(WHEN PREPARATION & SCRUTINY OF ESTIMATES,
SEE AUTHENTICATED SSR 2020-21)
With effect vide proceedings No: ENC/ IW/ P&M/ EE.1/ DEE-
3/ AEE (N)/ SoR 2020-21/ Volume 1 Dated: 16-09-2020 of the
Engineer-in-Chief (A.W/ I.W) Water Resources Department &
Chairman, BOCE (SoR), Currency Nagar, Vijayawada.
CONVEYANCE CHARGES FOR MACHINERY BY TIPPERS AND TRUCKS FOR THE YEAR
2020-21
UN AUTHENTICATED
CONVEYANCE CHARGES FOR MACHINERY BY TIPPERS AND TRUCKS FOR THE YEAR
2020-21
121 1305.20 1262.60 2103.70 161 1709.20 1654.60 2755.70 201 2113.20 2046.60 3407.70
122 1315.30 1272.40 2120.00 162 1719.30 1664.40 2772.00 202 2123.30 2056.40 3424.00
123 1325.40 1282.20 2136.30 163 1729.40 1674.20 2788.30 203 2133.40 2066.20 3440.30
124 1335.50 1292.00 2152.60 164 1739.50 1684.00 2804.60 204 2143.50 2076.00 3456.60
125 1345.60 1301.80 2168.90 165 1749.60 1693.80 2820.90 205 2153.60 2085.80 3472.90
126 1355.70 1311.60 2185.20 166 1759.70 1703.60 2837.20 206 2163.70 2095.60 3489.20
127 1365.80 1321.40 2201.50 167 1769.80 1713.40 2853.50 207 2173.80 2105.40 3505.50
128 1375.90 1331.20 2217.80 168 1779.90 1723.20 2869.80 208 2183.90 2115.20 3521.80
129 1386.00 1341.00 2234.10 169 1790.00 1733.00 2886.10 209 2194.00 2125.00 3538.10
130 1396.10 1350.80 2250.40 170 1800.10 1742.80 2902.40 210 2204.10 2134.80 3554.40
131 1406.20 1360.60 2266.70 171 1810.20 1752.60 2918.70 211 2214.20 2144.60 3570.70
132 1416.30 1370.40 2283.00 172 1820.30 1762.40 2935.00 212 2224.30 2154.40 3587.00
133 1426.40 1380.20 2299.30 173 1830.40 1772.20 2951.30 213 2234.40 2164.20 3603.30
134 1436.50 1390.00 2315.60 174 1840.50 1782.00 2967.60 214 2244.50 2174.00 3619.60
135 1446.60 1399.80 2331.90 175 1850.60 1791.80 2983.90 215 2254.60 2183.80 3635.90
136 1456.70 1409.60 2348.20 176 1860.70 1801.60 3000.20 216 2264.70 2193.60 3652.20
137 1466.80 1419.40 2364.50 177 1870.80 1811.40 3016.50 217 2274.80 2203.40 3668.50
138 1476.90 1429.20 2380.80 178 1880.90 1821.20 3032.80 218 2284.90 2213.20 3684.80
139 1487.00 1439.00 2397.10 179 1891.00 1831.00 3049.10 219 2295.00 2223.00 3701.10
140 1497.10 1448.80 2413.40 180 1901.10 1840.80 3065.40 220 2305.10 2232.80 3717.40
141 1507.20 1458.60 2429.70 181 1911.20 1850.60 3081.70 221 2315.20 2242.60 3733.70
142 1517.30 1468.40 2446.00 182 1921.30 1860.40 3098.00 222 2325.30 2252.40 3750.00
143 1527.40 1478.20 2462.30 183 1931.40 1870.20 3114.30 223 2335.40 2262.20 3766.30
144 1537.50 1488.00 2478.60 184 1941.50 1880.00 3130.60 224 2345.50 2272.00 3782.60
145 1547.60 1497.80 2494.90 185 1951.60 1889.80 3146.90 225 2355.60 2281.80 3798.90
146 1557.70 1507.60 2511.20 186 1961.70 1899.60 3163.20 226 2365.70 2291.60 3815.20
147 1567.80 1517.40 2527.50 187 1971.80 1909.40 3179.50 227 2375.80 2301.40 3831.50
148 1577.90 1527.20 2543.80 188 1981.90 1919.20 3195.80 228 2385.90 2311.20 3847.80
149 1588.00 1537.00 2560.10 189 1992.00 1929.00 3212.10 229 2396.00 2321.00 3864.10
150 1598.10 1546.80 2576.40 190 2002.10 1938.80 3228.40 230 2406.10 2330.80 3880.40
151 1608.20 1556.60 2592.70 191 2012.20 1948.60 3244.70 231 2416.20 2340.60 3896.70
152 1618.30 1566.40 2609.00 192 2022.30 1958.40 3261.00 232 2426.30 2350.40 3913.00
153 1628.40 1576.20 2625.30 193 2032.40 1968.20 3277.30 233 2436.40 2360.20 3929.30
154 1638.50 1586.00 2641.60 194 2042.50 1978.00 3293.60 234 2446.50 2370.00 3945.60
155 1648.60 1595.80 2657.90 195 2052.60 1987.80 3309.90 235 2456.60 2379.80 3961.90
156 1658.70 1605.60 2674.20 196 2062.70 1997.60 3326.20 236 2466.70 2389.60 3978.20
157 1668.80 1615.40 2690.50 197 2072.80 2007.40 3342.50 237 2476.80 2399.40 3994.50
158 1678.90 1625.20 2706.80 198 2082.90 2017.20 3358.80 238 2486.90 2409.20 4010.80
159 1689.00 1635.00 2723.10 199 2093.00 2027.00 3375.10 239 2497.00 2419.00 4027.10
160 1699.10 1644.80 2739.40 200 2103.10 2036.80 3391.40 240 2507.10 2428.80 4043.40
UN AUTHENTICATED
LEAD STATEMENT (YEAR 2020-21)
NAME OF THE WORK:-
2 BMT-A.02 Common burnt clay bricks of class as per Table-1 of IS:1077-1992 Modular 1000 Nos
or traditional size 19 x 9 x 9 cm (570 Nos / 1 Cum)
6750.00
10 BMT-A.10 Fly ash cement/ lime solid blocks with compressive strength of 50
kg/sq.cm - IS:12894-1990 - CLASS - 5 - 290 x 225 x 140 mm
Each 24.00
23 BMT-B.01 Kadapa slab 40 mm thick and size not less than 0.457 M x 0.457 M 1 Sqm 96.00
24 BMT-B.02 Kadapa slab 50 mm thick and size not less than 0.457 M x 0.457 M 1 Sqm 110.00
29 BMT-B.07 Polished Bethamcherla pure (marble type) white stone minimum 10 Sqm 3834.00
25 mm thick (0.254Mx0.254M)
1 22.a R.R Masonry Work (other than Granite, Dolomite and Trap) 1 cum 171.45
15 23.b CR Stone for other varieties 1 cum 197.15
18 28.a Bond stones ( 600 x 200 x 200 mm size - 1 No - 47.60 ) 1 Cum 1983.33
12 12 g R.R.Masonry works ( granite, dolamite and trap variety) 1 cum 255.00
14 23.a CR Stone Granite, Dolamite and trap 1 cum 274.30
2 b.i SS Revetment work 225 mm (Other than granite) 1 cum 150.00
8 d iii Granite for SS revetment 225 mm 1 cum 168.55
NOTE:- For items 22(a) to 22© and 22(g) add extra Rs /cum,
13
wherever quarrying is done by blasting
1 cum 70.00
NOTE: - For items 23(a), 23(b) and 27 add extra Rs. Per Cum,
17 wherever quarrying is done by blasting 1 cum 82.00
M-021 MAT-00189 Stone crusher dust finer than 3 mm with not more than 1 cum 357.00
10% passing 0.075 sieve.
92 B HBG Stone Chips 2.36mm and below 1 Cum 381.00
173 MAT-00003 Binding wire 1 Kg 56.00
174 MAT-00536 Jute rope 1 Mt 8.35
149 B1 Screening sand and gravel 1 cum 10.50
150 B2 Screening chips and metal 1 cum 17.60
170 n Labour charges for laying filters with coarse aggregate. 1 cum 55.30
171 o Labour charges for laying filter with sand. 1 cum 30.70
23 MAT-00023 Empty cement bag 1 No 5.00
(a) Fine aggregate / sand (un- screened) for Concrete & Filtering
27 93 (36 a)
items)
1 cum 510.00
94 (36 b) (b) Fine aggregate / Sand (unscreened) for filling 1 cum 375.00
Fine aggregate / Sand (Screened) for Mortar, Plastering items
28 95 (36 c) and Sand blasting items (Including screening Charges) 1 cum 605.00
37/ MAT- Clay for puddle and masonry items 38(a) to 39 (h) as per local
96
00475 prevailing rates based on competitive quotations
1 cum 38.00
M-092 MAT-00252 Earth cost or compensation for selected earth for shoulders taken 1 cum 101.00
from private land
4 MAT-00691 Diesel 1 Lt 79.73
10 MAT-00697 Petrol 1 Lt 79.47
M-189(a) Water charges(Urban) Kilo Litre 110.00
(b) MAT-00333 Water charges(Rural) Kilo Litre 83.00
16 Concrete mixer 300 / 200 ( diesel) (Hire, Fuel and Crew charges) 1 Hour 424.90
52 Shovel 0.85 cum 110 hp / Hydraulic excavator -do- 1 Hour 2945.40
26 Dewatering pump 5 HP (Diesel) -do- 1 Hour 252.90
40 Needle vibrator 40mm (Petrol) -do- 1 Hour 223.00
64 Water tanker 8000 litres -do- 1 Hour 987.90
165 MAT-05455 Gelatin (For MORTH Data, State and N H Works only) 1 Kg 60.00
166 MAT-00021 Electric Detonators (For MORTH Data, State and N H Works) 1 No 9.00
HARD BROKEN STONE OF GRANITE, TRAP AND DOLERITE FREE FROM DUST OBTAINED BY
QUARRYING, WEDGING, BREAKING, BURNING AND SPLITTING
25 33.a - do - 6mm size (SS 5) 1 cum 568.00
26 b - do - 10mm size (SS 5) 1 cum 716.00
27 c - do - 12mm size (SS 5) 1 cum 848.00
28 d - do - 20mm size (SS 5) 1 cum 1064.00
30 f - do - 40mm size (SS 5) 1 cum 640.00
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
33 i - do - 65mm size (SS 5) 1 cum 360.95
NOTE:- (1) Add extra Rs. /- per cum for items 33 (a) to 33 (k) if the
36
metal is obtained by blasting
1 cum 70.00
Removal of natchu, goobi, thooti etc., for every extra lead or lift
136 d over the initial lead or lift. 1 Sqm 1.50
Laying Sand Bags in the stipulated places including cost of empty 28.00
cement bag, sand, thread, stiching charges and labour charges (Without
with 13.615 % overhead charges and ontractors profits (sand rate over head
for filling is considered) Note:- During the emergency conditions
2 MAT-00340
such as floods and other natural calamities, the above rate is
1 Bag and
allowed to enhance by 25% for 1st warning level and above, Contractor
keeping in view of the difficulty in availability of labour and profit =
vehicles. 24.65)
ROAD ROLLER
Picking old metalled surface to a depth of 40 to 100 mm and spreading metal including watering with an
initial lead of 2 Hectometers and rolling with power rollers watering and spreading gravel for blindage
5.0 and power roller rolling including hire charges of power roller( 8 to 10 T ) barricading and diversion of
traffic and wetting the new consolidation for a fortnight (for compacted thickness of ) HARD METAL
144 BMT-F.18 Galvanized Iron fly proof wire mesh not less than 20 gauge 1 Sqm 220.00
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
154 BMT-F.19 Stainless steel fly proof wire mesh of not less than 20 gauge 1 Sqm 446.00
138 BMT-F.28 Rabbit wire mesh (chicken mesh) of not less than 30 gauge 1 Sqm 17.00
957 BMS-W.20 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1" (25.4 mm ) thick 1 Sqm 839.00
958 BMS-W.21 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1/2" (12.7 mm ) thick 1 Sqm 481.00
GI PIPES
32 MAT-00033 G I Pipe 100 mm dia B Class 1 Rmt 710.00
33 MAT-00034 G I Pipe 15 mm dia A class 1 Rmt 85.00
34 MAT-00035 G I pipe 25 mm dia A class 1 Rmt 145.00
35 MAT-00036 G I pipe 40 mm dia B class 1 Rmt 222.00
36 MAT-00037 G I pipe 50 mm dia A class 1 Rmt 255.00
37 MAT-00038 G I Pipe 80 mm dia B Class 1 Rmt 466.00
11 32mm dia GI "B" Class pipes for Bore Well Hand Pumps only 1 Rmt 400.00
S& F 15 mm Nominal Bore GI pipe Light Grade properties &
278 400 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 162.00
of pipe & its fittings & labour charges complete
279 BMW-F.68 15mm dia GI Pipe labour charges only 1 Rmt 41.00
S& F 20 mm Nominal Bore GI pipe Light Grade properties &
280 BMW-F.69 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 185.00
pipe & its fittings & labour charges complete
281 BMW-F.70 20mm dia GI Pipe labour charges only 1 Rmt 41.00
S& F 25 mm Nominal Bore GI pipe Light Grade properties &
282 BMW-F.71 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 241.00
pipe & its fittings & labour charges complete
283 BMW-F.72 25mm dia GI Pipe labour charges only 1 Rmt 41.00
S& F 32 mm Nominal Bore GI pipe Light Grade properties &
284 BMW-F.73 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 335.00
pipe & its fittings & labour charges complete
285 BMW-F.74 32mm dia GI Pipe labour charges only 1 Rmt 41.00
