EFFECTIVE CONSTRUCTION SITE SUPERVISOR (CSS)

INTRODUCTION, INSPECTOR OF WORKS (IOW) AND ITP


(CIDB CCD / HRDC CLAIMABLE)

KQR Ver. : 2023 / 05 / 15 KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
1
PROGRAM PEMBANGUNAN KONTRAKTOR SECARA BERTERUSAN
(CONTINUOUS CONTRACTOR DEVELOPMENT)
PROGRAM : EFFECTIVE CONSTRUCTION SITE SUPERVISOR (CSS) – INTRODUCTION, INSPECTOR OF WORKS (IOW) AND ITP
(CIDB CCD / HRDC CLAIMABLE)
LOKASI : ONLINE GOGGLE MEET PENGANJUR : TEMPUA USAHA SDN BHD
http://ezy.la/TUTC2023
TARIKH MULA : 15 / 05 / 2023 TARIKH TAMAT : 15 / 05 / 2023 NAZMI 019 – 777 9661
Bil Nama Peserta Negeri Nama Syarikat Gred Email

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
2
DAY 1 : TENTATIVE PROGRAMME
TIME TITLE OF PRESENTATION
9:00 AM – 10:45 AM INTRODUCTION and COURSE OBJECTIVE
Introduction, Objective and Scope, What is Effective Construction Site Supervisor (CSS)?,
Effective CSS vs. Accredited Inspector of Works (IOW),
How CIDB [Act 520 / Rev 2011 / Sect 33A] helps Stakeholder? Tutorial @ page 31
10:45 AM – 11:00 AM TEA BREAK
11:00 AM – 12:30 PM INSPECTOR OF WORKS (IOW)
How to register as CIDB CSS, BEM / LAM IOW,
Related By-Laws, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020],
Who is Effective CSS and Accredited IOW?, Why we need Effective CSS and Accredited IOW?
Tutorial @ page 62
12:30 PM – 2:00 PM LUNCH BREAK
2:00 PM – 3:45 PM INSPECTION AND TEST PLAN (ITP)
What is Inspection and Test Plan (ITP)?, G Forms as Effective Site Supervisory Tools,
CPC, CCC, DLP and CMGD, Construction 4.0 Strategic Plan (2021 – 2025), Tutorial @ page 118

3:45 PM – 4:00 PM TEA BREAK


4:00 PM – 4:45 PM SESSION 3 CONTINUED
4.45 PM – 5.00 PM Q & A / SURVEY FORM KHAIRUL QUALITY RESOURCES

5.00 PM END
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
3
SESSION 1: INTRODUCTION AND COURSE OBJECTIVE
This Topic Content;
1. Introduction, Objective and Scope,
2. What is Effective Construction Site Supervisor (CSS)?,
3. Effective CSS vs. Accredited Inspector of Works (IOW),
4. How CIDB [Act 520 / Rev 2011 / Sect 33A] helps Stakeholder?
5. Tutorial @ page 29

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
4
INTRODUCTION
Setting up the Common Goals between CCS and IOW;
1. Both Certified CSS and Accredited IOW will improve
project development and test processes when the
product is being developed, by;
a. Progress monitoring and process audits according
to Approved PQP in QMS [MS 9001:2015]
b. Quality Assessment according to QAS [CIS 7:2021]
for the Entire Contract Period
c. Site Occupational, Safety and Health (OSH) Protocol
according to SHASSIC [CIS 10:2020]
2. Quality Control in Project Execution will identify defects
after a product is developed and before it’s released
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
5
INTRODUCTION
What is Effective Construction Site Supervisor (CSS)?
1. Technically competent; 6. Treats individuals with
knows how to build respect and as equals
2. Challenges and critiques 7. Is willing to try new
as well as monitors work ideas on works
IOW
RE, RA 3. Focuses on work 8. Is willing to work as a
production, cost and risk team member to
4. Monitors equipment achieve goals
productivity and usage 9. Puts a high priority on
quality (QAS)
5. Is attentive to timely and and safety (SHE)
accurate record keeping
CSS
(QMS)
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
6
INTRODUCTION
What is Effective Construction Site Supervisor (CSS)?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
7
INTRODUCTION
What is Effective Project Management Planning in CICS?

https://www.cidb.gov.my/wp- KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com 8
content/uploads/2022/10/SYARAT_PENTAULIAHAN_PERSONEL_overall.pdf Phone : 011 – 2896 0889
INTRODUCTION
What is Effective Project Management Planning in CICS?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
9
INTRODUCTION
What is Accredited Inspector of Works (IOW)?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
10
INTRODUCTION
What is Accredited Inspector of Works (IOW)?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
11
INTRODUCTION
What is Accredited Inspector of Works (IOW)?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
12
INTRODUCTION
What is Continuous Professional Development (CPD) Point?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
13
INTRODUCTION
Common Terms and Definitions;
1). Street, Drain and Building Act SDBA 1974 [Act 133] and UBBL 1984
➢ This Act aims to provide a uniform system in Local Authority areas of Malaysia
and sets out rules to regulate the activities relating to street, drainage and
building in those areas
2). Construction Industry Development Board CIDB 1994 [Act 520]
➢ CIDB was established to regulate, develop and facilitate the construction industry
towards achieving global competitiveness.
3). Statutory Board
➢ The Board of Engineers Malaysia (BEM) is a statutory authority founded in 1972
representing the engineering profession in Malaysia.
➢ The Board of Architects Malaysia (BAM) is a statutory authority responsible for
the enforcement of the Architects Act 1967 KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
14
COURSE OBJECTIVES
This course will enable Construction Site Supervisor (CSS);
1. To impart the basic knowledge as Effective CSS based on SDBA 1974 [Act 133],
CIDB 1994 [Act 520] and REA 1967 [Act 138]
2. To get sufficient training as BEM Inspector of Work (IOW) Intern;
➢ Work as subordinate with Accredited IOW and Qualified Person (P. Eng.)
➢ Attend BEM CPD courses and Record yearly CPD point @ myBEM Online
➢ Submission form must be endorsed by BEM Qualified Person (P. Eng. / PEPC)
with sufficient work experience (Diploma @ 2 year and Degree @ 1 year)
before apply as BEM Accredited IOW
3. To generate better understanding for the requirement of Quality System [QMS]
and Quality Assessment [QAS] in construction works.

