LAPORAN HARIAN HSSE KONTRAKTOR
LOCATION : Lumut Balai 2 Project
COMPANY : MI-SEPCOIII-Wika Consortium
DATE : 20 June 2023
ACTIVITIY : EPC
REPORT NUMBER : 199

1 . PERSONNEL ON BOARD 3. LAGGING INDICATOR


Total Personnel Total Man Hours JENIS INSIDEN Today YTD Cumm
No. Name Jabatan
Today YTD Cumm Today YTD Cumm Fatality 0 0 0
1 SEPCOIII 67 6149 6216 536 40134 40670 Day Away From Work Case 0 0 0
2 SEPCOIII-CHCI SOIL INVESTIGATION 0 1167 1167 0 8668 8668 Restricted Work Case 0 0 0
3 WIKA EPC-CIVIL/site office built 84 10281 10365 728 99468 100196 Medical Treatment Case 0 0 0
4 LEMBURAN REKANAN WIKA SUBCONT PEKERJA SITE OFFICE 14 1 14 4 56 4556 First Aid (P3K) 0 0 0
5 Nearmiss 0 0 0
6 Property Damage ≥ USD 1 Jt 0 0 0
7 Property Damage < USD 1 Jt 0 0 0
8 ‘ Tumpahan Minyak ≥ 15 Bbls 0 0 0
9 Tumpahan minyak < 15 Bbls 0 0 0
10 TOTAL 0 0 0
AKUMULATIF 165 17762 154090
Mandays Manhours 4. LEADING INDICATOR
No Personil On Board Jumlah JENIS INDICATOR Today YTD Cumm
1 Pekerja 147 1. HOC
2 Administrasi 9 - Nearmiss 0 0 0
3 Pengawas 9 - Unsafe Condition 0 0 0
4 HSE 7 - Unsafe Action 0 0 0
2. LAPORAN VISIT CLINIC - Safe Action/condition 0 0 0
JENIS KELUHAN Today YTD Cumm
Flu/Influensa 0 0 0 2. HSE Meeting
Sakit Perut/Diare/Maag 0 0 0 - Tailgate Meeting/Tool Box 2 453 455
Kulit/Gatal-gatal 0 0 0 - Prejob Safety Meeting 0 4 4
Mulut/Gigi/Tenggorokan/Sariawan 0 0 0 - Coordination Meeting 0 1 1
Mata 0 0 0 - Safety Stand down Meeting 0 5 5
Hipertensi / Hipotensi 0 0 0 - Others Meeting (Weekly)
Sendi/Pegal 0 0 0 5. Risk Assesment
Sakit Kepala 0 0 0 6. Management Walkthrough
Batuk 0 0 0 - Finding MWT
Demam 0 0 0 - Close Out MWT
ISPA 0 0 0 7. Inspection 12 918 930
Lain-lain 0 0 0 8. Induction 0 216 216
0 0 0 9. Training 0 218 218
TOTAL 0 0 0 10. Audit 0 1 1
11. Emergency Preparedness Simulation 0 1 1
5. Permit To Work 12. Reward 0 4 4
No PTW Number Tanggal Approval Activities Status Jenis PTW 13. Punishment 0 1 1
1 KSO/LB2/WK/HSE/KD/002/I/2023 9‐Jun‐23 Pekerjaan Site Office Open Umum Total 14 1828 1842
2 KSO/LB2/WIKA/HSE/KP/001/I/2023 9‐Jun‐23 Pekerjaan Site Office Open Hot Work
3 KSO/LB2/WIKA/HSE/WAH/001/I/2024 10‐Jun‐23 Pekerjaan Site Office Open WAH
4 KSO/LB2/WIKA/HSE/PG/001/05/2023 8‐Jun‐23 Cuting soil Open Excavation
5 KSO/LB2/WIKA/HSE/KD/001/05/2023 8‐Jun‐23 Loading unloading Matrial Open Umum
h d i FCRS A /
KSO/LB2/WIKA/HSE/KD/002/05/2023 CBR Test Umum
6 8‐Jun‐23 Open
7 KSO/LB2/WIKA/HSE/KD/003/05/2023 8‐Jun‐23 Surve Elevation Tanah Open Umum
8 KSO/LB2/WIKA/HSE/KD/004/05/2023 8‐Jun‐23 Surve Elevation Tanah Open Umum
9 KSO/LB2/WIKA/HSE/KD/005/05/2023 8‐Jun‐23 Ground Fill Open Umum
10 Wika - KSO - LMB2 - KD005 - 001 12‐Jun‐23 Clearing and Grabing Open Umum
11 Wika - KSO - LMB2 - PG002 - 001 12‐Jun‐23 Cuting and Filling Open Excavation
12 Wika - KSO - LMB2 - KD006 - 001 12‐Jun‐23 CBR Test Open Umum
13 Wika - KSO - LMB2 - KD007 - 001 12‐Jun‐23 Loading unloading tanah Open Umum
14 Sepco3/HSE/CW/2023/05/0083 16‐Jun‐23 Fabrication Steel Rebar Open Umum
15 Sepco3/HSE/CW/2023/05/0081 13‐Jun‐23 Transformer Work Open Umum
16 Sepco3/HSE/HW/2023/05/0082 15‐Jun‐23 restance Open Umum

6. Operation Activities & HSSE ACTIVITIES


1 Pekerjaan Site Office 2. Tool Box Meeting

7. HSSE Activities Remark / Progress


3 Daily Check Up

5 HSSE Inspection 6. HSSE PATROL

6 Pemeriksaan Alat Berat

pP

8. HSSE Issues Follow Up / Corrective Action

9. Program Plan Target Time


1 Tool Box Meeting
2 Daily Check Up
3 Pemeriksaan Alat Berat
4 Monitor Kegiatan
5 Housekeeping Setelah Pekerjaan

Approved Acknowledged by, Prepared by,

Mr. Chen Sigih Sigit H B Andi Cipto


HSSE Manager SepcoIII HSSE Manager Wika HSE Supervisor Sepcolll