S& F 40 mm Nominal Bore GI pipe Light Grade properties &
286 BMW-F.75 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 376.00
of pipe & its fittings & labour charges complete
287 BMW-F.76 40mm dia GI Pipe labour charges only 1 Rmt 44.00
S& F 50 mm Nominal Bore GI pipe Light Grade properties &
288 BMW-F.77 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 412.00
of pipe & its fittings & labour charges complete
289 BMW-F.78 50mm dia GI Pipe labour charges only 1 Rmt 67.00
S& F 15 mm Nominal Bore GI pipe Medium Grade properties &
290 BMW-F.79 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 179.00
of pipe & its fittings & labour charges complete
291 BMW-F.80 15mm dia GI Pipe labour charges only 1 Rmt 41.00
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
S& F 20 mm Nominal Bore GI pipe Medium Grade properties &
292 BMW-F.81 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 198.00
pipe & its fittings & labour charges complete
293 BMW-F.82 20mm dia GI Pipe labour charges only 1 Rmt 41.00
S& F 25 mm Nominal Bore GI pipe Medium Grade properties &
294 BMW-F.83 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 258.00
pipe & its fittings & labour charges complete.,
295 BMW-F.84 25mm dia GI Pipe labour charges only 1 Rmt 41.00
S& F 32 mm Nominal Bore GI pipe Medium Grade properties &
296 BMW-F.85 weight as per IS 1239ISI mark with GI fittings including the cost of 1 Rmt 359.00
pipe & its fittings & labour charges complete
297 BMW-F.86 32mm dia GI Pipe labour charges only 1 Rmt 41.00
S& F 40 mm Nominal Bore GI pipe Medium Grade properties &
298 BMW-F.87 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 401.00
of pipe & its fittings & labour charges complete
299 BMW-F.88 40mm dia GI Pipe labour charges only 1 Rmt 44.00
S& F 50 mm Nominal Bore GI pipe Medium Grade properties &
300 BMW-F.89 weight as per IS 1239 ISI mark with GI fittings including the cost 1 Rmt 436.00
of pipe & its fittings & labour charges complete
301 BMW-F.90 50mm dia GI Pipe labour charges only 1 Rmt 67.00
671 BMW-I.77 Removing 12.7 mm GIpipe and refixing the same 1 RMt 58.00
672 BMW-I.78 Removing 19.05 mm GIpipe and refixing the same 1 RMt 63.00
673 BMW-I.79 Removing 25.4 mm GIpipe and refixing the same 1 RMt 95.00
674 BMW-I.80 Removing 38.1 mm GIpipe and refixing the same 1 RMt 120.00
675 BMW-I.81 Removing 50.8 mm GIpipe and refixing the same 1 RMt 141.00
LABOUR CHARGES, MUNICIPAL LIMITS AND PIPE LINE TRENCHES (R&B)
LABOUR RATES First class Mason (Mason, Brick layer) 1 day 550.00
LABOUR RATES Bar bender 1 day 665.00
LABOUR RATES First class Fitter 1 day 585.00
LABOUR RATES First class Carpenter 1 day 615.00
LABOUR RATES First class Painter/ Plumber/ Pipe fitter 1 day 615.00
LABOUR RATES Electrician (Licensed) 1 day 610.00
LABOUR RATES Second class (Mason, Brick layer, Carpenter, Fitter, Painter) 1 day 500.00
LABOUR RATES Un skilled Man Mazdoor/ Woman Mazdoor/ Watchman 1 day 460.00
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
Un skilled work man (R&B) (Helper/ Cleaner/ Sweepers/ Scavangers/
LABOUR RATES Choukidars/ Security Guards/ Office boys) 1 day 445.00
4.0 (Roads) Skilled labour (30% First class & 70% Second class may be taken)
20% over basic rates on labour component works allowed for works situated within 10Kms belt of
Industrial area of, Ibrahimpatnam, Vuyyuru, Jaggaiahpeta in Krishna District, Macherla, Gurajala,
Challapalli in Guntur District, Garividi in Vijayanagaram District, Renigunta in Chittoor District and
INDUSTRIAL AREA Yerraguntla & Mangampet in Kadapa District, Hindupur, Tadipatri, Anantapur, Guntakal,
Rayalcheruvu, Yadiki of Anantapur District and Adoni, Dhone,Cement Nagar, Nandyal, Kurnool,
Yemmiganur & Bethamcherla of Kurnool District, Anakapally of Vishakhapatnam District.
(a) 25% extra is allowed for the works located within the interior Agency / Tribal limits, i.e. for the
works located within & upto16 KMs from any all weather route inside Agency / Tribal (b) 40% extra
is allowed for the works located within the interior Agency / Tribal limits, i.e. for the works located
beyond 16 KMs from any all weather route inside Agency / Tribal. NOTE:- (1) No extra percentage
AGENCY/ TRIBAL is permissible in respect of Forest produce such as Bamboo, Rellu grass and for all materials
AREA obtained from outside the Agency / Tribal (2) The extra percentage under Agency / Tribal areas
allowance may be allowed on the labour component and on the labour charges in the rates for
conveyance of materials (3) The extra percentage on cost of materials in Agency / Tribal areas can
be allowed on the labour component only, if they are manufactured in the Agency / Tribal areas
itself except Forest produce.
CSOR Pipe lines where depth is less than 1.50 times the width ( Add 75% extra in restricted places)
CSOR Pipe lines where depth is 1.50 times or more than the width ( Add 120% extra in restricted places)
CSOR Silt removal in UT's, Culverts and Syphons in restricted area (Add 120% extra in restricted places)
High berm cutting of not more than 150mm average thickness and sectioning for roads (Add 50%
CSOR extra in restricted places)
TIMBER & ROOFING MATERIALS (Landing cost – including cost of conveyance, loading & unloading)
PAINTS & POLISHES (Landing cost – Including loading, cost of conveyance & unloading)
101 E White cement (R&B SSR) 1 Kg 27.95
100 D Shell lime slaked and screened (R&B SSR) 1 Cum 940.00
405 BMT-J.01 Supply of water based Cement Primer of Interior Grade- 1 1 Kg 141.00
406 BMT-J.02 Supply of water based Cement Primer of Exterior Grade- 2 1 Kg 180.00
408 BMT-J.03 Supply of Red Oxide Primer Paint for iron works of Grade -1 1 Litre 121.00
409 BMT-J.04 Supply of Zinc Chromate Yellow Oxide Primer paint for iron 1 Litre 175.00
410 BMT-J.05 Supply of Wood Primer 1 Litre 130.00
411 BMT-J.06 Supply of Metal paste (Putty) for steel works 1 Kg 130.00
412 BMT-J.07 Supply of Putty for wood work 1 Kg 130.00
413 BMT-J.08 Supply of White Lead 1 Kg 93.00
414 BMT-J.09 Supply of Synthetic clear Varnish 1 Litre 137.00
415 BMT-J.10 Supply of Spirit 1 Litre 96.00
416 BMT-J.11 Supply of Linseed Oil 1 Litre 55.00
421 BMT-J.19 Supply of wood adhesive compound 1 Kg 212.00
423 BMT-J.20 Supply of Dry Powder Distemper 1 Kg 40.00
424 BMT-J.21 Supply of acrylic based Oil Bound washable Distemper 1 Kg 81.00
Supply of synthetic polymer luxury plastic emulsion paint of
431 BMT-J.22 superior grade having VOC (Volatile Organic Compound) content 1 Litre 404.00
less than 50 grams/ liter.
434 BMT-J.32 PMCC / Deco orient base or Equivalent exterior Texture 25 Kg 818.00
LABOUR CHARGES FOR FABRICATION, WROUGHT AND PUT UP DOORS AND WINDOWS
Labour charges for fixing Iron Doors, Iron Windows and Window
903 BMM-V.15 Grills in position 1 Kg 5.00
Flush door shutters, solid bond wood block board type with teak
690 BMT-N.12 ply on both faces.: 25 mmthick conforming to IS:2202 1 sqm 1790.00
STEEL CENTERING CHARGES (HIRE AND LABOUR) (Un supported height up to 3.66 Mts)
A FOOTINGS 1 Cum 919.00
B BED BLOCKS, BANDS 1 Cum 405.00
C PEDESTALS 1 Cum 1332.00
D PLINTH BEAMS 1 Cum 2911.00
E LINTELS 1 Cum 2795.00
F CHAJJAS - SUNSHADES 1 Sqm 481.00
G COLUMNS 1 Cum 2623.00
H BEAMS 1 Cum 3988.00
I SLABS - Up to 150 mm thick 1 Sqm 462.00
J SLABS - Above 150 mm and up to 300 mm 1 Sqm 476.00
K SLABS - Above 300 mm thick 1 Sqm 498.00
L WAFFLE - (GRID) SLABS (Rib Beams with slabs) 1 Sqm 1641.00
M PERGOLA SLABS (Only Rib Beams) 1 Sqm 1151.00
N ARCH BEAMS - up to 1.5 M Span 1 Cum 4533.00
O ARCH BEAMS - above 1.5 M Span 1 Cum 4597.00
P DOME SLABS 1 Cum 7329.00
Q HELICAL STAIRCASES 1 Sqm 559.00
31
Centering and scaffolding charges for RCC members including all materials and
labour charges for forming and dismantling.
a) R C C Elevated Service Reservoir of staging up to 15 Meter below L W L.
1 Slabs thickness (150 mm to 300 mm) 4028.00
2 Slab thickness above 300 mm extra for every 50mm thickness increase 473.00
3 Side walls curved surfaces. (rate is for both sides centering) 3044.00
4 Side wall straight surfaces. (rate is for both sides centering) 1 SqMt 2708.00
Centering
5 Dome area 3300.00
6 Roof Slab 1846.00
1 SqMt
Centering
Sl. Item Code/ area Basic
No. CFMS Code Description of item Unit Rates
7 Column braces and beams 1359.00
8 Circular braces, ring beams & circular column. 1491.00
Note: - For RCC ELSR of staging above 15 m, the % increase in these rates shall be as follows. 15-18 m ---- 9% ,
18-21m --- 15% , 21-24 m --- 21%, 24 -27m --27%, above27m --- 30%
RCC vertical walls of plane surface (rate is for both sides centering) including
4-a) open drains 1000.00
1 SqMt
VCC vertical walls of plane surface (rate is for both sides centering) including Centering
4-b) open drains area
980.00
5) RCC vertical walls of circular faces (rate is for both sides centering) 1270.00
32 LIFT OR DELIFT OF MATERIALS
Lifting of cement concrete for RCC elevated reservoir. For every 1m height or
a)
part thereof over the initial lift of 3 m
1 Cum 161.00
Delifting the materials such as stones, concrete etc., for concrete below
ground level for construction of masonry ground level reservoirs, construction
b) of ground level reservoirs, inspection wells, test wells and sump wells etc., for 1 Cum 50.00
every 1 m depth or part there of beyond the initial depth of 3 meters from
ground level.
Extra allowance for isolated scattered works viz., valve pits / chambers, public Each 30% extra over the
39 (a) fountains, meter pits and manholes, delivery cistern etc., complete. cost of chamber.
Repairs to the existing mains, interconnections, replacement of valves/specials 100% extra over the
(b) etc., including the cutting, jointing, bailing out of water, drying, earth work cost of work
excavation etc., complete.
44
Rates for OHSRs/ELSRs including fixtures with a staging of 10 m without Seismic
analysis.
a Up to 10,000 Liters capacity Liter 58.91
b 15,000 Liters capacity Liter 44.00
c 20,000 Liters capacity Liter 39.80
d 40,000 Liters capacity Liter 33.74
e 60,000 Liters capacity Liter 25.57
f 1,00,000 Liters capacity Liter 23.59
g 2,00,000 Liters capacity Liter 20.62
h 3,00,000 Liters capacity Liter 19.40
i 4,00,000 Liters capacity Liter 17.09
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
j 4,50,000 Liters capacity Liter 14.77
NOTE: - (I) All concrete members shall be designed with M30 grade design mix.