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889c
15
SCOPE OF CONSTRUCTION SITE SUPERVISOR
Construction Site Supervisor (CSS) is limited to;
1. CSS specific tasks of Preparation, Supervision, Control and Record of QMS
(Quality Manual, Document and Record) and QAS Assessment, with;
➢ Briefing for construction workers before work start
➢ Monitor all construction activities and prepare related document
➢ Preparing Sample for Inspection Test Plan (ITP)
➢ Helping Project Manager for Progress Claim
2. Attending QAQC activities and inspection with the Inspector of Work (IOW)
3. Closing all customer complaints using PQP and approved Method Statement

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
16
SCOPE OF SDBA 1974 [Act 133] and REA 1967 [Act 138]
The Related by Laws is limited to;
1. SDBA 1974 [Act 133] and UBBL 1984 / Part II / By-Laws 5, said,
“ Where under these By-laws any plan, drawing or calculation in relation to any
building is required to be submitted by qualified person, no erection or
continued erection of that building shall take place unless that qualified person
or any person duly authorised by him undertakes the supervision of the
erection and the setting out, where applicable, of that building “.

2. REA 1967 [Act 138 / Sec 7(2) (ab)] said,


“ An Inspector of Works who is registered with the Board may, subject to
section 8, take up employment which requires him to assist the
Professional Engineer in the supervision of engineering works ”

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
17
SCOPE OF CIDB 1994 [Act 520]
CIDB Sijil Kecekapan Kemahiran Pembinaan (SKKP) is limited to;
1. The eligibility requirements for the application and accreditation program for a
Construction Site Supervisor (CSS) are as follows;
➢ Academic Qualification
➢ Years of Experience in related construction field
➢ Fulfil the eligibility requirements for application and accreditation
2. CSS Mode and Assessment processes are as follows;
➢ Undergoing course and sitting for written assessment for each study package
➢ Sitting for written assessment
➢ Submission of working experience document and attending an interview
3. Successful candidates having passed through any mode will be accredited with a
Level 4 or Level 3 CIDB SKKP as appropriate with the accredited Site Supervisor’s
duties and responsibilities
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
18
“DOING THINGS RIGHT THE FIRST TIME AND EVERY TIME”
Dangerous to trust the yesterday’s winning theory;

F01 & F02


for PPK
G4 G5 G6 G7
only

CIDB SKP F01 (5 - 9 Mar 2023) by Ts. Sharif bin Zakaria KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com 19
http://ezy.la/SKPFM01 Phone : 011 – 2896 0889
EFFECTIVE CSS vs. ACCREDITED IOW
Quality Management System QMS [MS 9001:2015];

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
20
EFFECTIVE CSS vs. ACCREDITED IOW
Quality Assessment System QAS [CIS 7:2021];

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
21
EFFECTIVE CSS vs. ACCREDITED IOW
Safety and Health Assessment System SHASSIC [CIS 10:2020]

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
22
EFFECTIVE CSS vs. ACCREDITED IOW
Kick-Start Preliminaries Work for QMS;
1. Study the Key Layout Plan with PM and help
marking Temporary Structure layout
2. Manage material and workers for erecting
Temporary Structure as per approval by PBT
3. Control workers for erecting hoarding, worker
quarters, wash through, fabrication yard, etc.
4. Coordinate the temporary supply to site
5. Record all the activities in the Site Daily Record
6. Preparing material storage, machinery
mobilization and start material delivery
7. Preparing site cabin and record filling system
8. Reporting daily progress with PM and planning for
daily activities
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
23
EFFECTIVE CSS vs. ACCREDITED IOW
Inspection Test Plan (ITP) for QMS and QAS;
1. Inspection material delivery to site with IOW and
prepare material sample as per IOW selection
2. Record the material sample, send to independent
lab for testing with IOW in attendance
3. Record the result of sample testing and proceed
the fabrication work after Consultant approval
4. Check sub-contractor construction plan with Site
copy. Control the fabrication works and progress
5. Inspection fabricated material with IOW and
proceed with proper installation works
6. Inspection pre / post construction works with
IOW, rectify any comment immediately and
proceed with next sequence of works
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
24
EFFECTIVE CSS vs. ACCREDITED IOW
Inspection Test Plan (ITP) for QMS and QAS;
1. ITP for Effective CSS;
a. QA focus on Process Checklists and
Project Audits (Ponding Test)
b. QC focus on Deliverable Reviews and
Testing Process (FLIR Thermal Camera)
2. ITP for Accredited IOW;
a. During QA Inspection, they able to tell
if the deliverable seems acceptable
based on the process used to create it
b. During QC Inspection, they will verify
the parameter needed for accepting
the works or give make good order

