You are on page 1of 6

Vipin Pandey,

vipinpandey2111@gmail.com,
09582756814.
RESUME

Objective:

To contribute significantly in the growth process of company by assuming a responsible


and challenging position in the field of Civil Engineering, Project Management, Construction
management and Occupational Safety, Health & Environment with an organization of
repute which values integrity and provides opportunities to grow with growth of
organization.

Summary of Work Experience, Knowledge and Skills:

Having more than 29 years of rich work experience in Construction & Project
Management, Construction Safety, Health & environment and allied works; having
excellent Project management skills. Executed many projects start to end and
experienced whole project cycle.
 Construction of Elevated Metro Project with 6.1 Km elevated viaduct including 06
stations.
 Construction of Elevated Metro Project with 4.6 Km elevated viaduct including 04
stations.
 Construction of G+ 34 High-rise tower with aluminum form work.
 Construction of 500 bedded hospital & Govt medical college.
 Construction of Shopping Mall & multiplex.
 Construction of 5-Star Hotel.
 Construction of multistoried Residential buildings.
 Construction of Industrial Structures and Buildings.
 Project Management.
 Preparation of project cost to completion, monitoring the project as per CTC and
schedule. Planned, plan the project in MSP, Controlling of project through optimum
utilization of man & material and other resources, identification of Project Risk
assessment,
 Development of ‘Safety Culture’ by providing Safety Awareness and Motivational
Training.

EDUCATIONAL AND OTHER QUALIFICATIONS:

 B.E. (Civil) from University of Poona.(1994) .


 M.B.A. from Sikkim Manipal University of Health, Medical & Technological
science.(2006)
 Fellow Member of Institution of Value’s, New Delhi.
 Post Diploma in Industrial Safety from Regional Labour Institute (RLI),
Kanpur.(2007)

Computer Skills: AutoCAD, MICROSOFT OFFICE, Microsoft project planning.

Work Experience:

1. Working as a Project Head in KEC International Ltd.


From 01st June 23 to till date.

“DC -01 Part Design & construction of elevated Viaduct, Elevated Ramp, siding
Line and ten elevated stations Viz. Keshopur, Paschim
Vihar ,Peeragari ,Mangolpuri, West Enclave, Puspanjali, Deepali Chowk,
Madhuban chowk, Prashant Vihar & North Pritampura (Excluding
Architecture & Finishing works of stations, Steel FOB & PEB works) from
chainage 2831.235 to 15206.166 mtrs) of Janakpuri to R.K Ashram corridor of
Phase IV of Delhi MRTS”.

Major responsibilities are -

1. Managing & Control over all project from start to end as project Head.
2. Head and coordinate the whole project team and create efficient work
environment to deliver the project the project with optimum utilization of
resources.
3. Close coordination with DMRC for all related issues and attending all Meetings
up to DW/CPM/PM levels.
4. Effectively managing Casting Yard & elevated Viaduct (I.e. Launching of
Segments with related activities, launching of girders at stations with proper
sequencing ,Piles, Pile cap, Pier, Pier Cap, Parapets launching, POT PTFE
bearings, Elastomeric Bearings and effective working knowledge of machineries
using I.e. LG , Gantries, Cranes Etc.)
5. Complete sequential planning step by step to deliver the project effectively in
cost and time line.
6. Complete coordination with client and resolve the issue on day to day basis.
7. Documentation and execution of projects, actively participating in all phases of
the project. Identify access and manage risks to the success of the project. Ensure
that delivered systems are implemented within these criteria.
8. Estimating, costs, timescales and resource requirements for the successful
completion
9. Preparing and maintain project and quality plans and track activities against the
plan, providing regular and accurate reports as appropriate.
10. Monitoring costs, timescales and resources used, and take action where these
deviate from planned.
11. Providing effective leadership to the project team ensuring that team members
are motivated and of each activity. Developing their skills and experience
12. Managing the client interactions and are responsible for managing all
interactions and close coordination with interface/System contractors to
achieve the desired goal.
13. Project Planning in MSP, Monitoring /executing as per MSP,
Scheduling ,preparation of project Cost to completion , Preparation of Budgeting
(total and monthly), Daily project monitoring & controlling, Preparation of
monthly-weekly-daily progress reports, Preparing of monthly presentation,
Material reconciliation, day to day material
requirement/procurement ,Complete project execution with project team ,Co-
ordination with Clint ,Submission of Clint bill, PC bills, Suppliers bills, checking of
store/stock legers, material requisitions, checking of BBS, quality control,
resolving the site issues day to day basis, ensure safety culture at site.