1) For intermediate ranges proportional rates may be adopted
2) The above rates are applicable for Elevated Level Services Reservoirs / OHSRs with RAFT
FOUNDATION and a rate of Rs.3672/- per tonne for cement and Rs.39,000/- per tonne for steel.
3) For every Meter of staging less than 10 m, the rate shall be reduced by Rs.0.05 paisa per liter per
every Meter of difference in staging
4) For every Meter of staging above 10 m , the rate shall be increase by Rs.0.10 paisa per liter per every
Meter of additional in staging
5) The above rates shall be increased / decreased due to increase / decrease in the cost of cement by
Basic Rate x {(Rc-3672)/3672 } x 0.07 ie., Rc = Rate of cement (Rs per Mt) at the time of preparation of
estimate.
6)The above rates shall be increased / decreased due to increase / decrease in the cost of steel by Basic
Rate x { (Rs-39000)/39000 x 0.2 ie., Rs = Rate of steel (Rs per Mt) at the time of preparation of estimate.
7) Rate inclusive of three coats of epoxy paint Food Grade of best quality to inner surface of the
Reservoir including roof.
8) The above rates shall be adopted for estimate purposes for construction of ELSR for a finished work
including 2 coats of whether proof emulsion painting for external surfaces, lettering, all required
fixtures, pipes, bends, valves etc., for pipe connections but excluding cost of pipes, bends and valves as
per departmental designs and drawings.
9) The above rates are applicable for wind pressures up to 250 kg / Sq m . For decrease in wind pressure
the rate has to be decreased by 5% per every 100kg/Sqm. If the ELSR / OHSR are to be designed for
seismic forces also, cost shall be arrived by working out detailed quantities based on the designs.
10) (a)For tribal/Agency / Rural area, the above rates as arrived up to shall be increased by 10%.
(b) An additional increase of 7.50% shall be allowed for OHSRs/ELSRs located in agency areas over the
above rates for RWS Department works.
11) If the ELSR is to be designed for seismic forces also, cost shall be arrived by working out detailed
quantities based on the design & difference to be paid extra.
12) If the ELSR is to be designed for seismic forces a) The above rates are applied up to Zone-II earth
quake. b) For Zone-III earth quake the above rates are to be increased by 15 %.
13) The rate is arrived with the Cement rate of Rs.3672/- per MT & Steel rates (Fe 500) of Rs.39000/-
per MT approved by the BoCE for the month of February 2020.
(II) Fixtures include :
a) RCC or Aluminium ladder inside 0.60 m wide.
b) Spiral staircase on the outside shall be provided up to 200KL. Above 200KL capacity dog legged
staircase shall be provided with staircase flight width of 1.0mts and landing width of 1.20mts with S.S
railing up to 1.0 height.
g) The ladder shall be with M.S ladder and Verticals with HDPE of 10kg/Sqcm shall be provided for single
column OHSRs only.
l). D.I swan neck ventilators shall be provided in top dome and slab.
m). The above rates are exclusive of all inlet, out let connection and valves. All valves near inlet, out let
and for scour of ELSRs shall be D.I valves of heavy duty confirming to the specification of SoR item No.28
DISMANTLING clearing away and carefully stacking materials useful for reuse.
863 BMT-S.01 Stone masonry in cement mortar 1 Cum 390.00
864 BMT-S.02 Terracing work in roofs or floors 10 Sqm 165.00
868 BMT-S.06 Wrought and framed timber in roofs or floors 1 Cum 206.00
869 BMT-S.07 Old lime mortar plaster 10 Sqm 44.00
870 BMT-S.08 Old cement mortar plaster 10 Sqm 55.00
873 BMT-S.11 Kadapa slabs or Shahabad stone slabs flooring on sand bed 10 Sqm 66.00
874 BMT-S.12 Through scraping of old plastered surface 10 Sqm 44.00
875 BMT-S.13 Washing of plastered surface with soap, soda and water (or with 10 Sqm 14.00
soda lime and water)
Dry rough stone revetment for aprons and stacking within 40
137 a.i
metres
1 cum 65.60
25 (A) Cutting open B.T. road surface (as well as asphalt concrete up to 75 mm thick) 10 Sqm 794.00
including water bound macadam
25 (B) Cutting open C.C. road surface with concrete saw cutter and removal with 1 Cum 2424.00
Breaker
25 ( c ) Cutting open water bound macadam road including soiling 1 Cum 270.00
638 BMW-1.44 Cutting holes in C.C, basement & repairs Labour charges 1 No 107.00
639 BMW-I.45 Cutting holes in stone masonry& basement and repairs 1 No 72.00
640 BMW-I.46 Cutting holes in Brick masonry& repairs Labour charges only 1 No 47.00
641 BMW-I.47 Cutting holes in RCC slab floor & repairs Labour charges only 1 No 72.00
DRILLING HOLES IN HARG GRANITE OR SHEET ROCK
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
1010 BMS-W.76 Drilling holes in hard rock surfaces up to 18mm dia 1 RMt 187.00
1011 BMS-W.77 Drilling holes in hard rock surfaces above 18mm dia 1 RMt 261.00
Making holes up to 18mm dia in RCC/ any stones up to 50 mm
1012 BMS-W.78 thick 1 No 32.00
1013 BMS-W.79 Making holes above 18mm dia in RCC/ any stones above 50 mm 1 No 44.00
thick
137 7 (a) Manually ( Hand)
138 i) 20 mm dia meter 1 RMt 136.00
139 ii) 25 mm dia meter 1 RMt 144.00
140 iii) 36 mm dia meter 1 RMt 166.00
141 b) Pneumatic Compressor
142 i) 20 mm dia meter 1 RMt 154.00
143 ii) 25 mm dia meter 1 RMt 167.00
144 iii) 36 mm dia meter 1 RMt 182.00
987 BMS-W.53 Dressing faces of granite stone (double line dressing) 1 Sqm 183.00
988 BMS-W.54 Dressing faces of other than granite stone (double line dressing) 1 Sqm 114.00
BAILING OUT LABOUR CHARGES FOR PIPE LINE TRENCHES FOR MORE THAN 5 HP
PUMP SETS CAPACITY
A. Water lifting charges using Electrical driven pump
Per HP Hour rate (including contractors profit and overhead charges of
i.
13.615% (Excl 13.615% = 9.01)
HP Hour 10.24
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
Other expenses in terms of Mazdoor, pump operator and pipe laying and
ii. dismantling(including contractors profit and overhead charges of 13.615%) per Hour 166.78
hour (Excl 13.615% = 146.79)
Total hire charges of Electrically driven dewatering pump per hour (10.24 x HP capacity) +
Excl 13.615% = (9.01 x HP capacity) + 146.79 Per hour 166.78 Per hour
Other expenses in terms of Mazdoor, pump operator and pipe laying and
ii. dismantling(including contractors profit and overhead charges of 13.615%) per Hour 201.55
hour (Excl contractor`s profit 13.615% = 177.40)
Total hire charges of Diesel driven dewatering pump per hour Excl CP (25.51 x HP capacity) +
13.615% = (22.45 x HP capacity) + 177.40 Per hour 201.55 Per hour
NOTE:- The rate is payable on the total H.P. hours ignoring fractions less than 0.5 HP hour and
rounding off 0.5 HP hour or more to the next higher integer.
Removal of wet silt and sludge by manual means from sullage drains with aid
40
of baskets and vessels.
10 Cum 2734.00
d) Beyond 5 mts deep under water for every additional 1 m depth over item 'c' 10 Cum 5431.00
NOTE:- The above rates do not include rock requiring blasting or chiseling
TUNNELING WORK FOR RAILWAY, ROAD AND CANAL CROSSING
Railway crossing/ Road crossing/ Canal crossing by adopting trenchless technology tunneling work through
specialized pipe jacking method by erecting the equipment to true to the alignment and gradient, by hydraulic
pipe jacking technique complete including tunneling, excavation in all types of soils including hard rock and
construction of RCC chambers suitable to casing pipe pits, and conveyance charges of machinery and other
required materials but excluding cost of encasing pipe, in co-ordination with the concerned authorities as per
approved drawings and directed by the Engineer in-charge
ELECTRICAL ITEMS
Supply of ……...WPSC (Weather Proof Single Core) ISI Alluminium service Wire. Makes:
34 ELEC-1.6.1 Gold Medal/ Million/ GM / Vimal/ Finecab/ Nakoda/ Plaza/ Payal/ Sudhakar/
Rajnigandha/ Airson/ Orbit/ ollvin/ Beljin
a 2.5 Sqmm 1 RMt 6.90
b 6 Sqmm 1 RMt 13.75
c 10 Sqmm 1 RMt 15.00
d 16 Sqmm 1 RMt 25.00
Supply of ……….WPTC (Weather Proof Twin Core) ISI Alluminium Wire. Makes: Gold
35 ELEC-1.6.2 Medal / Million / GM / Vimal / Finecab / Nakoda / Plaza / Payal / Sudhakar/ Rajnigandha/
airson/ Orbit/ ollvin/ Beljin
6 Sqmm 28.00
10 Sqmm 33.85
36 ELEC-1.6.3 Supply of 3 Core…………. Flat Copper cable of ISI for Submersible Motors confirming to
IS:694:1990. Makes: Finolex / RR Kabel/ Polycab / Havells / KEI/Gloster/ Gold Medal/ GM
Supply and Transportation of ……….., 5star rated submersible motor pumpset, confirming
to IS 8034 and motor confirming to IS 9283 with water proof winding, Pump shall be
215 ELEC-5.4.3 suitable for various delivery head and discharge with stainless steel shaft.Motor suitable
for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 4" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI / KSB/ Lubi/ PSG/ AryenVarsha
Supply and Transportation of ……….., 5star rated submersible motor pumpset, confirming
to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump shall be
suitable for various delivery head and discharge with stainless steel shaft.Motor suitable
216 ELEC-5.4.4 for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 4" Bore well.
Makes: Pluga / U-Neel / Sterling / Falcon / Kumar / Unnati zen/ Duke/ Lada/ Ellen/
Suguna/ UNItek/ KSP(Karunya)/ Anco/ Sabar/ Fitwell/ Deccan/ Karvel/ SILVER
Supply and Transportation of ……….., 5star rated submersible motor pumpset, confirming
to IS 8034 and motor confirming to IS 9283 with water proof winding, Pump shall be
217 ELEC-5.4.5 suitable for various delivery head and discharge with stainless steel shaft.Motor suitable
for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 6" Bore well.
Makes: Kirloskar / Crompton / Texmo / CRI / KSB/ Lubi/ PSG/ AryenVarsha
Supply and Transportation of ……….., 5star rated submersible motor pumpset, confirming
to IS 8034 and motor confirming to IS 9283 with water proof winding,Pump shall be
suitable for various delivery head and discharge with stainless steel shaft. Motor suitable
218 ELEC-5.4.6 for working on 415V ± 10% , Three Phase 50 Hz AC supply,etc complete for 6" Bore well.
Makes: Pluga / U-Neel / Sterling / Falcon / Kumar / Unnati zen/Duke/Lada/Ellen/Suguna/
UNItek /KSP (Karunya) /Anco/ Sabar/Fitwell/Polycab/Deccan/Karvel/ SILVER
Supply and Transportation of ……...Single phase open well ISI submersible motor pumpset
confirms to IS 14220 : 1994. Makes: Pluga / U-Neel / Sterling / Falcon / Kumar / Unnati
220 ELEC-5.4.8 zen/Duke/LDK/Ellen/Suguna/UNItek /KSP (Karunya) / Anco/
Sabar/Fitwell/Deccan/Karvel/ SILVER
a 1.00HP 1 No 10500.00
b 1.50HP 1 No 12000.00
c 3.00HP 1 No 16350.00
THREE PHASE OPEN WELL SUBMERSIBLE PUMP SETS
Supply and Transportation of ……... Three phase open well ISI submersible motor pumpset
221 ELEC-5.4.9 confirms to IS 14220 : 1994. Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi /PSG/
AryenVarsha
a 3.00HP(65x50) 1 No 17200.00
b 5.00HP(75x65) 1 No 21500.00
c 7.50HP(100x75) 1 No 25500.00
d 10.00HP(100x75) 1 No 32500.00
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
Supply and Transportation of ……... Three phase open well ISI submersible motor pumpset
222 ELEC-5.4.10 confirms to IS 14220 : 1994. Makes: Pluga / U-Neel / Sterling / Falcon / Kumar / Unnati
zen/Duke/LDK/Ellen/Suguna/UNItek/ KSP(Karunya) /Polycab/ Anco/ Sabar
/Fitwell/Deccan/Karvel/ SILVER
a 3.00HP(65x50) 1 No 16500.00
b 5.00HP(75x65) 1 No 20200.00
c 7.50HP(100x75) 1 No 24000.00
d 10.00HP(100x75) 1 No 31000.00
SINGLE PHASE MONO BLOCK MOTOR PUMP SETS.