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
25
EFFECTIVE CSS vs. ACCREDITED IOW
Inspection Test Plan (ITP) for QMS and QAS;
1. ITP for Effective CSS;
a. QA focus on Process Checklists and
Project Audits (Setting up, Formwork,
Rebar, Casting, Arch. Works)
b. QC focus on Deliverable Reviews and
Testing Process (Alignment and
Evenness for Thread and Risers)
2. ITP for Accredited IOW;
a. During QA Inspection, they able to tell
if the installation is correct based on
other element verification
b. During QC Inspection, they will verify
the quality using QLASSIC Standard
requirement
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
26
EFFECTIVE CSS vs. ACCREDITED IOW
Occupational, Safety and Health (OSH) in Tool Box Meeting;
1. Keep it short and informative
2. Focus on one topic relevant to the work
being done that day or scheduled works that
week
3. Get workers involved by asking questions or
having them demonstrate safe work
practices.
4. Be sure to cover changes to the site or
working conditions.
5. Have employees inspect tools, equipment,
and PPE.
6. Remember that you're trying to encourage
two-way communication as it helps to get
the message across KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
27
HOW CIDB [ACT 520 / 2011 / 33A] HELPS CONTRACTOR
New G Forms Signatory Requirement for Project CCC;

CCPM
CCM
CIMS PM
CCSS
IOW, RE, RA https://cims.cidb.gov.my/pbsearch/Forms/ KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com 28
Ar. , Ir. , Sr. Transactions/search.aspx?opt=N Phone : 011 – 2896 0889
HOW CIDB [ACT 520 / 2011 / 33A] HELPS CONTRACTOR
New G Forms Signatory Requirement for Project CCC;
CSS / CCM / CCPM IOW / RE / RA Ar. / Ir. / Sr.

https://cims.cidb.gov.my/pb
search/Forms/Transactions/
search.aspx?opt=N

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
29
HOW CIDB [ACT 520 / 2011 / 33A] HELPS CONTRACTOR
https://www.megajatiacademy.com/full-course;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
30
TUTORIAL SESSION 1
1). What is Effective Construction Site Supervisor (CSS)?
Ans. ________________________________________________

2). When Site Supervisor become Accredited Inspector of Works?


Ans. ________________________________________________

3). How CIDB [Act 520 / Rev 2011 / Sect 33A] Helps Contractor?
Ans. ________________________________________________

4). Why the Client and PSP must ensure Site Supervisor with CIDB Accreditation as CCSS?
Ans. ________________________________________________

5). Any Question to ask for this Session?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
31
SESSION 2: INSPECTOR OF WORKS (IOW)
This Topic Content;

1. How to register as CIDB CSS, BEM / BAM IOW,


2. Related By-Laws, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020],
3. Who is Effective CSS and Accredited IOW?,
4. Why we need Effective CSS and Accredited IOW?
5. Tutorial @ page 62

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
32
HOW TO REGISTER AS CIDB CSS AND BEM / BAM IOW
Registration as CIDB Construction Site Supervisor (CSS) Level 4;
1. CSS Accreditation Program is made up of five (5) components ;
a. Knowledge and Competent - Site Supervisor who is knowledgeable, competent to facilitate and fulfil
his supervisory works efficiently in meeting the cost, time and quality expected from the project.
b. Safety and Quality – Site Supervisor who upholds the importance of safety culture in the workplace
and ensuring quality deliverables from his services.
c. Effective and Teamwork – Site Supervisor who is able to work independently yet effectively in multi-
disciplinary team for construction industry excellence.
d. Reliable and Communication – Site Supervisor who is reliable, helpful and able to communicate
effectively and contribute his skills for efficient project management.
e. Ethical and Environmental - Site Supervisor who applies the ethical responsibility towards society,
environment and embrace the importance of sustainable development in his profession.

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
33
HOW TO REGISTER AS CIDB CSS AND BEM / BAM IOW
Registration as CIDB Construction Site Supervisor (CSS) Level 4;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
34
HOW TO REGISTER AS CIDB CSS AND BEM / BAM IOW
Registration as Board of Engineers Malaysia (BEM) IOW;
2. It is mandatory for university diploma in engineering graduate to register as
Inspector of Works with BEM if he/she wants to take up employment as an
Inspector of Works (IOW);
a. This is in accordance with section 7(2)(ab) which specified that “an Inspector of Works who is
registered with the Board may, subject to section 8, take up employment which requires him to assist
the Professional Engineer in the supervision of engineering works”
b. An Inspector of Works is a person registered under the Registration of Engineers (Amendment 2015)
REA 1967 [Act 138 / Rev 2015 / Sec 10E].
c. Existing Inspector of Works may register with the Board by completing BEM Declaration Form. The
BEM Declaration Form need to be endorsed by a Professional Engineer (PE) of the Engineering
Consultancy Practices or the employer.

