGTH TERMINATION
RUNS LENGTH
SQ. MM
TOWER 1 METER ROOM
1 DG Synch.PANEL 50 4 AL 55 1 55 2
1 ,COMMON LOAD
TOWER 1 METER ROOM
2 DG Synch.PANEL 35 3.5 AL 90 1 90 2
2 ,COMMON LOAD
TOWER 2 METER ROOM
2 DG Synch.PANEL 50 3.5 AL 125 1 125 2
1 ,COMMON LOAD
TOWER 2 METER ROOM
2 DG Synch.PANEL 35 3.5 AL 135 1 135 2
2 ,COMMON LOAD
TOWER 3 METER ROOM
2 DG Synch.PANEL 35 3.5 AL 220 1 220 2
1 ,COMMON LOAD
TOWER 3 METER ROOM
2 DG Synch.PANEL 25 3.5 AL 220 1 220 2
2 ,COMMON LOAD
TOWER 4 METER ROOM
2 DG Synch.PANEL 16 4 AL 235 1 235 2
1 ,COMMON LOAD
TOWER 4 METER ROOM
2 DG Synch.PANEL 16 4 AL 285 1 285 2
2 ,COMMON LOAD
PROJECTION COMMON PANEL
2 DG Synch.PANEL 50 3.5 AL 125 1 125 2
LOAD
4 DG Synch.PANEL JOCKEY PUMP 16 4 AL 110 1 110 2
7 DG Synch.PANEL FIRE PUMP PANEL 70 3.5 AL 110 1 110 2
LT CABLES FOR MSEDCL SUMMARY LT CABLES FOR DG SUMMARY

TOTAL TOTAL
SIZE TERMINATION SIZE TERMINATION
LENGTH LENGTH
400 0 0 400 0 0
300 625 8 300 0 0
240 171 14 240 0 0
185 0 0 185 0 0
150 0 0 150 0 0
120 35 2 120 0 0
95 640 12 95 0 0
70 515 12 70 110 2
50 0 0 50 305 6
35 0 0 35 445 6
25 0 0 25 220 2
16 1045 24 16 630 6
10 120 2 10 0 0
6 0 0 6 0 0
4 0 0 4 0 0
2.5 0 0 2.5 0 0
2.5 0 0

CABLE SCHEDULE FOR HT CABLES

TOTAL
SIZE TERMINATION
LENGTH
95 30 4
300 295 2