Professional Documents
Culture Documents
sheet 9
a) Q (end item) = 20
The Order can be started to assemble at the fifth week, as its lead tine is
Q-5
b) Scissors 1
Beg. Inv. 1 2
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH) 0 0
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Master Schedule Plan for Scissors
Week Quantity
1
2
3
4
5
6 600
Grace Greenberg
Q-8 H= $2.5 S= $150
Regular (labor cost) $60 Stockout cost $10
b)
C)
Ordering Cost
Holding Cost
rations Management Name خالد منصور محمد متولي
ID 18010605
Bill of Material
Requirement
2B , C , 2D
2E , 3F
2E , 2G
2E , 4H
Item End B
LT (week) 1 2
Amount on
0 10
hand
Net Requiremnet
=20-0= 20
Net Requiremnet
=40-10= 30
=20-10= 10
=60-25= 35
Net Requiremnet
=(30*2)+(10*2)+(35*2)-12= 138
LT (week)
1
2
3
3
1
2
1
2
Ordering receipts
100
1 2 3 4 5
100 150
0 0 0 0 0
100 150
100 150
100 150
3 4 5 6 7
15 15 15 15 15
35
3 4 5 6
600
0 0 0 0
600
600
600
Item: D
Lot size:
Item: E
Lot size:
Item: F
Lot size:
Item: G
Lot size:
Item: H
Lot size:
LT 1
Beg. Inv. 40
Period (weeks)
Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH)
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Period (weeks)
EOQ
Gross Requirement
Scheduled receipts
Projected On Hand (POH)
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Period (weeks)
POQ
Gross Requirement
Scheduled receipts
Projected On Hand (POH)
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Item: A LT=1
8 Beg. Inv.
Lot size: Lot-for-Lot
50 Gross Requirement
Scheduled receipts
15 Projected On Hand (POH)
35 Net Requirement
35 Planned-Ordered Receipts
Planned-Ordered Releases
Item: C LT=2
Beg. Inv.
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH)
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Item: E LT=1
Beg. Inv.
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH)
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
1 2 3 4 5 6
150 180
Item: B 1
Beg. Inv. 1 2 3
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH) 0 0 0
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Item: C 1
Beg. Inv. 1 2 3
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH) 40 40 40
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Item: D 1
Beg. Inv. 1 2 3
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH) 0 0 0
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Item: E 2
Beg. Inv. 1 2 3
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH) 0 0 0
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases 600
Item: F 1
Beg. Inv. 1 2 3
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH) 200 200 200
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Item: G 2
Beg. Inv. 1 2 3
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH) 0 0 0
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases 600
Item: H 1
Beg. Inv. 1 2 3
Lot size: Lot-for-Lot
Gross Requirement
Scheduled receipts
Projected On Hand (POH) 350 350 350
Net Requirement
Planned-Ordered Receipts
Planned-Ordered Releases
Beg. Inv. 1 2 3 4 5
30 40 30
40 40 10 10 0 0
0 30 30
30 30
30 30 70
$1,100
Beg. Inv. 1 2 3 4 5
30 40 30
40 10 10 10 40 40
0 30 0
70
70 70
𝟐𝑫𝑺 𝟐 × 𝟒𝟏 × 𝟏𝟓𝟎
𝑬𝑶𝑸 = = = 𝟕𝟎. 𝟑𝟓𝒊𝒕𝒆𝒎𝒔
𝑯 𝟐. 𝟓
$1,675
Beg. Inv. 1 2 3 4 5
30 40 30
40 40 10 10 0 0
0 30 100
30 120
30 120
𝟐𝑫𝑺 𝟐 × 𝟒𝟏 × 𝟏𝟓𝟎
𝑬𝑶𝑸 = = = 𝟕𝟎. 𝟑𝟓𝒊𝒕𝒆𝒎𝒔
𝑯 𝟐. 𝟓
$1,125
1 2 3 4 5 6 7
200 300 400
100
0 100 100 300 0 0 0
200 300 400
400 400
400 400
1 2 3 4 5 6 7
300 450 600
60 60 300 450 0 0 0
240 450 600
240 450 600
240 450 600
1 2 3 4 5 6 7
400 600 800
10 10 10 10 10 10 0 0
60
60
60
1 2 3 4 5 6 7 8
140
65 65 65 65 65 65 0 0
75
75
75
1 2 3 4 5 6 7 8
150 180
10 10 10 10 0 0 0 0
140 180 0
140 180 0
140 180
7 8
0 0
4 5 6
600 0
0 0 0
600
600
600
4 5 6
600 0
40 40 0
560
560
560
4 5 6
600
0 0 0
600 0
600 0
600
4 5 6
600
0 0 0
600
600
4 5 6
600
200 200 0
400
400
400
4 5 6
600
0 0 0
600
600
4 5 6
600
350 350 0
250
250
250
6 7 8 9 10 11 12
70 20 10 80 50
0 0 0 0 0 0 0
70 20 0 10 80 0 50
70 20 10 80 50
20 10 80 50
6 7 8 9 10 11 12
Total
70 20 10 80 50 330
10 10 60 60 50 40 40 60
60 10 0 30 0 10
70 70 70 70
70 70 70
EOQ 70.3562
6 7 8 9 10 11 12
Total
70 20 10 80 50 330
90 20 0 0 80 0 0
0 0 90 0 50
90 50
90 50
EOQ 70.3562
POQ 2 Periods
Average Demand
41
Average Demand
41