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
35
HOW TO REGISTER AS CIDB CSS AND BEM / BAM IOW
Registration as Board of Engineers Malaysia (BEM) IOW;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
36
HOW TO REGISTER AS CIDB CSS AND BEM / BAM IOW
Registration as Board of Architect Malaysia (BAM) IOW;
3. In accordance with the Architects Act 1967 section 27M & 27N, any person
may apply registration by holds qualification recognize by the Board to be
registered as an Inspector of Works;
a. For any person whom has meet BAM qualification required, The prescribed practical experience is for
a minimum period of two (2) years (104 weeks) which must be obtained prior to the registration as an
Inspector of Works with the Board of Architects Malaysia.
b. For Existing Clerk of Works, the prescribed practical experience is for a minimum period of five (5)
years (260 weeks) which must be obtained prior to the registration as an Inspector of works with the
Board of Architects Malaysia.
c. The Practical Experience Log Book, is to record the practical experience which have been acquired by
the applicant as evidence of meeting the appropriate requirement covering the full scope of basic
Scope of IOW Responsibilities. The Log Book and/or any other evidence, will be examined by the
Examiners to determine the qualification of the applicant. KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
37
HOW TO REGISTER AS CIDB CSS AND BEM / BAM IOW
Registration as Board of Architects Malaysia (BAM) IOW;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
38
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Street, Drain & Building SDBA 1974 [Act 133], 2007 [Act 1286];

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
39
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Uniform Building By-Laws [UBBL 1984, Amendment Dec 2021];

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
40
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Development Process in Relation to Architect Basic Services

[Act 118]

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
41
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
CPC, CCC / VP, DLP Warranty Claim, CMGD, Final Claim;
CPC CCC / VP CMGD FINAL
QLASSIC
CLAIM
DLP 18 MTH

2.5% 2.5% $$$

June Sept
2023 2023 Mar
2025 ???
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
42
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Operasi Penguatkuasaan Bersepadu CIDB / Shah Alam 28 Feb 2023

156 Workers without CIDB Accreditation;


Total Penalty is RM1,560,000
CIDB Act 520 / Rev. 2011 / Section 33A;
Penalty to Worker RM5000 / pax
Penalty to Contractor RM5000 / pax
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
43
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
What is CIDB Accreditation for Personnel and Skilled Workers?
1. Definition - CIDB governs that all construction work requiring skills, must be
carried out by competent worker with CIDB’s Certified Skills Competency (SKKP)
before performing any skill works.

2. CIDB’s Objectives on Akta 520 (Pindaan 2011) Seksyen 33A, are;


a. To produce more skilled local construction personnel
b. To provide systematic and accredited construction skill courses, conducted by professional
trainers with vast industry experience
c. To furnish construction personnel with opportunities to develop and upgrade their skills
from time to time
d. To support the construction industry in achieving competitiveness by producing
competent personnel to utilise state-of-the-art construction technologies
a. To conduct skill competency assessment
b. Personnel who successfully passed the assessment will receive
the CIDB Sijil Kemahiran Kecekapan Pembinaan (SKKP) KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com 44
Phone : 011 – 2896 0889
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Quality Management System QMS [MS 9001:2015];
1. There are multiple reasons for this mandatory
documentation;
a. to provide a better understanding of the
QMS
b. to promote consistency in processes
c. to show proof of achieving goals and
objectives

2. Here’s how to structure your documentation;


a. Quality Manual / Policy
b. Standard Operating Procedures (SOP)
c. Project Quality Plan (PQP), Work
Instructions, Method Statement
d. Records and Forms
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
45
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Quality Management System QMS [MS 9001:2015];
1. Quality Manual – why?
a. Company’s commitment to quality, continual
improvement of its processes and to define
the framework for achieving quality
objectives.
b. This policy should be brief, concise, and often
used for promotional purposes
2. Quality Manual – who / when / where?
a. Document title, table of contents, QMS scope
and exclusions
b. Description of the QMS, information on
version and approval
c. Definition of employee responsibilities and
references to relevant documents and
appendices KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
46
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Quality Management System QMS [MS 9001:2015];
3. Standard Operating Procedure (SOP) – who /
when / where?
a. Document title, its purpose and scope,
responsibilities and authorities
b. Descriptions of all activities, SOP references,
work instructions and records
4. Project Quality Plan (PQP), Work Instructions,
INSPECTION OF COMMISIONING AND QUALITY (ICQ) Method Statement – how?
a. Procedures with more detailed, covering
activities that must be done, the steps to
take and in what order
b. Describe what tools and methods should be
used, and accuracy requirements.

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
47
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Quality Assessment System QAS [CIS 7:2021];

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
48
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
CIS 7:2021 / Annex A / Part 1 : Internal Finishes / Door;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
49
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
QAS [CIS 7:2021] QLASSIC Assessor Training;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
50
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Safety and Health Assessment System SHASSIC [CIS 10:2020];

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
51
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
Safety and Health Assessment System SHASSIC [CIS 10:2020];

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
52
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
CIS 22:2021 Safe Use of Scaffolding in Construction;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
53
RELATED BY LAWS, [MS 9001:2015], [CIS 7:2021] and [CIS 10:2020]
CIS 23:2021 Safe Use of Falsework in Construction;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
54
WHO IS EFFECTIVE CSS AND ACCREDITED IOW?
JKR 203A [REV 1 / 2010];

