PITCHED

SHEET
BLOCK ROOF

FLAT
CONCRETE
ROOF

MARBLE
PITCHED
CONCRETE
ROOF

BLOCK FLAT
CONCRETE
ROOF

COMERCIAL
FLAT
INSTITUTIONAL
PRIMARY CONCRETE
BOTH CURTAIN
2NDRY The site is dominated with institutional buildings but ROOF

there are also some commercial buildings but this


commerical buildings are affected by massing of other There are variety of facede and roof types as shown
We have well built primary roads while the 2ndry buildings and improper alighnment of program found in above but some of the wall materials used are not
roads are disconnected and some of them are narrow that site. SO;- Lack of this quilities of a building affects apropriatly utilized with the sun directiom
SO;- This negatively affect circulation and access to economical activity of the site. SO;- some buildings will recieve too much sunlight
some part of the site.
HIGH AIR AND
vehicle movement SOUND POLUTION
MODERATE AIR AND
pedesterian movement SOUND POLLUTION
GENERATION OF SOUND
vehicle and pedesterian GENERATION OF AIR
AND SOUND POLLUTION
dense area
The site has good movement dynamic on the main road Due to the slpope on the main road when cars move to
but as we move into 2ndy road’s they are quite croweded the north they produce souand and emmite greeen gas
specially infront of AN BUSSIENESS center. to the site.
SO;- Unwanted crowed and Psycological disturbancels SO;- It makes the site polluted both by sound and air
occur. and intituionally the site feels frastrating to be in.
the roof is made of
concrete

around 50% of the


qualities
building facad is
curtain wall.

windows and doors at the


back aluminium framed.
it has potetial massing
reactive to the road

vissible comparing with


surrounding buildings

the emergency stair


is made of steel.
around 30% of the facade
is plastered block wall

an business center is a building


found at the south east corner of
our site.
it is a mixed use building with offices,
banks, clinic, cafe and shops.
secondary roads

primary road unplanned opening


it is accessible the south and east side of the
building are more open.
since the main entrance is north elevation this makes the building get sun light west elevation
at the corner any one from through out the day
the roof is accessible
both secondary roads can and it is too dificult to work in the
elevator access it easily offices at the south in the afternoon
without function
B B there are doors at the north with no
the vertical circulations stair

are at the center which there is no visual connection with


stair makes them accessible for the outside environmenet
A A
each room in the building not accessible
section aa section bb
accessible
main entrance

plan at o.oo
south elevation east elevation