Supply and Transportation of ……. Single phase Mono block CI body motor pumpset
223 ELEC-5.4.11 confirms to IS 9079:2002 Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi / Havells
Hi-flow V2 / PSG/AryenVarsha
a 0.5HP(25x25mm) 1 No 5000.00
b 1.0HP (25x25mm) 1 No 7150.00
c 1.5HP(32x25mm) 1 No 9600.00
Supply and Transportation of ……. Single phase Mono block CI body motor pumpset
224 ELEC-5.4.12 confirms to IS 9079:2002 Makes: Pluga / U-Neel / Sterling / Falcon / Kumar / Unnati
zen/Ellen/LDK/Suguna/UNItek/Polycab/Anco/ Sabar/Fitwell/Deccan/Karvel / SILVER
a 0.5HP(25x25mm) 1 No 4700.00
b 1.0HP (25x25mm) 1 No 6800.00
c 1.5HP(32x25mm) 1 No 9150.00
Supply and Transportation of………. Three phase ISI self priming Mono block IP44 motor
225 ELEC-5.4.13 pumpset. Makes: Kirloskar / Crompton / Texmo / CRI / KSB /Lubi/ AryenVarsha
a 2.00HP(40x40mm) 1 No 14200.00
b 3.0HP (50x50mm) 1 No 19200.00
c 5.00HP(80x80mm) 1 No 23200.00
Supply and Transportation of………. Three phase ISI self priming Mono block IP44 motor
226 ELEC-5.4.14 pumpset. Makes: Pluga / U-Neel / Sterling / Falcon / Kumar / Unnati
zen/Ellen/LDK/Suguna/UNItek/Polycab/Anco/ Sabar/Fitwell/Deccan/Karvel/ SILVER
a 2.00HP(40x40mm) 1 No 13500.00
b 3.0HP (50x50mm) 1 No 18300.00
c 5.00HP(80x80mm) 1 No 22200.00
CONTROL PANEL BOARD FOR MOTOR PUMPSETS
Supply & Fixing of D.O.L Starter 250V, Single phase, 50Hz. With
SS enclouser comprising of contactor with bimetalic relay with
233 ELEC-5.4.18 necessary push buttons, etc., complete suitable for…… Makes: 1 No 950.00
Siemens / Crompton / L&T (MF1) up to 3 HP.
a Up to 3 HP 1 No 1700.00
b 5 to 7.50 HP 1 No 1900.00
c 10 HP 1 No 2100.00
Sl. Item Code/ Basic
No. CFMS Code Description of item Unit Rates
Supply & Fixing of Star-Delta Starter 415V, 3 phase, 50Hz..
235 ELEC-5.4.20 enclosed with no volt coil, overload protection and single phase
preventor , etc., complete suitable for Makes: Siemens /
Crompton / L&T (MU1 DOL)
a 12.50 to 15HP 6800.00
b 25HP to 30HP 11220.00
LAYING AND JOINTING PVC PIPES (UP TO 50MM DIA)
Laying, jointing of PVC/HDPE pipes as per BIS No.7634 part-III/75 for PVC and BIS No.7634 part-II/75
12-b for HDPE pipes including trench excavation and refilling. (If the depth of trench is more than 0.50 Mts
separate rates to be worked out)
50 mm dia 1 Rmt 38.00
40mm dia 1 Rmt 38.00
32mm dia 1 Rmt 38.00
25mm dia 1 Rmt 35.00
20mm dia 1 Rmt 33.00
LABOUR CHARGES FOR FIXING AIR VALVES KINETIC AIR VALVES
Labour charges for fixing Air valves including boring the mains and threading the bore fixing nipple
17
etc., complete
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves, Double Air valves/ Air Cushion
18 valve excluding cost of jointing materials such as bolts, nuts and rubber insertions etc., complete.
Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI
133 BMW-D.01 marked conforming to IS:2556-Part-3-1981 with"P" or "S" trap: 1 No 934.00
580 mm Long
Supplying & Fixing Indian pattern white glazed W.C 1st quality ISI
134 BMW-D.02 marked conforming to IS:2556-Part-3-1981 with"P" or "S" trap: 1 No 934.00
630 mm Long
145 BMW-D.13 Supplying and Fixing European Water Closet of 1st quality 1 No 1784.00
conforming to IS:2556-Part-2-1973 of white glazed with 'P' trap
Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are
produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made
from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007)
CLASS - 15
80 3.00 70.94 212.82 0.390 111.00 43.29 75.00 50.00 306.11
100 3.80 70.94 269.57 0.435 111.00 48.29 91.00 60.67 378.52
125 4.80 70.94 340.51 0.580 111.00 64.38 119.00 79.33 484.23
150 6.30 70.94 446.92 0.620 111.00 68.82 150.00 100.00 615.74
200 9.00 70.94 638.46 1.160 111.00 128.76 156.00 104.00 871.22
250 12.50 70.94 886.75 1.160 111.00 128.76 180.00 120.00 1135.51
300 15.40 70.94 1092.48 1.450 111.00 160.95 180.00 120.00 1373.43
350 26.50 70.94 1879.91 1.950 111.00 216.45 205.00 136.67 2233.03
400 31.40 70.94 2227.52 1.950 111.00 216.45 251.00 167.33 2611.30
450 38.00 70.94 2695.72 2.275 111.00 252.53 294.00 196.00 3144.25
500 54.10 70.94 3837.85 4.960 111.00 550.56 340.00 226.67 4615.08
CLASS - 20
80 3.10 70.94 219.91 0.390 111.00 43.29 75.00 50.00 313.20
100 3.90 70.94 276.67 0.435 111.00 48.29 91.00 60.67 385.62
125 5.40 70.94 383.08 0.580 111.00 64.38 119.00 79.33 526.79
150 6.40 70.94 454.02 0.620 111.00 68.82 150.00 100.00 622.84
200 9.70 70.94 688.12 1.160 111.00 128.76 156.00 104.00 920.88
250 13.80 70.94 978.97 1.160 111.00 128.76 180.00 120.00 1227.73
300 17.50 70.94 1241.45 1.450 111.00 160.95 180.00 120.00 1522.40
350 28.10 70.94 1993.41 1.950 111.00 216.45 205.00 136.67 2346.53
400 33.80 70.94 2397.77 1.950 111.00 216.45 251.00 167.33 2781.56
450 40.60 70.94 2880.16 2.275 111.00 252.53 294.00 196.00 3328.69
500 56.60 70.94 4015.20 4.960 111.00 550.56 340.00 226.67 4792.43
CLASS - 25
80 3.20 70.94 227.01 0.390 111.00 43.29 75.00 50.00 320.30
100 4.00 70.94 283.76 0.435 111.00 48.29 91.00 60.67 392.71
125 5.60 70.94 397.26 0.580 111.00 64.38 119.00 79.33 540.98
150 6.80 70.94 482.39 0.620 111.00 68.82 150.00 100.00 651.21
200 10.10 70.94 716.49 1.160 111.00 128.76 156.00 104.00 949.25
250 14.30 70.94 1014.44 1.160 111.00 128.76 180.00 120.00 1263.20
300 18.10 70.94 1284.01 1.450 111.00 160.95 180.00 120.00 1564.96
350 29.80 70.94 2114.01 1.950 111.00 216.45 205.00 136.67 2467.13
400 35.80 70.94 2539.65 1.950 111.00 216.45 251.00 167.33 2923.44
450 42.80 70.94 3036.23 2.275 111.00 252.53 294.00 196.00 3484.76
500 60.10 70.94 4263.49 4.960 111.00 550.56 340.00 226.67 5040.72
IMPORTANT DATAS FOR THE YEAR 2020-21
Quantity Description of the work Rate Per Amount
Earth work excavation in all kinds of soils including boulders upto 0.30m dia for foundation of
structures as per drawings and technical specifications clause 305.1 including setting out,
construction of shoring and bracing removal of stumps and other deleterious materials and
1 disposal upto lead of 50mts, dressing of sides and bottom and back filling in trenches with
excavated suitable material including seigniorage charges as per technical specifications 305
MORD/304 MORTH with manual up to 3 Mts depth (IC No: FNDN-1)
Earth work excavation in all kinds of soils/HDR including boulders upto 0.30 mts dia for
foundation of canal cross drainage and other appurtenant structures and placing excavated
2 stuff neatly in specified dump area or disposing off the same as directed etc., complete with
initial lead upto 10mts and initial lift upto 1.50mts including seigniorage charges etc.,
complete., ( Output 2.50 cum per day) with manual upto 3 Mts depth.
Earth work excavation in soft rock (including F&F) without blasting, including boulders upto
0.30m dia for foundations of canal cross drainage and other appurtenant structures and
3 placing excavated stuff neatly in specified dump area or disposing off the same as directed
etc., complete with initial lead upto 10mts and initial lift upto 1.50mts including seigniorage
charges etc., complete., ( Output 1.33 cum per day) with manual upto 3 Mts depth
Earth work excavation in hard rock without blasting, including boulders upto 0.30m dia for
foundations of canal cross drainage and other appurtenant structures and placing excavated
4 stuff neatly in specified dump area or disposing off the same as directed etc., complete with
initial lead upto 10mts and initial lift upto 1.50mts including seigniorage charges etc.,
complete., ( Output 0.67 cum per day) with manual upto 3 Mts depth.
Earth work excavation in all kinds of soils including boulders upto 0.30m dia for foundation of
structures as per drawings and technical specifications clause 305.1 including setting out,
construction of shoring and bracing removal of stumps and other deleterious materials and
5 disposal upto lead of 50mts, dressing of sides and bottom and back filling in trenches with
excavated suitable material including seigniorage charges as per technical specifications 305
MORD/304 MORTH with manual 3 to 6 Mts depth.
Earth work excavation in all kinds of soils including boulders upto 0.30m dia for foundation of
structures as per drawings and technical specifications clause 305.1 including setting out,
construction of shoring and bracing removal of stumps and other deleterious materials and
6 disposal upto lead of 50mts, dressing of sides and bottom and back filling in trenches with
excavated suitable material including seigniorage charges as per technical specifications 305
MORD/304 MORTH with machinery upto 3 Mts depth. (Taking output 240 cum) IC No: FNDN-
1 (B)
Augoring and boring of holes in situ for bored cast-insitu RCC piles for building foundations in
loamy, clayey soil like black cotton soils and ordinary soils without under reams as per IS 2911-
15 1980 as per approved designs including all operations, incidental, labour charges, hire charges
of machinery, augur bore drill and shell equipment etc., complete., for all depths and for
finished item of work upto 300mm dia piles. (Sl.No: 20 A of SSR Data)
Augoring and boring of holes in situ for bored cast-insitu RCC piles for building foundations in
loamy, clayey soil like black cotton soils and ordinary soils without under reams as per IS 2911-
16 1980 as per approved designs including all operations, incidental, labour charges, hire charges
of machinery, augur bore drill and shell equipment etc., complete., for all depths and for
finished item of work for 350mm to 450mm dia piles.(Sl.No: 20 B of SSR Data)
Augoring and boring of holes in situ for bored cast-insitu RCC piles for building foundations in
loamy, clayey soil like black cotton soils and ordinary soils without under reams as per IS 2911-
17 1980 as per approved designs including all operations, incidental, labour charges, hire charges
of machinery, augur bore drill and shell equipment etc., complete., for all depths and for
finished item of work for 500mm to 700mm dia piles.(Sl.No: 20 C of SSR Data)
Under - reaming for bored cast-in-situ RCC piles for building foundations in loamy, clayey soils
like black cotton soils and ordinary soils with Augoring and boring equipment in site as per IS
2911-1980 as per approved designs including all operations, incidental, labour charges, hire
18
charges of machinery, augur bore drill and shell equipment, etc., complete., for all depths and
for finished item of work for piles upto 300mm dia double under reaming.(Sl.No: 21 A of SSR
Data)
Under - reaming for bored cast-in-situ RCC piles for building foundations in loamy, clayey soils
like black cotton soils and ordinary soils with Augoring and boring equipment in site as per IS
2911-1980 as per approved designs including all operations, incidental, labour charges, hire
19
charges of machinery, augur bore drill and shell equipment, etc., complete., for all depths and
for finished item of work for piles upto 350mm to 450mm dia double under reaming.(Sl.No:
21 B of SSR Data)
Under - reaming for bored cast-in-situ RCC piles for building foundations in loamy, clayey soils
like black cotton soils and ordinary soils with Augoring and boring equipment in site as per IS
2911-1980 as per approved designs including all operations, incidental, labour charges, hire
20 charges of machinery, augur bore drill and shell equipment, etc., complete., for all depths and
for finished item of work for piles upto 500mm to 700mm dia double under reaming.(Sl.No:
21 C of SSR Data)
Quantity Description of the work Rate Per Amount
2.00-0.74 days
=1.26 Second Class mason 500.00 1 day 630.00
Total : 1 Cum
Cement Concrete (1:2:4) mix using concrete mixer with 1/3 quantity of 20mm HBG M/C Metal
and 2/3 quantity of 40mm HBT Metal including cost and conveyance of all materials and all
33 labour charges etc., complete for SIDE DRAINS
RCC (1:2:4) for footings corresponding to Table 9 of IS 456 using 20mm HBG M/C Metal from
approved quarry including cost and conveyance of all materials and including operational,
incidental, machine mixing, vibrating, centering, scaffolding charges, curing etc., complete.,
34 but excluding cost of steel and its fabrication charges for finished item of work.