SAMPLE INSPECTION
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com 55
QUALIFIED AND COMPETENT PERSONNEL Phone : 011 – 2896 0889
WHO IS EFFECTIVE CSS AND ACCREDITED IOW?
JKR 203A [REV 1 / 2010];

CPC INSPECTION KHAIRUL QUALITY RESOURCES

INSPECTION TEST PLAN (ITP) Email : khairulquality@gmail.com


Phone : 011 – 2896 0889
56
WHO IS EFFECTIVE CSS AND ACCREDITED IOW?
JKR 203A [REV 1 / 2010];

DLP WARRANTY CLAIMS

CMGD INSPECTION KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
57
WHO IS EFFECTIVE CSS AND ACCREDITED IOW?
JKR 203A [REV 1 / 2010];

CERTIFIED CONSTRUCTION MANAGER (CCM) L5


CERTIFIED CONSTRUCTION SITE SUPERVISOR (CCSS) L4
QMS [ISO 9001:2015]

SAFETY OFFICER & PERSONNEL KHAIRUL QUALITY RESOURCES


OSHMS [ISO 45001:2015] Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
58
WHY WE NEED EFFECTIVE CSS AND ACCREDITED IOW
CIDB 1994 [Act 520 / Rev 2011 / Sect 33A];
1. Compliance to the requirement of Act 520 as stipulated by Part VII, Section 33A (1)
2. Improved construction site work quality through supervision by a accredited and
competent Construction Site Supervisor
3. Ensuring the Construction Site Supervisor’s competency meets the National
Occupational Skills Standard developed by the industry
4. The accreditation of the Construction Site Supervisor in Malaysia for all
construction personnel/individuals who are involved directly or indirectly in
supervisory duties at construction sites, and who fulfil the eligibility requirements
5. The four (4) mainstream arenas for the Construction Site Supervisor are
Civil & Structure, Buildings & Architecture, Mechanical Works and Electrical Works

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
59
WHY WE NEED EFFECTIVE CSS AND ACCREDITED IOW
REA 1967 [Act 138 / Rev 2015 / Sect 10E & 24A];
1. Compliance by the Certificate of Registration issued to an Inspector of Works (IOW)
shall expire on the 31 December of the third year from the date the certificate of
registration is issued.
2. IOW must renew their IOW registration every 3 years upon payment of RM30.00
and shall submit documentation proof that they have satisfied such conditions as
determined by the Board.
3. The Board may refuse to renew the registration of an Inspector of Works if he/she
has failed to satisfy any conditions as determined by the Board.
4. Every registered IOW shall notify the Register of any change in business address
within three (3) months of the change as specified in Section 14 of REA.

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
60
WHY WE NEED EFFECTIVE CSS AND ACCREDITED IOW
Architect Act 1967 [Act 117 / Rev 2015 / Sect 27M & 27N];
1. Compliance by the Evaluation report shall reveal sound judgement in solving
practical problems and procedures followed by the applicant.
2. IOW shall submit the Report that will assist the Examiner in his assessment as to
whether the applicant is adequately exposed to Professional Practice and is to be
recommended for acceptance to the remainder of the IOW Examination
3. The Board may refuse to renew the registration of an Inspector of Works if he/she
has failed to satisfy any conditions as determined by the Board.
4. IOW who if found by the Disciplinary Committee to have contravened or failed to
comply with any of the provisions of this Act or any rules made thereunder will be
given written reprimand, max fine RM25000, suspension 2 years or cancellation
(Sect 27Q)
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
61
TUTORIAL SESSION 2
1). What is SDBA 1974 [Act 133], CIDB 1994 [Act 520] and REA 1967 [Act 138]?
Ans. ________________________________________________

2). How to register as Inspector of Works with BEM / LAM?


Ans. ________________________________________________

3). Why we need Accredited Inspector of Works?


Ans. ________________________________________________

4). When to submit Continuing Professional Development (CPD) Point?


Ans. ________________________________________________

5). Any Question to ask for this Session?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
62
SESSION 3: INSPECTION AND TEST PLAN (ITP)
This Topic Content;

1. What is Inspection and Test Plan (ITP)?,


2. G Forms as Effective Site Supervisory Tools,
3. CPC, CCC, DLP and CMGD,
4. Construction 4.0 Strategic Plan (2021 – 2025),
5. Tutorial @ page 118

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
63
INSPECTION AND TEST PLAN (ITP)
ITP in Construction
1. Definition - A document that describes the plan for
managing the QAQC of a particular element of the
construction works by providing information on the
requirements, methods to be used, responsibilities of
relevant parties and documentary evidence to be
provided to verify compliance
2. How to write ITP
a. Scope
b. Determine the criteria with QMS Documents,
Drawings, Specs, Standard, Contract
Requirement, Planning Condition, Building
Control Requirement, Building by Law, Sample
and QAS Benchmark.
c. Work out the stages of delivery and Detail
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
64
INSPECTION AND TEST PLAN (ITP)
ITP / JKR / 3rd Edition / 2015 (Version 2) / Earthworks

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
65
INSPECTION AND TEST PLAN (ITP)
ITP / JKR / 3rd Edition / 2015 (Version 2) / Structure Works

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
66
INSPECTION AND TEST PLAN (ITP)
ITP / JKR / 3rd Edition / 2015 (Version 2) / Structure Works

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
67
INSPECTION AND TEST PLAN (ITP)
ITP / JKR / 3rd Edition / 2015 (Version 2) / Architecture Works

