SCOPE OF WORK

# Task name Deliverables


1 Initial design
HW/SW specification for Core, RNC and TRS, including
1.1. ODF/DDF planning
Traffic modeling and basic capacity dimensioning for RNC and
1.3 Core as well as IP Backbone network plus IP RAN
2 CS Core design 2xMSSs, 4xMGWs
2.1 VoIP Server HLD
2.2 Specification
2.3 Logical interface planning
2.4 CS Core nodes interconnection planning
2.5 Databuilding
3 PS Core design 2xGGSN, 3xSGSN
3.1 HLD
3.2 Specification
3.3 Logical interface planning
3.4 PS Core nodes interconnection planning
3.5 Databuilding
4 RNC design 4xRNCs
4.1 HLD
4.2 Specification
4.3 Logical interface planning
4.4 RNC/MGW/MSS/SGSN/GGSN nodes interconnection planning
4.5 Databuilding
5 IP backbone/backhaul design
51 HLD
5.2 Specification
5.3 Links capacity verification (within Core, between Core and RAN)
5.5 RAN/Core nodes interconnection planning

 5.6 IP network drawings


6 Microwave planning
6.1 HLD
6.2 Specification
6.3 Links capacity verification (within Core, between Core and RAN)
7 Radio planning
7.1 Radio parameters
7.2 XML preparation
Integration planning and implementation between PS, CS and IP
8 Integration planning networks
8.1 Drafting PATs for acceptance
8.2 Benchmarking QoS parameters
9 First Call Making of first call on the network
9.1 Verifying network quality on the services offered
SHARE OF RESPONSIBILITIES

Share of responsibilities between Pulsmade (P) and Tagtel Communication (T)

# Work description Responsible


1.1 Project Project plan development P
1.2 management Project plan approval T
1.3 Acceptance procedure for design team work’s outcome P
1.4 Design team deliverables P
1.5 Acceptance procedure approval T
2.1 Input data for List of sites and number of nodes for CS Core, PS Core, T
network design RNCs, NodeBs, IP backbone and backhaul
2.2 CS/PS traffic model and user profile’s traffic P T
2.3 Access to NetACT: CM Operation Manager, WBTS Site P T
Manager, Reporting Suite/Report Builder, Application
Launcher.
2.4 HW/SW specification for CS/PS Core, RNC, NodeBs, IP P T
backbone and backhaul, DDF/ODF
2.5 3G Site list with azimuths, coordinates, Site ID RNC ID T
WBTS ID WCEL ID Latitude, Longitude, Azim height tilt

2.6 Core and RNC rooms dimensions T


2.7 Digital maps for planning tool T
2.8 Power consumption of the RNCs and Core equipment T
2.9 Naming, numbering and general info for RAN and CS/PS P T
Core (nodes IDs, nodes names, ip supernets, LACs, RACs,
SPCs etc.)
2.10 Numbering plan, roaming info for CS/PS Core  P T
2.11 Interconnection plans with PSTN, PLMN and Internet  P T
2.12 Interconnection with OSS NetAct T
2.13 CS/PS/RNC/IP BB dimensioning P
2.14 RNCs and CS/PS Core layouts P T
3.1 Synchronization Network diagram in terms of synch-signal delivery to RAN, P  T
CS Core, PS Core, ToP
3.2 RNC/access Microwave radio (MWR) planning P
3.3 transmission Iub over IP planning P
design
3.4 IuCS, IuPS and Iur over IP planning P
3.5 ODF/DDF planning for RNC sites P
3.6 ODF/DDF planning for NodeBs sites P
3.7 Network diagram in terms of RNC P
3.8 Network diagram in terms of NodeBs and MWR P
3.9 RNCs databuilds P
3.10 NodeBs databuilds P
3.11 MWR databuilds P
3.12 Acceptance of the RNCs and NodeBs design results T
4.1 CS Core design B,C, D, F, Mc, Nb, Nc, IuCS over IP planning P
4.2 ODF/DDF planning for MSS/MGW/HLR sites P
4.3 Network diagram in terms of MSS/MGW/HLR P
4.4 MSS databuild P
4.5 MGWs databuilds P
4.6 HLR databuild P
4.7 Billing design  P
4.8 Acceptance of the MSSs and MGWs design results T
5.1 PS Core design Gi, Gn, Gr, Gs, IuPS over IP planning P
5.2 ODF/DDF planning for SGSN/GGSN sites P  T
5.3 Network diagram in terms of SGSN/GGSN P
5.4 SGSNs databuilds P
5.5 GGSNs databuilds P
5.6 Billing design  P
5.7 Acceptance of the SGSNs and GGSNs design results T
6.1 IP backbone and ODF/DDF planning for IP backbone and backhaul sites P
6.2 backhaul design Network diagram in terms of IP backbone and backhaul for P
RAN, CS/PS Core
6.3 Cisco routers and switches databuilds  P
6.4 Acceptance of the IP Backbone and Backhaul design results T
7.1 RF planning RNC XML database P

7.2 Node B xmls P

7.3 Input data for RF planning (maps, tilts, tss data, ) T

8.1 MW planning MW integration data P

8.2 Maps for planning, TSS data, LOS T

8.3 MW network architecture P


9.1 First Call Making a first call on the network P

9.2 Carrying out PAT test cases T

9.3 Verifying network quality T