LIST OF EQUIPMENTS/TOOLS/MATERIALS NEEDED FOR THE AREA 5 PROJECT

PHRC/TCM AREA 5 CIVIL WORKS


QUANTITY
S/N MATERIALS Unit REMARKS
OF ITEMS
1 Plywood boards Pcs 5
2 16A double socket No 1
3 8mm rebars Length 15
4 12mm rebars Length 6
5 Electric wood sawing machine No 1
6 Nail 3" lbs 5
7 Nail 2" lbs 3
8 Nail 4" lbs 5
9 Chippings Tons 10

Note: I have previously sent request for rebars and chippings

27/06/2023

Requested by: Engr. Edum Martins Timothy