You are on page 1of 4

Cas Ca C20 C

Cs Cn

Cvs
Ce Cha Ci3 Cio

-C

Ca Ca

s000 4000 300D 3000 2700 5000


45D0

6115 4 43

FOOTIN G PLAN sc 1:100

2
D 5 200, 259 00,200 200 2o 50 5
P.C.C BED

COVERIN6 TD AVOO CAFTLARY ACTIODN


40MM tONCRETE COVER BLOCK

16MMd cOLUMN STEEL REINEORCEMENT BAR


SMM STTRRUP

MM 150 cIc STECL MESH


12 MM cIC 200 STECL MESH
12 MM 6 REINFORCEMENT BARS

PLACEMENT OF RETNFORCEMENT

1/6 LAP IN RETNFORLEMENT BAKS


PUNTH LEVEL +D30
125 MM P. C.C BEDP
sDO s00 50 CROUND LEVEL-0.0
PLINTH BEAM 250 x300

SMM 150 /c STIRRUPS


4OMM COVER

75MM SPACE FOR SHUTTERING


75 MM SPACE FOR SHUTTERTNG

16MM CoLOMN STBE5L REINFORCEN BAR

TRAPEZOIDAL RCC FoOTING


AO MM CDNCRETE CDVER BLOK

P.C.C BED
L 12 MM @ 200c/c STEEL MESH

150 MM THMK P.C.C BED

1950 DRY RU88LE PACKING

PLAN 0F FOOTING sc 42 cOMPACT EACTH

GECTTON AA S1:20
150150,200,200 200 200 200, 200, 150150
P.C.C BED

CDVERING TD Av6rO CAPILARK ACTION


40MM CoNCRETE COVER BLOCKK

I6 MM cOWMN STEEL REINFORCE MENT BAR


8 MM STIRRUP

9MM 150 cIC STELMESH

12MM cIc L00 STEEL MESH

PLACEMENT OF RETNFORCEMENT

50 500 500 500 150

40MM COVER

75 MM SPACE FOR SHUITERING

TRAPEZOTDAL RCC FOOTING

P.C.C BED

1g50

PLAN OF FOOTTNG sc 1:20


12
MM b REINFORCEMENT BARS

1/G LAP IN RETNFORLEMENT BARS


PLINTH LEVEL +D30
125 MM P.C.C BED

GROUND LEVEL +-0.0


PLTNTH BEAM 250 x30O

MM 150 CIC STIRRUPs

75 MM SPACE FOR SHUTTERING

16MM ( COLUMN STEEL REINFORCEMENT BAR

40 MM CDNCR.ETE CoVER BLOoCK


12MM 200c/C STEEL MESH
150 MM THK P.C.C BED

DRY RUBSLE PACING

COMPACT EARTH

oECTTON AA sc 1:20

You might also like