BILL OF MATERIALS
Materials And Estimated Quantities
Item To Be Estimated Calculations Required
pieces roll

ELECTRICAL
Duplex Convenient Outlet 8
Air conditioning Unit Outlet 1
Single Gang Switch 4
Double Gang Switch 2
Three Way Switch 3
Fuse Box 1
AWG No.14 (1.5mm) Wire 2

PLUMBING
Total Length = 5.50+10+4= 19.5m
No. of pieces=
½ “ø PVC @ 6m 19.5 4
=3.25 ≈ 4 pcs
6
½ “ø Bent Pipe 16
Total Length = 5.50+6.4= 11.9m
2”ø PVC @ 6m 11.9 2
No. of pieces= =1.98 ≈ 2 pcs
6
2”ø Bent Pipe 14
Total Length = 8.1+10=18.1m
3”ø PVC @ 6m 18.1 4
No. of pieces= =3.02≈ 4 pcs
6
3”ø Bent Pipe 9
Total Length = 10m
4”ø PVC @ 6m 10 2
No. of pieces= =1.67 ≈ 2 pcs
6
Shower Head 2
Floor Drain 3
Lavatory 2
Kitchen Sink 1
Water Closet 2
Faucet 4