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
68
INSPECTION AND TEST PLAN (ITP)
ITP / example Internal Plumbing’s Pressure Test

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
69
INSPECTION AND TEST PLAN (ITP)
ITP / example Waterproofing’s Ponding Test

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
70
INSPECTION AND TEST PLAN (ITP)
ITP / Sanitary Wares & Fittings' Flushing Test

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
71
INSPECTION AND TEST PLAN (ITP)
ITP / CIDB Standard

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
72
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G1 – Earthwork / Kerja Tanah
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Cut and Backfill ✓ CSS to monitor and record
✓ IOW to confirm and verify
b). TOOLS : Pre Comm. Plan,
OGL Plan, Construction Dwg 2. Measure and Analyse

c). RECORD : As Built Drawing 3. Best Practices

3). Best Practices : 4. Control


a). ✓ Standard :
✓ Correspondence : Contractor
b).
G Form Sign by;
(F49)
CCPM, ✓ Signed : SP must be a PEPC
IOW BEM (Civil or Geotechnical)
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
73
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G2 – Setting Out / Pemancangan Tanda
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Traversing, TBM, ✓ CSS to monitor and record
BKL ✓ IOW to confirm and verify
b). TOOLS : Pre Comm. Plan, 2. Measure and Analyse
OGL Plan, JUPEM, Const. Dwg
3. Best Practices
c). RECORD : Setting-Out Dwg
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(F49)
G Form Sign by; ✓ Signed : Licensed Land Surveyor
CCPM,
Licenced Land Surveyor RISM
Ar. BAM / Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
74
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G2 – Setting Out / Pemancangan Tanda

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
75
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G3 – Foundation / Asas Tapak
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Excavation, Piling ✓ CSS to monitor and record
for Pile Cap, Footing, Lift Core ✓ IOW to confirm and verify
b). TOOLS : Setting Out Plan, As 2. Measure and Analyse
Built Dwg, Construction Dwg
3. Best Practices
c). RECORD : Foundation works
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(F49)
G Form Sign by; ✓ Signed : SP must be a PEPC
CCPM, (Civil or Geotechnical)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
76
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G3 – Foundation / Asas Tapak

PDA PILING
TEST WORKS

PILE LOAD
CAP TEST

RESULT
OK
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
77
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G4 – Structure / Struktur
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Pre and Post ✓ CSS to monitor and record
Casting ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, 2. Measure and Analyse
Detail Plan, Sample Test Report
and Approval 3. Best Practices

c). RECORD : ITP, ICQ, NCR


4. Control
✓ Standard :
3). Best Practices : ✓ Correspondence : Contractor
a).
(F49)
b). ✓ Signed : SP must be a PEPC
G Form Sign by; (Civil or Structural)
CCPM,
IOW BEM
Ir. BEM
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
78
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G4 – Structure

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
79
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G5 – Internal Water Plumbing / Perpaipan Air Dalaman
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(SPAN)
G Form Sign by; ✓ Signed : SP must be a PEPC
Plumber SPAN (Mechanical or Civil)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
80
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G6 – Internal Sanitary Plumbing / Perpaipan Kebersihan Dalaman
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(SPAN)
G Form Sign by; ✓ Signed : SP must be a PEPC
Plumber SPAN (Mechanical or Civil)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
81
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G7 – Internal Electrical / Elektrik Dalaman
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(EC)
G Form Sign by; ✓ Signed : SP must be a PEPC
Electrician EC (Electrical /
IOW BEM Energy / Comm.)
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
82
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G8 – Passive Fire / Seni Bina (CCC BOMBA Final Inspection)
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Party Wall, ✓ CSS to monitor and record
Material, Installation, ✓ IOW to confirm and verify
Workmanship
2. Measure and Analyse
b). TOOLS : Const. Dwg, Detail
Plan, Sample Test Result and 3. Best Practices
Approval
4. Control
c). RECORD : ITP, ICQ, NCR ✓ Standard :
✓ Correspondence : Contractor
3). Best Practices :
a).
(F49)
✓ Signed : SP must be a PEPC
b). (Civil)
G Form Sign by;
CCPM,
IOW BEM
Ar. BAM / Ir. BEM KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
83
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G8 – Passive Fire / Seni Bina (CCC BOMBA Final Inspection)

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
84
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G9 – Active Fire / M&E (CCC BOMBA Final Inspection)
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Party Wall, ✓ CSS to monitor and record
Material, Installation, ✓ IOW to confirm and verify
Workmanship
2. Measure and Analyse
b). TOOLS : Const. Dwg, Detail
Plan, Sample Test Result and 3. Best Practices
Approval
4. Control
c). RECORD : ITP, ICQ, NCR ✓ Standard :
✓ Correspondence : Contractor
3). Best Practices :
a).
(F49)
✓ Signed : SP must be a PEPC
b). (Mechanical)
G Form Sign by;
Contractor M&E BOMBA
IOW BEM
Ir. BEM KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
85
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G9 – Active Fire / M&E (CCC BOMBA Final Inspection)

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
86
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G10 – Mechanical Ventilation / Pengudaraan Mekanikal
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(F49)
G Form Sign by; ✓ Signed : SP must be a PEPC
Contractor M&E (Mechanical)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
87
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G11 – Lifts / Escalators (CCC JKKP Final Inspection)
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(JKKP)
G Form Sign by; ✓ Signed : SP must be a PEPC
Contractor DOSH (Mechanical or
IOW BEM Electrical)
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
88
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G11 – Lifts / Escalators (CCC JKKP Final Inspection)

