To be more proactive to production crew for advising to correct the activities this could lead to
non-conformance.
Preparing RFMIs, INRs and responsible for making joint inspection with the consultant for completed
work.
Identified, analyze, and resolved problems and issues with quality assurance and control for site
construction.
Supervision and inspection of façade work according to the approved drawings and standards.
Monitoring of contractor’s construction operation, safety, environmental requirements, and quality.
Ensure all work is done by QCS Standards.
Report to the QA/QC/Project Manager and monitor all activities related to Quality.
Conduct internal training to Lab skilled works, on-site, to record for further improvements.
Monitoring all QA/QC activities and maintaining records accordingly.
Planning the sequence of work & generated Monthly, Weekly, and daily planning & monitoring the
progress of work at regular intervals.
Co-ordinate with Material, lab Engineer, Internal Quality Auditors as and when required by Site
Engineer, Project QC Manager.
Responsible for reviewing all shop drawings, design proposals & method statements to provide information
relating to the construction.
Check variance in form and quality of work to advise corrective measures.
Maintain proper and complete communication with the client’s site discipline engineers on all project
related issues.
Aiding & providing the daily work progress to the QC Manager.
Organize weekly progress and technical meetings with Project Manager & Consultants.
Coordinate with the consultant’s representative and Site In charge for inspection.