Fly Ash Cement solid blocks of size 290 x 225 x 140 mm for masonry work in CM (1:6) prop
with for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum
of 5 kgs. and stone dust including cost and conveyance of all materials, labour charges,
46
seiniorage charges, scaffolding and curing etc., cpomplete with a compresive streangth not
lessthan 50 kg/sqcm for walls for Superstructure Walls. (Data as per BLD-CSTN-6-18) (Unit - 1
Cum)
110 Nos No of blocks required for one cum of Masonry 24.00 1 No 2640.00
0.10 cum Cost of Cement Mortar (1:6) 1 Cum
0.42 day Mason 1st class 550.00 1 day 231.00
0.92 day Mason 2nd class 500.00 1 day 460.00
0.70 day Man Mazdoor 460.00 1 day 322.00
2.10 day Woman Mazdoor 460.00 1 day 966.00
Add 1% for water on materials and labour for mixing and curing
Total: 1 Cum
Cement Mortor in CM (1:5) including cost and conveyance of all materials and all labour
47 charges etc., complete., for to use in plastering (IC No: CSTN-1-4)
288 Kgs Cost of cement 1 Kg
1.05 Cum Sand for Mortor 1 Cum
0.20 days Man Mazdoor for mixing cement mortor 460.00 1 day 92.00
Add 1% for water on materials and labour for mixing and curing
Total: 1 Cum
Plastering with C.M. (1:3) 12mm thick including cost and conveyance of all materials.
48 scaffolding charges, curing and all labour charges etc., complete., IC 6-1) (Amendment for
labour content given in SOR 2016-17 vide BLD-CSTN 6-1 to 6-8)
Plastering in CM two coats 12 mm thick with CM (1:5) 8mm thick base coat and CM (1:3)
53 4mm thick sponze finish including cost and conveyance of all materials and all labour charges
etc., complete., ( I Code BLD-CSTN-6-10)
Plastering in CM two coats 20 mm thick with CM (1:6) 16mm thick base coat and CM (1:4)
54 4mm thick with Dubara sponze finish in 2 coats including cost and conveyance of all materials
and all labour charges etc., complete., ( I Code BLD-CSTN-6-9)
RCM facia 5cms thick in CM (1:3) for drop walls, fins with rabbit wire mesh and nominal
reinforcement as directed by Eingineer-in-charge with dubara sponge finishing, including cost
and conveyance of all materials to site, operation and incidental charges, cost and conveyance
55 of all materials excluding cost of steel and its fitting charges including centering, curing,
scaffolding and form work, lift charges etc., complete for finished item of work (As per I Code
BLD-CSTN-6-11)
13.30 Sqm Rabbit wire mesh (BMT-F-28) Building SSR 17.00 1 Sqm 226.10
0.25 cum Cement Mortor (1:3) for 25mm thick 1 Cum
50.00 Kgs Dry cement for making lumps 1 Kg
10.10 Sqm Vitrified tiles screen printed (BMT-C-06 Sl. No: 45) 418.00 10 Sqm 4221.80
21.60 Kgs Cost of cement for base coat 1 Kg
33.00 Kgs Cost of cement for slurry 1 Kg
6.00 Kgs Cost of cement for pointing 1 Kg
0.12 Cum Cost of sand for base coat 1 Cum
0.02 Cum Cost of sand for pointing 1 Cum
Quantity Description of the work Rate Per Amount
10.10 Sqm Non skid ceramic tiles (BMT-C-04 Sl. No: 43) 508.00 1 Sqm 5130.80
21.60 Kgs Cost of cement for base coat 1 Kg
33.00 Kgs Cost of cement for slurry 1 Kg
2.00 Kgs Cost of white cement (Roads SSR 101.E) 27.95 1 Kg 55.90
0.12 Cum Cost of sand for base coat 1 Cum
0.96 days Mason first class 550.00 1 day 528.00
2.24 days Mason second class 500.00 1 day 1120.00
3.30 days Mazdoor 460.00 1 day 1518.00
Add 1% for water on materials and labour for mixing and curing
Total : 10 Sqm
Flooring with high polished granite 16 to 18mm thick slabs other than black set over a base
coat of CM (1:8) 20mm thick over already laid cement concrete bed including neat cement
slurry at 3.30 kgs per sqm and jointing neatly with white cement paste to full depth of slabs
laid on already laid cement concrete bed set over base coat of CM (1:8) 12mm thick including
62 neat cement slurry spread at 3.30 kgs per sqm and jointing to full depth of polished granite
slabs including cost and conveyance of all materials and labour charges, filling joints neatly,
dressing of flooring stones, etc., complete., (IC 7-7)
Roofing with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins
with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping /
65
drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided
with anti capillary grove.
Rate as per SSR BMS-W.45 (CFMS CODE MAT-01615)
1.00 Sqm 760.00 1 Sqm 760.00
and Sl. No: 980.
Providing and applying wall putty of white cement or equivalent putty such as birla wall care
putty or texture paint or equivalent such as NCL / Saicoat texture paint of average 2 to 3 mm
thickness over plastered surface to prepare the surface even and smooth after thoroughly
brushing the surface to remove all dirt and remains of loose powdered materials, applying
66 emery paper, sand the surface, clean and wipe off loose dust, applying putty / texture paint
filler by putty knife / muslin pad, air dry for 2-3 hours for the surface preparation including
cost and conveyance of all materials to work site and all operational, incidental, labour charges
etc., complete., for finished item of work for external walls excluding cost of access
scaffolding.(Sl.No: 19 of SSR Data)
Providing and applying wall putty of white cement or cement based or paris putty or lime
punning of average 1 to 2 mm thickness over plastered surface to prepare the surface even
and smooth after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials, applying emery paper, sand the surface, clean and wipe off loose dust,
67 applying knifing paste filler by putty knife/muslin pad, air dry for 2-3 hours, sand with 180 and
320 Nos emery paper for the surface preparation including cost and conveyance of all
materials to work site and all operational, incidental, labour charges etc., complete., for
finished item of work for internal walls.(Sl.No: 18 of SSR Data)
Roofing with corrugated GI sheets of 0.80mm/1.00mm/1.25mm thick fixed with GI "J" bolts
and nuts 8mm dia with bitumen and GI limpet washers filled with white lead and including a
coat of approved steel primer and two coats of approved paint on over lapping of sheets
68
complete up to a pitch of 60 degrees but excluding cost of purlins, rafters, trusses including all
labour charges etc., complete., (As per standard data BLD-CSTN-8-1,2 and 3) Unit = 184.518
Sqm
Add for standard specification 1mm thick ridging and 1.25mm thick sheet vallyes when
such are required for a particular work. Average allowance for 10 sqm roofing 0.41
Roofing with 6mm thick corrugated asbestos cement sheets, fixing withGI "J" bolts and nuts
8mm dia GI plain washers complete up to a pitch of 60 degrees but excluding cost of purlins,
69
rafters, trusses including all labour charges etc., complete., (As per standard data BLD-CSTN-8-
4) Unit = 216.14 Sqm
0.15 Ton 6mm thick Corrugated AC sheets 1 Ton
22.03 Nos GI "J" bolts 8mm dia 9.00 1 No 198.27
22.03 Nos GI washers 2.00 1 No 44.06
22.03 Nos Bitumen washers 2.00 1 No 44.06
0.43 days Carpenter second class 500.00 1 day 215.00
0.54 days Man Mazdoor 460.00 1 day 248.40
Sundries including 50x6mm iron wind ties white lead
Add for standard specification 1mm thick ridging and 1.25mm thick sheet vallyes when
such are required for a particular work. Average allowance for 10 sqm roofing
0.005 Cum Fine screeened shell lime (Roads SSR Sl.No: 100 D) 940.00 1cum 4.70
0.033 days First class mason 550.00 1 day 18.15
0.077 days Second class mason 500.00 1 day 38.50
0.22 days Mazdoor 460.00 1 day 101.20
LS Gum, Conjee water, brushes and ladder etc., 0.45
Total : 10 Sqm 163.00
White washing two coats with lime of approved quality to give an even shade after throughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost
71 and conveyance of all materials and all labour charges etc., complete., (IC 9-2)
0.007 Cum Fine screeened shell lime (Roads SSR Sl.No: 100 D) 940.00 1cum 6.58
0.048 days First class mason 550.00 1 day 26.40
0.112 days Second class mason 500.00 1 day 56.00
0.32 days Mazdoor 460.00 1 day 147.20
LS Gum, Conjee water, brushes and ladder hire charges 0.82
Total : 10 Sqm 237.00
White washing three coats with lime of approved quality to give an even shade after
throughly brushing the surface to remove all dirt and remains of loose powdered materials
72 including cost and conveyance of all materials and all labour charges etc., complete., (IC 9-3)
0.009 Cum Fine screeened shell lime (Roads SSR Sl.No: 100 D) 940.00 1cum 8.46
0.066 days First class mason 550.00 1 day 36.30
0.154 days Second class mason 500.00 1 day 77.00
0.43 days Mazdoor 460.00 1 day 197.80
LS Gum, Conjee water, brushes and ladder hire charges 0.44
Quantity Description of the work Rate Per Amount
1.34 Kgs Dry powder Distemper (Sl.No: 423 BMT-J-20) 40.00 1 Kg 53.60
0.15 days First class Painter 615.00 1 day 92.25
0.35 days Second class Painter 500.00 1 day 175.00
1.30 days Mazdoor 460.00 1 day 598.00
Sundries including brushes and ladder at 1% 9.19
Quantity Description of the work Rate Per Amount
Lumpsum 0.96
Total : 10 Sqm 929.00
Distemper two coats with Oil bound distemper to give an even shade after throughly
brushing the surface to remove all dirt and remains of loose powdered materials including cost
77 and conveyance of all materials and all labour charges etc., complete., (IC 9-10)
1.70 Kgs Oil bound Distemper (Sl.No: 424 BMT-J-21) 81.00 1 Kg 137.70
0.36 days First class Painter 615.00 1 day 221.40
0.84 days Second class Painter 500.00 1 day 420.00
Sundries including brushes and ladder at 1% 7.79
Lumpsum 0.11
Total : 10 Sqm 787.00
Painting to new walls with 2 coats of ready mixed oil bound wahsable distemper of approved
brand and shade over a base coat of appropriate primer of approved brand, making 3 coats in
all to give an even shade after thourughly brushing the surface to remove all dirt and remains
78
of loose powdered materials, including cost and conveyance of all materials to work site and
all operational, incidental, labour charges etc. complete for finished item of work as per SS 911
for internal walls (BLD-CSTN-10-1)
2.00 Kgs Water proof cement paint (Sl.No: 426 BMT-J-23) 49.00 1 Kg 98.00
0.09 days First class painter 615.00 1 day 55.35
0.21 days Second class painter 500.00 1 day 105.00
1.50 days Mazdoor 460.00 1 day 690.00
Sundries including brushes and ladder at 1% 9.48
Lumpsum 0.17
Total : 10 Sqm 958.00
Painting with snowcem or other equal approved water proof cement paint two coats over
80 priming coat including cost and conveyance of all materials and all labour charges etc.,
complete., (IC 10-4)
Lumpsum 0.96
0.70 lts Synthetic enamel paint (Sl.No: 432 BMT-J.29) 248.00 1 lt 173.60
0.21 days First class painter 615.00 1 day 129.15
0.49 days Second class painter 500.00 1 day 245.00
Sundries including brushes, soap, putty etc., 0.25
Total : 10 Sqm 548.00
Painting with synthetic enamel paint one coat for old iron work including cost and
82 conveyance of all materials and all labour charges etc., complete.,(IC 10-12-2)
0.50 lts Synthetic enamel paint 248.00 1 lt 124.00
0.21 days First class painter 615.00 1 day 129.15
0.49 days Second class painter 500.00 1 day 245.00