2. Worked as a Project Director/ Project Head in IL&FS Engineering and


Construction Co Ltd. : From 17 Feb-14 to 31 May 23.

 Construction of Elevated viaduct Corridor from Convention Centre to P5 (4.0 Km


viaduct including 4 stations) at Surat Metro under GMRCL.

 Construction of Viaduct Corridor from Interface Point with Gyaspur Depot, that is,
Abutment of Depot to APMC Metro Rail Station to Shreyas Metro-Rail station all
inclusive of elevated Via-duct portion from chainage (-) 1374.50 to (+) 3246.50 m
and Elevated Metro Stations (Four Numbers) Viz. APMC, Jivraj, Rajivnagar and
Shreyas for Package-1 of North-South Corridor for Ahmedabad Metro Rail Project
Phase-1.

 Construction of Palm Terraces Select Project. Sector 66 Gurgaon as a Project


Head
 Construction Of Villa Marbella Project, Sector 66 Gurgaon. as a Project Head
 Construction of Ireo Gurgaon Hills. as a Project Head
 Construction of Aanand Vilas Sector 81, Faridabad. as a Project Head

1. Worked as a Sr Project Manager in B.E.BILLIMORIA & CO LTD. Ireo victory valley


project , Gurgaon. (From 1st Nov 11 to 15-FEB-14) Construction of tower of G+34
Storied ,two tower G+7 ,Two towers G+3 and three duplex .Total construction area
of the project is nearly 78000 m2.Total project cost is around 100 Crs ,with nearly
38000cum concrete,5700 MT steel .Construction of tower structure with aluminum
formwork which repeat the slab cycle between 10 to 15 days with high level quality
and safety standard.

2. Worked as a Project Manager in Omaxe Infrastructure & Construction Ltd. (from


1st July 09 to 30th Oct 2011) Construction of 500 bedded Govt Hospital & medical
college building at Saharanpur, U.P. Medical college is spreaded in over 62 acres of
land and cost of Rs 491 Cr tender job under the control of UPRNN (Govt of U.P).
4. Worked as a Dy Project Manager in BEBANCO NORTHERN CONTRACTS LTD.
(A Subsidiary of B.E.BILLIMORIA & CO LTD, MUMBAI)– (from 29 Oct 07 to 30 TH
march 09) Construction of multiplex complex which has a Mall , multiplex, Casting
around 100Cr located at Lucknow. Having a 3 level basement parking, 6 stories
retail shop Total 5.5 lakhs Sqft construction area. With high level and new concept of
structural design (flat and post tensioning based slabs),using RMC Concrete.

5. Worked as Sr Engineer – (Civil and Safety) with CERULEAN CHEMICALS PVT LTD,
Kanpur, from 15.12.05. to 24-07-07. I was worked with cerulean chemicals pvt ltd
as a Sr Engineer (civil & safety), the company produces Basic chromium sulphide
which is used in leather industries. The product is very hazardous and the crome
ulceration is listed as a occupational disease in factory act 1948. Here I am
responsible for their construction of new administrative building & maintenance of
old buildings and also looking the safety of the organization. Here I am responsible
for monitoring the work environment by the various methods, carried out the
internal safety audits, investigation of accidents, audit the work permit system,
hazard identification, conduct the various training programme, control of noise
pollution, control of environmental pollution, fire prevention and control, find out
the occupational disease. Maintain the record of all types of accidents and calculate
the time lost and find out the direct and indirect cost of accident. Including
negotiations with contractors, measurements, billings, co-ordination with architect
etc.

