You are on page 1of 1

:

LAPORAN HARIAN HSSE KONTRAKTOR


LOCATION : Lumut Balai 2 Project
COMPANY : MI-SEPCOIII-Wika Consortium
DATE : 28 May 2023
ACTIVITIY : EPC
REPORT NUMBER : 176

1 . PERSONNEL ON BOARD 3. LAGGING INDICATOR


Total Personnel Total Man Hours JENIS INSIDEN Today YTD Cumm
No. Name Jabatan
Today YTD Cumm Today YTD Cumm Fatality 0 0 0
1 SEPCOIII 52 4533 4585 416 27126 27542 Day Away From Work Case 0 0 0
2 SEPCOIII--CHCI SOIL INVESTIGATION 0 1167 1167 0 8668 8668 Restricted Work Case 0 0 0
3 WIKA EPC-CIVIL/site office built 30 8634 8664 240 83312 83552 Medical Treatment Case 0 0 0
4 LEMBURAN REKANAN WIKA SUBCONT PEKERJA SITE OFFICE 0 1 0 4 0 3464 First Aid (P3K) 0 0 0
5 Nearmiss 0 0 0
6 Property Damage ≥ USD 1 Jt 0 0 0
7 Property Damage < USD 1 Jt 0 0 0
8 Tumpahan Minyak ≥ 15 Bbls 0 0 0
9 Tumpahan minyak < 15 Bbls 0 0 0
10 TOTAL 0 0 0
AKUMULATIF 82 14416 123226
Mandays Manhours 4. LEADING INDICATOR
No Personil On Board Jumlah JENIS INDICATOR Today YTD Cumm
1 Pekerja 56 1. HOC
2 Administrasi 8 - Nearmiss 0 0 0
3 Pengawas 9 - Unsafe Condition 0 0 0
4 HSE 9 - Unsafe Action 0 0 0
2. LAPORAN VISIT CLINIC - Safe Action/condition 0 0 0
JENIS KELUHAN Today YTD Cumm
Flu/Influensa 0 0 0 2. HSE Meeting
Sakit Perut/Diare/Maag 0 0 0 - Tailgate Meeting/Tool Box 1 384 385
Kulit/Gatal-gatal 0 0 0 - Prejob Safety Meeting 0 3 3
Mulut/Gigi/Tenggorokan/Sariawan 0 0 0 - Coordination Meeting
Mata 0 0 0 - Safety Stand down Meeting
Hipertensi / Hipotensi 0 0 0 - Others Meeting (Weekly)
Sendi/Pegal 0 0 0 5. Risk Assesment
Sakit Kepala 0 0 0 6. Management Walkthrough
Batuk 0 0 0 - Finding MWT
Demam 0 0 0 - Close Out MWT
ISPA 0 0 0 7. Inspection 0 844 844
Lain-lain 0 0 0 8. Induction 0 210 210
0 0 0 9. Training 0 192 192
TOTAL 0 0 0 10. Audit 0 1 1
11. Emergency Preparedness Simulation
5. Permit To Work 12. Reward 0 2 2
No PTW Number Tanggal Approval Activities Status Jenis PTW 13. Punishment 0 1 1
1 Sepco3/HSE/CW/2023/03/0051 01-May-23 Install Jalur Air Bersih Open Umum Total 1 1637 1638
2 Sepco3/HSE/CW/2023/03/0052 02-May-23 Transformer Work Open Umum
3 Sepco3/HSE/CW/2023/05/0031 01-May-23 Stack Out Land Open Umum
4 Sepco3/HSE/HW/2023/05/0032 02-May-23 Install Fancing Open Umum
5 KSO/LB2/WIKA/HSE/PG/11/04/2023 05-May-23 Cut And Fill Open Exxavation
Loading/Unloading
6 KSO/LB2/WIKA/HSE/KD/012/03/2023 05-May-23 Matrial Tanah GPP to Open Umum
Disposal
7 KSO/LB2/WIKA/HSE/KD/012/04/2023 05-May-23 CBR Test Open Umum
8 KSO/LB2/WIKA/HSE/KD/013/03/2023 05-May-23 Survey Elv Tanah Open Umum
9 KSO/LB2/WIKA/HSE/KD/014/03/2023 05-May-23 Survey Elv Tanah Open Umum
10

6. Operation Activities & HSSE ACTIVITIES


1 Pekerjaan Site Office 2. Tool Box Meeting

7. HSSE Activities Remark / Progress


3 Daily Check Up 4. HSSE Induction

5 HSSE MEETING 6. HSSE PATROL

6 Pemeriksaan Alat Berat

8. HSSE Issues Follow Up / Corrective Action

9. Program Plan Target Time


1 Tool Box Meeting
2 Daily Check Up
3 Pemeriksaan Alat Berat
4 Monitor Kegiatan
5 Housekeeping Setelah Pekerjaan

Approved Acknowledged by, Prepared by,

Mr. Chen Sigih Sigit H B Andi Cipto


HSSE Manager SepcoIII HSSE Manager Wika HSE Supervisor Sepcolll