Sundries including brushes, soap, putty etc., 0.80
Total : 10 Sqm 498.95
Painting with synthetic enamel paint two coats for new wood work including cost and
83 conveyance of all materials and all labour charges etc., complete., (IC 10-12-3)
3.50 Kgs Epoxy coating ASTM-C 881 (BMT-H-113 Sl.No: 368) 425.00 1 Kg 1487.50
0.15 days First class painter 615.00 1 day 92.25
0.35 days Second class painter 500.00 1 day 175.00
1.50 days Mazdoor 460.00 1 day 690.00
Sundries including brushes, soap etc., at 1% 24.45
Lumpsum 0.80
Total : 10 Sqm 2470.00
Painting to new walls with two coats of acrylic interior emulsion paint having VOC (Volatile
Organic Compound) content less than 50 grams/ litre of approved brand and shade over a
base coat of appropriate primer of approved brand, making three coats in all to give an even
88 shade after throughly brushing the surface to remove all dirt and remains of loose powdered
materials including cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete., for finished item of work as per SS 911 for Internal
walls (APSS No: 912)
Painting to new walls with two coats of acrylic Exterior emulsion paint having VOC (Volatile
Organic Compound) content less than 50 grams/ litre of approved brand and shade over a
base coat of appropriate primer of approved brand, making three coats in all to give an even
89 shade after throughly brushing the surface to remove all dirt and remains of loose powdered
materials including cost and conveyance of all materials to work site and all operational,
incidental, labour charges etc., complete., for finished item of work as per SS 911 for External
walls (APSS No: 912)
Labour charges for erection of 0.50 HP Single phase Centrifugal Mono block pumpsets
90 including pipe connection for suction and delivery and all labour charges etc., complete.,
(Specification No: 11.1.1)
0.50 days Skilled fitter 585.00 1 day 292.50
1 day Helper 500.00 1 day 500.00
0.50 day Plumber 500.00 1 day 250.00
Total: 2 Jobs 1042.50
Total 1 No 521.25
Labour charges for erection of 1 HP to 2 HP Single phase Centrifugal Mono block pumpsets
91 including pipe connection for suction and delivery and all labour charges etc., complete.,
(Specification No: 11.1.2 to 4)
0.50 days Skilled fitter 585.00 1 day 292.50
1 day Helper 500.00 1 day 500.00
0.50 day Plumber 500.00 1 day 250.00
Total: 1 No 1042.50
Labour charges for erection of 3 HP to 10 HP three phase centrifugal pumpsets including pipe
92 connection for suction and delivery and all labour charges etc., complete., (Specification No:
11.1.5 to 8)
1 day Skilled fitter 585.00 1 day 585.00
1 day Helper 500.00 1 day 500.00
1 day Plumber 500.00 1 day 500.00
Total: 1 No 1585.00
Labour charges for erection of 15 HP three phase centrifugal pumpsets including pipe
93 connection for suction and delivery and all labour charges etc., complete., (Specification No:
11.1. 9)
1 day Skilled fitter 585.00 1 day 585.00
3 days Helper 500.00 1 day 1500.00
1 day Plumber 500.00 1 day 500.00
Total: 1 No 2585.00
Labour charges for erection of Ejecto type water pump single phase 0.50 HP to 3 HP single
94 stage pumpsets and three phase 3 HP single stage pumpsets including pipe connection for
suction and delivery and all labour charges etc., complete., (Specification No: 11.2.1 to 6)
Labour charges for erection of single phase submersible pumpsets (Bore well type) 1 HP to 2
96 HP pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (Specification No: 11.3.1 a to c)
Labour charges for erection of three phase submersible pumpsets (Bore well type) 2 HP to 4
97 HP pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (S.No: 11.3.2 to 8)
Labour charges for erection of three phase submersible pumpsets (Bore well type) 5 HP to 10
98 HP pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (S.No:11.3.10 to 16)
Labour charges for erection of three phase submersible pumpsets (Bore well type) 15 HP
99 pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (S.No: 11.3.17)
Labour charges for erection of three phase submersible pumpsets (Open well) 3 HP to 7.50
100 HP pumpsets including pipe connection for suction and delivery and all labour charges etc.,
complete., (S.No: 11.4.1 to 3)
Labour charges for erection of three phase submersible pumpsets (Open well) 10 HP
101 pumpset including pipe connection for suction and delivery and all labour charges etc.,
complete., ( S.No: 11.4.4)
Total: 1 No 3877.50
Earth work excavation in BC soils, red earth and ordinary gravelly soils for pipe line trench of
size 0.50 x 0.75 Mts using 2/3 quanity with machinery and 1/3 quantity with manual
including laying and jointing of 63 / 75mm dia PVC Kgs/Sqcms true to alignment and testing
103 the pipe line with hydralic field test pressure with water minimum lead of 500mts including
refilling the trench with excavated earth including cost of pipes and all labour charges etc.,
complete., but excluding taxes on PVC pipes etc., complete.,
Quantity Description of the work Rate Per Amount
Earth work excavation in BC soils, red earth and ordinary gravelly soils for pipe line trench of
size 0.70 x 1.00 Mt using 2/3 quanity with machinery and 1/3 quantity with manual including
laying and jointing of 90 / 110mm dia PVC Kgs/Sqcms true to alignment and testing the
104
pipe line with hydralic field test pressure with water minimum lead of 500mts including
refilling the trench with excavated earth including cost of pipes and all labour charges etc.,
complete., but excluding taxes on PVC pipes etc., complete.,
110/ 158
Cost of 90 / 110mm dia PVC Kgs/Sqcms Pipe (90mm) &
1 Rmt 160/229 1 Rmt
(Excluding taxes)
(110mm)
Collection and supply of 16 to 23.60mm HBG M/C metal chips including laying, screening,
106 washing, filling of the metal in filter bed with uniformity including cost and conveyance of all
materials and all labour charges etc., complete.,
107 Removing of sand in filter beds including all labour charges etc., complete.,
Labour charges for laying filters with sand (Roads SSR
1.00 Cum 30.70 1 Cum 30.70
Sl.No: 171, SS Item No: 5 (o))
108
Removing of Coarse agregate in filter beds including all labour charges etc.,
complete.,
LAYING & JOINTING 65MM GI PIPE WITH SPECIALS & WITH OUT EARTH WORK
Laying and jointing of 65mm dia GI "B" Class pipe as per IS 1239 specifications excluding earth
work excavation including cost of pipe and its specials and all labour charges etc., complete.,
109 except GI bends, unions, GI connectors with checkout and socket TATA or ZENITH make or
equivalent.
0.1875 Cum Deduct 75% for narrow trenches excluding seign charges 167.44 1 Cum 31.40
Printing new letters of any shade for name board with synthetic enamyl paint two coats ( ఆం ధ్ర
110 ప్రదేశ్ ప్రభుత్వము ప్రభుత్వ ము, గ్రామీణ నీటి సరఫరా మరియు పారిశుధ్యము శాఖ నీటి సరఫరా మరియు పారిశుధ్యము శాఖ సరఫరా మరియు పారిశుధ్యము శాఖ మరియు పారిశుధ్యము శాఖ పారిశుధ్ర ము శాఖ, సామర!ము: ____ 000 లీటర్లు ఉపరి తల % ఉప్రరి త్వల
జలాశయము, __________________ గ్రామము, ______________ మ డల ము, కర./లు జిల్లా జిలా%)
including cost and conveyance of all materials and all labour charges etc., complete.,
Total : 1 No 1645.00
Construction of 40,000/ 60,000/ 90,000 liters capacity Circular Over Head Service
Reservoir (OHSR) with 12.90 Mts staging with raft foundation for a wind pressure of 185.21
Kg/sqm using Vibrated Reinforced Cement Concrete M 30 Grade design mix and using 20
mm HBG machine crushed metal in the site selected by the department as shown in the
drawings and specification as per the departmental procedure, including earth work
excavation in all kinds of soils in wet or dry conditions except in rock for foundations fitted
with (A) RCC or Aluminium ladder inside 0.60 Mts wide (B) Spiral staircase on the out side
shall be provided up to 200 KL. Above 200 KL capacity dog legged staircase shall be
provided with staircase flight width of 1.0 mts and landing width of 1.20 mts with SS railing
up to 1.0 Mts height (C) Lightening arrestor including conductor and earthing as per IS
3070 earthing extended below the foundation (D) RCC finial ventilators with copper or
stainless steel fly proof mesh (E) DI Man holes of 2 Nos frame and cover of 0.60x0.60 Mts
size (light duty) as per IS specifications (F) Water level indicator of good quality with
ebonite/ copper float of approved pattern - 1 No
(G) The ladder shall be with MS ladder and verticals with HDPE of 10 Kgs/Sqcms shall be
provided for single column OHSR only. (h) Minimum staging for all ELSR/OHSR shall be 10.0
Mts (i) The increase in staging shall be at 1.0 Mt interval. (j) The railing provided to the
gallery and staircase shall be with stainless steel of grade 304 for a height of 1.20 Mts (k)
The dog legged staircase shall be enclosed with brick/CRS wall on three sides and front side
with MS collapsible gate up to 1st brace level from ground level to prevent unauthorized
entry (l) DI swan neck ventilators shall be provided in top dome and slab. (m) The above
rates are exclusive of all inlet, outlet connections and valves. All valves near inlet, out let
and for scour of ELSRs shall be DI Valves of heavy duty confirming to the specification of
SOR item No: 28. (n) Rate inclusive of three coats of epoxy paint Food Grade of best
quality to inner surface of the reservoir including roof dome (o) Two coats of whether
proof emulsion painting for external surfaces, lettering, all required fixtures, pipes, bends,
valves etc., for pipe connections but excluding cost of pipes, bends and valves as per
departmental designs and drawings, cost and conveyance of all materials, centering,
curing, seigniorage, all labour charges and testing the reservoir for water tightness
etc.,complete., for finished item of the work.
Rate for OHSR of 10 Mts staging as per SSR Item No: 44 (90 KL Rate
taken as per interpolation formula) 1 Liter 33.740 25.570 24.085
Add for every meter of staging above 10 Mts, the rate shall be ( 2.90 x 0.10 =
increase by 0.10 paise per litre per every meter of additional in 0.290 0.290 0.290
staging 0.29)
Total litre rate for 12.90 Mts staging VRCC OHSR 34.030 25.860 24.375
The above rate shall be increased/ decreased due to increase/ 34.03 x ((4600-
decrease in the cost of cement by Basic rate x ((Rc-3672) /3672)x 3672)/3672) x 0.602 0.457 0.431
0.07 (Rc = Present cement rate) 0.07
The above rate shall be increased/ decreased due to increase/ 34.03 x ((41500-
decrease in the cost of steel by Basic rate x ((Rs-39000)/39000) x 39000)/39000) x 0.436 0.332 0.312
0.20 (Rs = Present steel rate Fe 500) 0.20
Materials
Pressure guage Nos 0.050
3/4" G.I. Pipe (20 mm) RM 3.000 198.00 594.00
Specials Ls
Dummies No. 0.100 50.00 5.00
Diesel (2 Lts. / Hr) 30 Hrs. Lts. 60.000 79.73 4783.80
(T) Total Rate per 500 Mts. 12237.80
(r) Rate per 1 Rmt for 450 mm dia 24.48
(R) Rate per 1 Rmt for 10 mm dia = (10/450) x 0.5439
r
Note : Proportionate Testing Charges may
be arrived, keeping the diametre of pipe
based on this analysis, for an varities of
pipes for various Dia Pipes.