6. Worked as Project Engineer with ANSAL, New Delhi from 05.12.2000 to


07.11.2005. Constructed twin G+ 13 storied building at Susant Lok at Gurgoan total
156 flats in both the towers. A 6 flats on each floor .(3 nos 2 bed room flat and 3 nos
of 3 bed room flats) constructed area nearly 395000 Sqft.these towers was
constructed over raft foundation and identical flats in each story. All the structural
work completed in record estimated time with rich internal and external
specification .In internal specification Marble flooring in rooms, pop punning in
walls & ceiling, pop cornice and molding and designer toilets with plumbing and
sanitary fittings . Kota and marble combination in common passage, granite wall
cladding in lift area. Viniratex (Madrasi Dana) in external walls in elevation.
Execution of electrical conduting, wiring, DB, JB, Panels, fittings etc. including
activity Planning, Billing, dealing with contractors.
Construction of Ansal’s shopping Arcade at Susant Lok, with nearly 720 shops in five
wings. About 294400 Sqft construction area. There was 5 wings and I was the
Engineer-in charge of 2 wings and executed the structure and finished the arcade in
schedule time.

Construction of independent row housing (Duplex) at Susant lok ,gurgaon.

7. Worked as Sr. Field Engineer with JAYPEE Hotels Ltd, AGRA. from 09.06.1997 to
30.11.2000. Constructed JAYPEE Palace Hotel at Fatehabad Road, Agra .It was a 174
Cr. 5 -Star Hotel cum International Conventional Center. Spread over 25 acres of
land. with 350 suits, two garden courts (Mughal court and Oval court), one
swimming pool, gymnasium with sauna and Jacuzzi bath, one presidential suit
which views the Taj Mahal, 6 restaurants, lounge, reception etc. where I worked as a
Sr. field engineer and In- charge of 200 suits including the presidential suit, one link
bridge, one Mughal court and various water bodies. I executed various types of
designer floorings and wall cladding with Marble, Granite, Yellow Jaiselmer, Kota,
Udaipur green stones. Various types of false ceiling like wooden and aluminum
framed plaster of Paris (gypsum powder). POP punning in walls and ceiling,
designer cornice and moldings in walls, high textured paintings, wood wok in
vestibule areas, designer doors & window and designer toilets attached with suits
plumbing and sanitary fittings and many more. I also executed electrical conduting,
distribution box, junction box, AC ducting, fan coil units (F.C.U), air handling units
(A.H.U), fire alarm system, smoke detectors, sprinklers, lifts, lightings and
landscaping.

8. Worked as Site Engineer with R.D.S Project Limited, New Delhi from 01.05.1994
to 31.05.1997. Constructed HQ of D.G.B.R at Narayana Delhi. It was a prestigious
project of military engineer services costing around Rs 9.39 Crores . The building is
in diamond shape with Basement +3 storied situated on the small mount and
construction area approx. 3,68,500 Sqft. The complete layout of the building was
given by me with the help of theodolite. It was constructed over raft foundation
framed structure with rich specifications. High standard finishing with marble, Kota
stone flooring and plastic painting in walls.

Construction of C.R.F workshop at Lodhi road, New Delhi.

Personal Profile

Name : Vipin Pandey.

Father’s Name : Shri J.P. Pandey

Age : 54, Years

Present Address : D-14 S.F, Rosewood city, sector 49,Gurgaon.

Permanent Address : 406, H-2 Block, Kidwai Nagar, Kanpur-11

Contact Nos. : 09582756814, 8826396985.

Salary drawn : 43.00 lakhs per Annum, House & Car.

Salary Expected : Negotiable.

Notice period : 90 Days. (Negotiable)


Current location : Delhi.

Preferred location : Gurgaon.

Passport no : G 4257500 DT 01-08-07

DATE :
PLACE: Delhi .

Yours truly,

Vipin Pandey.

You might also like