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
89
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G12 – Building / Bangunan
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : CCPM & IOW
b).
✓ Signed : PSP must be a BAM /
G Form Sign by; BEM
CCPM, (Architect / PEPC Civil)
IOW BEM
Ar. BAM / Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
90
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G13 – External Water Supply (CCC SAJ Final Inspection)
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(SPAN)
G Form Sign by; ✓ Signed : SP must be a PEPC
Plumber SPAN (Civil)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
91
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G13 – External Water Supply (CCC Water Utilities Final Inspection)

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
92
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G14 – Sewerage Reticulation (CCC IWK Final Inspection)
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(SPAN)
G Form Sign by; ✓ Signed : SP must be a PEPC
Contractor IWK (Civil)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
93
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G14 – Sewerage Reticulation (CCC IWK Final Inspection)

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
94
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G15 – Sewerage Treatment Plant (CCC IWK Final Inspection)
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(SPAN)
G Form Sign by; ✓ Signed : SP must be a PEPC
Contractor SPAN (Civil)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
95
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G15 – Sewerage Treatment Plant (CCC IWK Final Inspection)

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
96
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G16 – External Electrical (CCC TNB Final Inspection)
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(EC)
G Form Sign by; ✓ Signed : SP must be a PEPC
Electrician EC (Electrical)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
97
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G16 – External Electrical (CCC TNB Final Inspection)
TNB Pre-commissioning Inspection
and Testing (PIAT) Checklist

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
98
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G17 – Road and Drain (CCC PBT Final Inspection)
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(F49)
G Form Sign by; ✓ Signed : SP must be a PEPC
CCPM, (Civil)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
99
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G17 – Road and Drain (CCC PBT Final Inspection)
Specs : JKR/SPJ/2008

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
100
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G18 – Street Lighting
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(EC)
G Form Sign by; ✓ Signed : SP must be a PEPC
Electrician EC (Electrical)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
101
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G19 – External Main Drain
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(F49)
G Form Sign by; ✓ Signed : SP must be a PEPC
CCPM, (Civil)
IOW BEM
Ir. BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
102
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G20 – Telecommunication
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence : Contractor
b).
(F49)
G Form Sign by; ✓ Signed : SP must be a PEPC
Contractor EC (Electrical)
Contractor MCMC
IOW BEM
Ir. BEM
KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
103
G FORMS AS EFFECTIVE SITE SUPERVISORY TOOLS
G21 – Landscape / Pandangan Darat
1. Define Quality Standard benchmark
2). Measure and Analyse :
a). CHECK : Material, ✓ CSS to monitor and record
Installation, Workmanship ✓ IOW to confirm and verify
b). TOOLS : Const. Dwg, Detail 2. Measure and Analyse
Plan, Sample Approval
3. Best Practices
c). RECORD : ITP, ICQ, NCR
4. Control
3). Best Practices : ✓ Standard :
a). ✓ Correspondence :
b).
✓ Signed : SP must be a BAM
G Form Sign by; (Landscape Architect)
Contractor
IOW BEM
Ar. BAM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
104
CPC, CCC / VP, DLP and CMGD
Landed Housing Development Process

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
105
CPC, CCC / VP, DLP and CMGD
Inspection of Commissioning and Qualification (ICQ);
1). Certificate of Practical Completion (CPC)
➢ When the Architect is satisfy with all the physical works being completed in the building
with all the supporting documents from all relevant authority for the application of
Certificate of Fitness (CF) submitted by Contractor
➢ Contractor will be able to claim for the release of 1st half – the 2.5% of the 5% retention
sum from Developer

2). Certificate of Fitness for Occupation (CFO)


➢ Upon submission of Borang E, the Local Authority will have to reply within 14 days,
whether to accept or reject the application of CFO

3). Vacant Possession (VP)


➢ Approval Letter Issued by Local Authority for Certificate of Fitness for Occupation (CFO).
➢ The Developer can hand over key to Owner and thus start the countdown of Defect
Liabilities Period (DLP). KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
106
CPC, CCC / VP, DLP and CMGD
CPC Issuance – Test and Commissioning (T&C)
2). Measure and Analyse :
a). CHECK : Test and
Commisioning

b). TOOLS : QLASSIC Tool Set

c). RECORD : CPC Final


Inspection Punchlists

3). Best Practices :


a).

b).
G Form Sign by;
Principal Submitting Person PSP
Ar. BAM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
107
CPC, CCC / VP, DLP and CMGD
CCC Final Inspection by Regulator Authorities;
4). Certificate of Completion and Compliance (CCC)
➢ Principal Submitting Person (PSP) main tasks are to submitting plans to Local Authority for
KM Approval and Borang G comprise a 21-stage certification required for completion
throughout the project.
➢ Surat Sokongan from essential services (TNB, SAJ, IWK, R&D, Bomba) are required before
PSP can submit Borang F and notification of completion of building. With the new CCC
process, VP can be issued simultaneously at the point of CCC approval.
➢ Stage 6 : Deposit all CCC Document to OSC 3.0 Plus and LAM / BEM
i. Why : F/F1 Form Issuance by PSP
ii. When : Within 14 Days after F/F1 Form Issuance
iii. How : All Document (G Forms, Endorsement Letters and F/F1 Form)
iv. CCC Digital Certificate : Will be issued by BAM / BEM