Total 10581.22
(b) Material
Add for Water charges at 1% on Labour & Lt 105.81
Testing
(c) Overheads & Contractors Profit
(d) Total (a+b+c) 10687.03
Rate per RM =d/500 Rm 21.37
Rate per 10 mm / 1rm 1.34
A All Classes pipes :
i 63 mm dia pipe
Weight of 1m length = (0.468+0.666+1.01)/3
=0.715 kgs
(a) Labour charges for laying, jointing & rm 6.300 1.34 8.42
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
ii 75 mm dia pipe
Weight of 1m length = (0.655+0.923+1.439)/3
=1.005 kgs
(a) Labour charges for laying, jointing & rm 7.500 1.34 10.02
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
iii 90 mm dia pipe
Weight of 1m length = (0.924+1.321+2.032)/3
=1.426 kgs
(a) Labour charges for laying, jointing & rm 9.000 1.34 12.02
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
iv 110 mm dia pipe
Weight of 1m length = (1.323+1.902+3.062)/3
=2.096 kgs
(a) Labour charges for laying, jointing & rm 11.000 1.34 14.69
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
v 125 mm dia pipe
Weight of 1m length = (1.722+2.511+3.929)/3
=2.72 kgs
(a) Labour charges for laying, jointing & rm 12.500 1.34 16.70
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
vi 140 mm dia pipe
Weight of 1m length = (2.144+3.116+4.905)/3
=3.388 kgs
(a) Labour charges for laying, jointing & rm 14.000 1.34 18.70
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
vii 160 mm dia pipe
Weight of 1m length = (2.799+4.012+6.414)/3
=4.408 kgs
(a) Labour charges for laying, jointing & rm 16.000 1.34 21.37
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
viii 180 mm dia pipe
Weight of 1m length = (3.581+5.134+8.092)/3
=5.602 kgs
(a) Labour charges for laying, jointing & rm 18.000 1.34 24.05
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
ix 200 mm dia pipe
Weight of 1m length = (4.331+6.351+10.001)/
3 =6.894 kgs
(a) Labour charges for laying, jointing & rm 20.000 1.34 26.72
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
x 225 mm dia pipe
Weight of 1m length = (5.511+7.975+12.675)/
3 =8.72 kgs
(a) Labour charges for laying, jointing & rm 22.500 1.34 30.06
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
xi 250 mm dia pipe
Weight of 1m length = (6.674+9.886+15.666)/
3 =10.742 kgs
(a) Labour charges for laying, jointing & rm 25.000 1.34 33.40
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
xii 280 mm dia pipe
Weight of 1m length =
(8.453+12.404+19.616)/3 =13.491 kgs
(a) Labour charges for laying, jointing & rm 28.000 1.34 37.40
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
xiii 315 mm dia pipe
Weight of 1m length = (10.682+15.723+24.732)/3
=17.046 kgs
(a) Labour charges for laying, jointing & rm 31.500 1.34 42.08
testing
(b) Overheads & Contractors Profit
Rate per metre a+b
SEIGNIORAGE CHARGES CALCULATION SCHEET
UN AUTHENTICATED
Pointing with CM (1:3) to
18 Rough stone Sand X0.09/10 100.00 1 Sqm
CEMENT CALCULATIONS
Sl.
Name of the item Quantity Unit Cement in Kgs
No.
1 C C (1:5:10) mix using 40mm HBT Metal 0.90x1440/10 1 Cum 129.60 Kgs
2 C C (1:6:10) mix using 40mm HBT Metal 0.90x1440/10 1 Cum 129.60 Kgs
3 C C (1:4:8) mix using 40mm HBT Metal 0.90x1440/8 1 Cum 162 Kgs
4 C C (1:3:6) mix using 40mm HBT Metal 0.90x1440/6 1 Cum 216 Kgs
UN AUTHENTICATED
14 RR Masonry in CM (1:8) 0.33x1440/8 1 Cum 59.40 Kgs
17 C C (1: 1 1/2:3) mix using 20mm HBG 0.90x1440/3 1 Cum 432 Kgs
Metal
WEIGHT OF STEEL
UN AUTHENTICATED
5 L - Beams 1 Cum 160 to 240 Kgs 200 Kgs
UN AUTHENTICATED
SCHEDULE - A
NAME OF THE WORK:- Manufacture, supply, delivery, transportation, erection and commission of 500 LPH UV & RO Plant in Kurnool
District.
The quantities given here on those upon which the lumpsum tender cost of the work is based but they are subject to alterations, ommissions, deductions or
1 additions as provided for in the conditions of the contract and do not necessarily to show the actual quantities of work to be done. Payments of extras or
deductions for omissions according to the conditions of the contract or as set forth in the preliminary specifications.
It is to be expressly understood that the measured work is to be taken nett (not with standing any custom or practice to be contrary) according to the drawings or as
2 may be ordered from time to time by the Executive Engineer and cost calculated by the measurement or weight at the respective prices without any additional
charges for any necessary or contingent works connected there with. The rates quoted are for works in site and completed in every respect.
Manufacture, supply, delivery, installation and commissioning of 500 liters per hour water treatment plant (De-flouride plant) with Reverse Osmosis
Technology including packing, transportation, installation, testing as per DIS standards and all other incidental charges, as per ISI standard
specifications for obtaining quality of treated water as per BIS standards for drinking water in all aspects including cost and conveyance to site of RO
& UV Plant, raw water tank, product water tank (steel tank), pump sets and its accessories, inlet and out let connections where ever necessary,
1
plumbing, electrical connections, attending repairs and defects during warranty period of one year, inclussive of all taxes and VAT etc., complete., for
finished item of work but excluding construction of shelter. The plant should be maintained for one month and to be handed over to Gram Panchayat.
(The rate is approved vide Rc. No: D 10/237/2011 Dated: 07-06-2013 of the Joint Collector, District Purchase Committee, Kurnool subject to conditions
enclosed in the agreement).
It is to be expressly understood that the measured work is to be taken nett (not with standing any custom or practice to be contrary) according to the drawings or as may be
2 ordered from time to time by the Executive Engineer and cost calculated by the measurement or weight at the respective prices without any additional charges for any
necessary or contingent works connected there with. The rates quoted are for works in site and completed in every respect.
Manufacture, supply, delivery, installation and commissioning of 1000 liters per hour water treatment plant (De-flouride plant) with Reverse Osmosis
Technology including packing, transportation, installation, testing as per DIS standards and all other incidental charges, as per ISI standard specifications for
obtaining quality of treated water as per BIS standards for drinking water in all aspects including cost and conveyance to site of RO & UV Plant, raw water
1 tank, product water tank (steel tank), pump sets and its accessories, inlet and out let connections where ever necessary, plumbing, electrical connections,
attending repairs and defects during warranty period of one year, inclussive of all taxes and VAT etc., complete., for finished item of work but excluding
construction of shelter. The plant should be maintained for one month and to be handed over to Gram Panchayat (The rate is approved vide Rc. No: D
10/237/2011 Dated: 07-06-2013 of the Joint Collector, District Purchase Committee, Kurnool subject to conditions enclosed in the agreement).
Here, X1 : 60 KL
X : 90 KL
X2 : 100 KL
Y1 : 25.57
Y : Required
Y2 : 23.59
Y : ((Y2-Y1)*(X-X1) / (X2-X1)) + Y1
: 24.085
1 SOURCE CERTIFICATES:-
(a) Yield Test Certificate:
Certified that the source (Bore well/ Open well) is tested and the Yield is observed ______
LPM against requirement of __________ LPM.
Certified that the source (Bore well/ Open well) is tested and water quality is found
potable as per the test report of Lab Reference No: _______________________ Dated:
_____________.
2 PIPE LINE TEST CERTIFICATE:-
Certified that the Pumping main/ Distribution line with DI/ HDPE/ PVC Class ___________
of _____ dia to a length of _____________ Rmt is tested hydraulically to the required test
pressure of ___________ Kgs/Sqcms and found satisfactory without any leakages.
(b) Trail run certificate (If applicable as per agreement): Certified that the Pump set is
commissioned and trail run period of ___________ days is completed satisfactory.
The work has been completed by _____________ (date) in all respects in accordance with
(a)
the specifications, drawings and terms and conditions of the Agreement and A.P.S.S.
The Contractor/ Agency has engaged Technical personnel/ Key personnel, Viz., Sri.
_________________________ (Technical qualifications to be indicated at the each name)
(b) as technical agents (as in the agreement) throughout the period of execution of the work
and that they were available at the site of work during the course of execution of the work.
No recoveries are due for recovery from the Contractor/ Agency, other than those
( c)
proposed in the bill.
(d) There are no further dues to be recovered from the Contractor/ Agency.
The revised estimate/ completion report is approved by the competent authority duly
( e)
covering all the deviations.
(g) The system has been tested/ subjected to full function/ working condition and no leakages
are found (to be furnished for pipe lines/ reservoirs etc.,)
I do here by release and discharge from any and all claims from any/ all claims and
demands whatsoever for all matters arising out of or/ and in connection with the contract
under this agreement, Agreement No: ______________ Dated: ________ of the SE/ EE/
DEE ______________.
8 7 - F ACCOUNT:-
7 - F Account of materials (If applicable) if any excess materials received and paid to be
proposed for recovery.
9 SEIGNIORAGE CHARGES:-
Over all seigniorage charges to be worked out on right hand side of M Book and signed by
the AEE/ AE/ DEE.
10 TAXES:-
For payment of taxes proof of payment for taxes to be produced.
11 TEST CERTIFICATE OF MATERIALS:-
All test certificate such as M-30 design mix, lab tests for cement, steel, cube tests, pipe QC
certificate and source water quality lab certificates to be enclosed, if not previously
submitted.
PREPARATION OF ESTIMATES:-
1 The date of inspection should be noted in the estimate by the authority according Technical
sanction as per G.O.Ms. No: 402 PWD (Y) Department Dated: 14-05-1973.
2 The estimate should contain the following documents invariably,
Design calculations has to be worked out based on population and the design parameters of
2.1 different components.
2.2 The details of population General, SC, ST and prospective, ultimate demands to be worked out at
1% growth rate.
2.3 For Augmentation or improvements of the SVS Scheme all the existing components to be
indicated and additional requirements to be worked out.
All estimates should have flow diagrams, distribution net work plan, and drawing of each
2.4 component where ever necessary.
2.5 Hydraulic statement/ Eponet/ Economies size of pumping main is be enclosed for pipe lines
where ever necessary.
Loading, unloading and stacking charges have to be deducted from the rate for conveyance of
4 earth in the data as per Govt. Memo. 34975/ Irrgn. III/ 94-2 I&CAD Dept., Dated: 06-07-1994 and
Govt. Memo No: 34975/ Irrgn. III/ 99-4, Dated: 27-12-1995.
The "Head of Account" with full details of Major Head, Minor Head, Sub-head, Sub detailed head
5 etc., to which the expenditure on account of the estimate is to be charged is to be indicated in
the technical sanction of the estimate.
In respect of items for which the rates are not covered in the SSRs, or for the materials, they are
to be adopted based on the rates approved by the competent authority for such items or as per
6 the Rate Contracts concluded by the authorities concerned (for materials) or as per the rates
approved by the District Administration (for drilling of bores/ for cost of pipes etc.,) but the basis
for such provisions as mentioned above is to be mentioned in data of estimates.
Adopt machinery excavation rate for excavation the pipe line trenches in all Project and Scheme
works. Where ever machinery can`t work a certificate must be furnished indicating the length
7 and reaches and their additional payments for manual work can be given. Necessary LS provision
for difference can be made in the estimate as per Circular Memo No: AEE12/ RWS (P)-III/ GNT/
Gen/ 02 Dated: 18-11-2002 of the Chief Engineer, RWS (PR), Hyderabad.
While preparing the estimates to allow 2/3 rd depth to be excavated by the machinery and
balance 1/3 rd depth to be excavated by manual even though the quantity is more than 1000 cum
8 as per Circular Memo No: RWS (Plg)/ T-sec/ Rates/ 2005 Dated: 18-08-2006 of the Engineer-in-
Chief, PR, Hyderabad.
A Revised Estimate/ Work shop is necessary where there is variation compared to the original
estimate, even if it be by way or reduction in the quantities/ by way of substantial variations or in
9 the value of the estimate, etc., because the said +/- variation have to be explained in the revised
estimate/ completion report as the case may be, by the competent authority as per paras 214
and 215 of A.P.P.W, approval for the deviations met with may be obtained from the competent
authority.
Specification report should be clearly indicate the necesity of the provisions made in the estimate
10 and reasons for any deviations proposed.
Date of recording of measurements is not being in some cases by the recording officer (AE/ AEE),
11 below his signature, signature without date is not valid.
Only Metric systems of measurements shall be recorded (Since usage of FPS was dispensed with
13 long back). Mentioning in feet, gallons etc., is dispensed.
All the lines (normally 16/ 17 lines) in a page in M Book shall be used or filled in with the
measurements (on Left Hand Side of page only) and if any lines have to be necessarily left
14 unfilled, then a diagonal line shall be drawn below the signature of the Recording Officer, so as to
ensure check isertion of any measurements below the signature of the Recording Officer.
Where measurements are to be recorded based on levels (e.g., Earth work), the measurements in
such cases shall be recorded in M Books with reference to the levls recorded in L.F. Books through
15 Cross Section sheets and after computation in the calculation statements. Where the
measurements are based on level, L.F. Books, C.S. Book and calculation statements shall
invariably be sent to PAO`s office along with M Book and Bill.
Where measurements are based on trip sheets for transportation of hours of usage for pumping
16 with diesel pump etc., based on DLR sheets. Such trip sheets/ DLR sheets to be signed by
competent authorities to be enclosed with M Book.