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
108
CPC, CCC / VP, DLP and CMGD
CCC Issuance – F Form, All G Forms and Endorsement Letters

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
109
CPC, CCC / VP, DLP and CMGD
DLP Warranty Claims;
5). Defect Liability Period (DLP)
➢ It is the only time the Developer can lay claim to any unfinished, defective and substandard
quality to be rectified by the Contractor at the contractor’s own expense

➢ Usually, subject to the contract, a material stock of between 10 per cent and 15 per cent is
to be acquired from the main contractor in respect to tiles, granite, marble, door locks and
handles, manual call point and paints.

➢ Under Housing Development Act (HAD) Malaysia, the DLP is 24 months, starting from the
date you receive your keys (VP). Within this period, the homeowner will need to check for
any damage, defects, as well as poor or faulty workmanship.

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
110
CPC, CCC / VP, DLP and CMGD
Common Terms and Definitions;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
111
CPC, CCC / VP, DLP and CMGD
Defect Schedule CMGD and Final Claim;
6). Certificate of Making Good Defects (CMGD)
➢ At the end of the DLP, the Superintendent Officer (S.O.) will prepares a schedule of defects,
listing those defects that have not yet been rectified, and agrees with the contractor the
date (max within 3 month) by which they will be rectified and at the contractor's cost.

➢ When the S.O. considers that all items on the schedule of defects have been made good,
they issue the CMGD. This has the effect of releasing the remainder of any retention
(balance 2.5%) and brings about issuing of the final certificate.

➢ The Contractor must submit Final Claim with all supporting documents (within 3 month)
after received the CMGD from S.O. The S.O. with the process of calculating and agreeing
any adjustments to the contract sum, will prepare the Final Account and release the Final
Certificate to the Contractor

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
112
CPC, CCC / VP, DLP and CMGD
CMGD Issuance + 2.5% Retention Sum with Penultimate Payment
2). Measure and Analyse :
a). CHECK : Defect Schedule

b). TOOLS : QLASSIC Tool Set

c). RECORD : Final Claim

3). Best Practices :


a).

b).
CMGD Sign by;
Principal Submitting Person PSP
Ar. BAM

Once CMGD release, its


activated Clause for releasing
10% Performance Bond and
due payment KHAIRUL QUALITY RESOURCES
Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
113
CONSTRUCTION 4.0 STRATEGIC PLAN (2021 – 2025)
Gearing Up for the Fourth Industrial Revolution;
The Star Rating as Capacity Insight;
Capacity in BONDING
OPPORTUNITIES!
By implementing

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
114
CONSTRUCTION 4.0 STRATEGIC PLAN (2021 – 2025)
Gearing Up for the Fourth Industrial Revolution;
The Star Rating as Capability Insight;
Capability in STEP UP
OPPORTUNITIES!
By implementing

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
115
CONSTRUCTION 4.0 STRATEGIC PLAN (2021 – 2025)
Gearing Up for the Fourth Industrial Revolution;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
116
CONSTRUCTION 4.0 STRATEGIC PLAN (2021 – 2025)
Gearing Up for the Fourth Industrial Revolution;

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
117
TUTORIAL SESSION 3
1). What is Inspection Test Plan (ITP) in Quality Assurance (QA) and Quality Control (QC)?
Ans. ________________________________________________

2). When to prepare G Forms and validate works completion for CCC Final Inspection?
Ans. ________________________________________________

3). Which G Forms with Final Inspection for Surat Sokongan before complete as 21 nos. G Forms?
Ans. ________________________________________________

4). Why Risks and Opportunities can built up Effective Construction Site Supervisors?
Ans. ________________________________________________

5). Any Question to ask for this Session?

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
118
COURSE REFLECTION

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
119
TERIMA KASIH
Semoga Perkongsian ini memberikan Manfaat Keberkatan

Daripada Abu Hurairah R.A, bahawa Rasulullah SAW telah bersabda:


ُ‫عو لَه‬
ُ ‫ح يَ ْد‬ َ ‫اريَ ٍة أَ ْو ِع ْل ٍم يُ ْنتَفَ ُع ِب ِه أَ ْو َولَ ٍد‬
ٍ ‫صا ِل‬ َ ‫ع َملُهُ ِإالَّ ِم ْن ثَالَث َ ٍة ِإالَّ ِم ْن‬
ِ ‫ص َدقَ ٍة َج‬ َ ُ‫ع ْنه‬ َ َ‫ان ا ْنق‬
َ ‫ط َع‬ ُ ‫س‬َ ‫اإل ْن‬
ِ ‫ات‬َ ‫ِإ َذا َم‬
Maksudnya: “Apabila mati seorang manusia, terputuslah daripadanya amalannya
kecuali tiga perkara: Sedekah jariah atau ilmu yang dimanfaatkan dengannya atau
anak yang soleh yang mendoakan baginya."

Riwayat Muslim (1631), al-Nasa’i (3651), al-Tirmizi (1376) dan Abu Daud (2880)

KHAIRUL QUALITY RESOURCES


Email : khairulquality@gmail.com
Phone : 011 – 2896 0889
120