In the case of clearence of light jungle (Where pre-measurements are recorded), a certificate to
the effect that `the light jungle has been cleared, removed, burnt and thrown out side the site of
17 work` shuld be recorded on the right page of the pre-measurements after its removal and duly
verified by the Deputy Executive Engineer under his signature.
In the case of scrub jungle (Where pre-measurements are recorded), a certificate to the effect
18 that `the scrub jungle has been cleared, removed, burnt and thrown out side the site of work and
it has no saleable value` shuld be recorded on the right page of the pre-measurements after its
removal and duly verified by the Deputy Executive Engineer under his signature.
In the case of clearence of heavy jungle (Where pre-measurements are recorded), after carrying
out its clearence, a certificate to the effect that `the wood/ other materials have been taken to 7
19 F accounts for the month of _________________ (with details of quantity so taken) shuld be
recorded on the right page of the pre-measurements and duly verified by the DyEE/ EE and
auction to be conducted for such items subsequently.
20 In case of Bore well, the yield should be recorded by AE/ AEE and certified by the Deputy
Executive Engineer.
In case of pump sets, the make, model, Sl. No., Head and duty of Pump as per the Label to be
21 recorded in the M Book. The test certificate should be given as per the Yield on ducted and yield
observed, and to be verified by the Deputy Executive Engineer.
All the item recorded should be visible as on the date of recording and should be Measurable.
22 The items to be dispersed/ refilled/ laid with concrete only after check measurement by the
competent authority.
The items recorded should be as per the measurement done in the field and as in the serial of
23 measurement done. No bulk quantities to be recorded with intermittent calculation on separate
paper.
24 All the items visible at one particular site can be measured at one page and only after closing the
recordings at particular work spot, measurement at second or other site to be recorded.
Pre-measurements for Hard rock should be recorded and after their removal, the quantities of
the removed HR should be recorded by stacks duly deducting voids as prescribed allowances
25 towards compaction, swell factor, etc., with due comparision for allowing payment for the correct
(net) quantity. The rock should be taken in to account for re-use.
If the rock is not use full for any construction purpose and if not stocked, Necessary certificate to
25.1.1 that effect has to be made in right side of the M Book as the rock blasted and removed is found
not use full for reuse for any construction purpose and hence not stacked and the certificte has to
be verified and signed by the Deputy Executive Engineer.
Where variation in classification of soils exceeds +/- 10% the instructions issued in Govt. Memo.
26 No: 1970-K2/72-11, PWD (PW) Dept., 04-07-1974 should be followed and they are briefly
indicated below.
(i) Classification should be check measured by the Executive Engineer in all cases,
(ii) Executive Engineer can approve classification up to +/- 10% in a bay,
(iii) If the variation exceeds +/- 10% in a bay, the classification should be verified by the
Superintending Engineer.
As the rate in the agreement is normally for finished item of the work, care should be taken that
the measurements are recorded only after that item of work is completed for the finished item of
27 work, e.g., in the case of cement involved item of work like concrete laying, it should be ensured
that the requisite curing period is over by the date of recording measurements for that finished
item of the work.
Quantities of trial pits are to be deducted from Earth work quantity, where necessary, and M
28 Books concerned should be made available for checking the same.
Where supply of metal/ gravel and spreading of metal/ gravel are provided distinctly as two
separate items in Schedule `A` of the Agreement, the supplied quantities and spread quantities
29 shall be duly compared (with deduction of due allowances) and it should be ensured that the
payment for the spread quatity, in no case, is in excess of the supplied quantity.
If over all measurements are recorded, deductions towards previously executed/ paid quantities
30 should be shown in detail, to ensure that there is no overlapping of the measurements in excess
payments.
Contra nothing indicating Page No. and M Book No. in which all previous part bills are recorded
31 shall be indicated in red ink on top of Abstract of Bill of the current bill. Similarly, reference to
Page No. and M Book No. in which the current bill is recorded should be noted in red ink on top of
all previous part bills.
Theoretical requirement of materials like cement, steel, shall be furnished for every bill in the M
32 Book, whereever necessary along with details of recovery from the bill. A copy of the same shall
also be enclosed to the bill form for different rates of materials.
32.1 Over - lapping and chairs in steel measurements shall not be allowed for payment.
Overall statement showing details of theoretical consumption of seigniorage materials along with
the seigniorage charges involved at the rates prescribed shall be worked out and recorded in
33
every bill in the M Book for effecting recovery from the bill. A copy of the same shall also be
enclosed to the bill form, duly signed by the Deputy Executive Engineer.
Overall statement showing details of recoveries towards hire charges for any departmental
machinery lent as per the rates concluded in the machinery supplemental agreement/ Main
34 Agreement, for the number of hours/ days/ months use duly recording log extract (relevant part
only) etc., shall be recorded for every bill in the M Book and a copy of the same shall also be
enclosed to the bill form, duly signed by the Deputy Executive Engineer.
35 The abstract bill should contain all the items in the same serial order in which they appear in the
agreement, irrespective of whether the items is covered for payment in the current bill or not.
Break-up of original estimate/ agreement quantities and of excess/ supplemental quantities shall
36 be exhibited separately.
37 The bill to be inevitably contain with value of total work done previous bill made and since last
measurement value.
The part bill submitted should contain quantities for all the componenets completed to the stage
38 of work by the date of presenting the bill. Next bill can contain the items recorded beyond the
date of previous bill submitting date. No back date recordings are allowed.
As set registers to be maintained at Sub Division/ Mandal level for each Mandal. While
39 submitting the final bill of any work details of the Assets created should be noted in the "Assets
Register" and to be uploaded in Water Soft.
Maintenance Registers to be maintained at Mandal/ Sub Division level for each mandal and while
40 submitting final bills of any maintenance work, the details of work to be noted in corresponding
PWS Scheme/ MPWS Scheme/ HP/ Direct Pump.
CHECK MEASUREMENT:-
41 Deputy Executive Engineer shall check measure every item costing more than Rs. 500/-
Executive Engineer shall invariably check measure all works costing Rs. 5.00 lakhs and above
42 covering all the major items not less than 30% of total expenditure incurred.
The Superintendng Engineer shall invariably check measure all works costing Rs. 50.00 lakhs and
43
above at 1/3rd, 2/3rd stage of the work and before final measurements.
Road works costing more than Rs. 10.00 lakhs in all the departments, the Superintending
44 Engineer shall accord metal spreading permission and for works costing up to Rs. 10.00 lakhs, the
Executive Engineer shall accord metal spreading permission.
The check measuring officer shall put his initials on the left side of the `particulars` column in
45 token of his having check measured that line.
It is observed that items like `Test checked`, `verified` are being used by the check measuring
officers to denote check measurement. But these terms are not identified in the APPW `A` code
46 and therefore they shall not be used. Only the corrct term `check measuring` may be used while
recording the check measurements by the Check measuring Officer.
47 Where date of measurement and check-measurement is same, check-measurement are not done
simultaneously shuld be recorded by the Check-measuring Officer at relevant page in M Book.
INSURANCE:-
Works are not being insured, in spite of specific instructions issued by the Government. That all
works shall be got insured soon after conclusion of agreement to safeguard the interest of the
Government. In the event of occurrence of damages to the work and copy of Insurance Policy
48 (attested) shall be enclosed to the bill (first bill). Dispensing with insurance cover for all works of
Engineering department with effect from 05-03-2014 vide G.O.Ms.No: 5 Dated: 05-03-2014 of
Finance (Works&Projects-F7) Department.
The start date up to the end of date of completion plus defect liability period and two years for
48.1 original works or as specified in the agreement extension of time is granted by competent
authority, the insurance should cover such extended period as well as the defect liability period
beyond the extended period.
48.2.1 The Agreement condition celarly stipulates payment for the same under Part-II,
48.2.2 Original stamped receipt towards payments of premier is enclosed (along with a Xerox copy of
Insurance policy duly attested) to the bill duly.
The bill is preferred under Part-II, along with the regular bill for work done and included in the
48.2.3
memo of payments for work done bill.
48.2.4 The amount payable is not more than that provided in the Agreement/ Estimate.
Quality Control check has become mandatory now and the quality control certificate issued by
49 the Quality Control authority concerned shall be enclosed to bills (both part bills and final bills)
and the fact having enclosed the same shall be certified in the M Book and bill form.
50 For Intermediate bills (Part bills) (Only appropriate and applicable certificates are to be
furnished):
50.1 The work is in progress,
The work has been carried out satisfactorily as per the drawings, designs and terms and
50.2 conditions of the agreement,
The Contractor/ agency hs engaged technical personnel/ key personnel, viz., Sri. _______
50.4 (Technical qualifications to be indicated at the end of each name) as Technical Agents (as in the
agreement) throughout the period of execution of the course of execution of the work.
The extension of time is granted up to ________ (date) with necessary liquidated damages/ fine
of Rs. ________ are imposed as per Proceedings No: _________ Dated:___ (ie., of CE/ SE/ EE), out
50.5 of which Rs. ________ was recovered up to previous bill and the balance of Rs. _________ is now
proposed up to recovery in this bill,
51 For final bills: (Only appropriate and applicable certificates are to be furnished)
The work has been completed by ________ (date) in all respects in accordance with the
51.1
specifications, drawings and terms and conditions of the agreement and A.P.S.S.,
The Contractor/ agency hs engaged technical personnel/ key personnel, viz., Sri. _______
(Technical qualifications to be indicated at the end of each name) as Technical Agents (as in the
51.2 agreement) throughout the period of execution of the work and that they were available at the
site of work during the course of execution of the work,
No recoveries are due for recovery from the Contractor/ agency, other than those proposed in
51.3 the bill,
51.4 There are no further dues to be recovered from the Contractor/ agency,
51.5 The Revised Estimate/ Completion report is approved by the competent authority duly covering
all the deviations,
The extension of time is granted up to ________ (date) with necessary liquidated damages/ fine
51.6 of Rs. ________ are imposed as per Proceedings No: _________ Dated:___ (ie., of CE/ SE/ EE), out
of which Rs. ________ is now proposed for recovery in the bill.
The system has been tested/ subjected to full function/ working condition and leakages are found
51.7 (to be furnished for pipe lines/ reservoirs, etc.,)
52.1 For Final Bills:- The Contractor shall furnish `Release and Discharge` Certificate as under (under
the signature of the contractor/ agency),
Release and Discharge Certificate:- "I do here by release and discharge from any and all claims
from any/ all claims and demands whatsoever for all matters arising out of or/ and in Connection
with the contract under this Agreement, Agreement No: __________ Dated: ________ of the SE/
EE ________.
The Signature of the Contractor/ Agency or authorized agent/ power of Attorney - Holder shall be
affixed in the M Books for each set of measurement (With the seal of the Company/ Firm) with
52.2 the endorsements `I accept the Measurements` / `Accepted the measurements` similarly,
signatures shall also be obtained in LF Books, CS Booklets, Calculation statements, which are
treated as adjuncts to M Books.
The powers of according Technical Sanction to estimates (Same as issued earlier vide
G.O.Ms.No: 94 PR&RD (Estt.III) Dept., Dated: 08-03-1999) and also Electrical works as per
53 G.O.Rt. No: 939 Dated: 29-06-2010 of Panchayat Raj & Rural Development (PROGS.II)
Department are:
55 The acceptance of tenders is as follows vide G.O.Ms.No: 133 Dated: 20-11-2004 of the Irrigation
and CAD (PW REFORMS) Department.
By the Deputy Executive Engineer: At Estimated rates/ Below Estimated rates.
By the Executive Engineer: Up to 5% Excess over the Estimated rates.
By the Superintending Engineer: Up to 5% Excess over the Estimated rates.
By the Chief Engineer/ Engineer-in-Chief: Up to 5% Excess over the Estimated rates.
56 Date of commencement/ start date of work is the date of signing the agreement
If Technical agents as prescribed are not employed the recoverey towards non-employment of
57 Technical Agents shall be recovered from the Contractors bills at the rate prescribed/ as given in
the agreement.
58 The Technical Agents target to be employed by the Contractor are as follow for estimate cost of
Rs. 0.50 lakhs to Rs. 1.00 lakh : One ITI Certificate Holder (Civil)
Rs. 1.00 lakhs to Rs. 5.00 lakh : One Diploma Holder (Civil)
Rs. 5.00 lakhs to Rs. 15.00 lakh : One Graduate Engineer or Two Diploma Holders (Civil)
Rs. 15.00 lakh to Rs. 50.00 lakh : One Graduate Engineer and One Diploma Holder (Civil)
Above Rs. 50.00 lakh : Two Graduate Engineers or as specified in the Agreement.
The over leaf page of M Book/ Right Hand Side of 1st Page of M Book should be noted with all
59 the details of work such as Administration sanction, Agreement Number and Date, Agreement
target date, Contractor name, Contract value EMD, FSD paid etc.,