What are the responsibilities of a Manufacturer of a completed pressure


vessel regarding Manufacturer’s Partial Data Reports for furnished parts?

Working together
for a safer world
Scenario

• For a complex pressure vessel (PV) a Certificate Holder (CH) is being provided with parts
certified by U-2 forms for built in tubes and heads.
CH A Manufacturer (Mfr) of the shell and the
completed PV (Form U-1)

CH B Mfr of the inserted tubes and


purchaser of the completed PV
from CH A (Form U-2 & U-4)
N1

CH C Mfr of heads (Form U-2A)


N2

Lloyd’s Register Energy


Szenario

U-2 forms for the tubes issued by CH B


• What if only nozzles N1 and N2 are shown, because CH B claims the primary function of
the remaining tubes is the transport of fluids and theerfore not within scope with respect
to U-1(c)(2)(d)?
• What if no statement is made regarding design functions with respect to UG-120(c)?
• What if not all welded parts (nozzles, flanges, etc.) are included?

SS 250 psi

N1

N2 TS 400 psi

Lloyd’s Register Energy


Szenario

U-2A Forms for the Headers by CH C


• What if units of measurements are not consistent with the U-1 Form?
• What if font size is not iaw National Board requirements?

SS 250 psi

N1

N2 TS 400 psi

Lloyd’s Register Energy


Questions

• Is the CH of the completed PV responsible for the accuracy of U-2 Forms of


parts built in his PV, but certified by other CH?

• Is the AI of the completed PV responsible for the accuracy of the content of


U-2 Forms of parts incorporated into his PV, but certified by another AI?

• Does the AI of the completed PV have to accept the U-2 Forms of parts
incorporated into his PV, but certified by another AI, based on being duly
signed and properly identified, e.g. by S/N?

• If the U-1 Form is to be registered with the National Board, is the CH of the
completed PV responsible for the font size of U-2 Forms?

Lloyd’s Register Energy


References in ASME BPVC Section VIII Division 1

• UG-120(c)
Data Reports for pressure vessel parts … shall be forwarded, in duplicate, to the
Manufacturer of the completed vessel [see U-2(b)]. …
These Partial Data Reports, together with his own inspection, shall be the final
Inspector’s authority to witness the application of a Certification Mark to the vessel.

• U-2(b)
(1) The Manufacturer of any vessel or part to be marked with the Certification Mark
has the responsibility of complying with all of the applicable requirements of this
Division and, through proper certification, of assuring that all work done by others also
complies. …
(2) Some types of work, such as forming, nondestructive examination, and heat
treating, may be performed by others (for welding, see UW-26 and UW-31). It is the
vessel or part Manufacturer’s responsibility to ensure that all work so performed
complies with all the applicable requirements of this Division. After ensuring Code
compliance, the vessel or part may be stamped with the Certification Mark and
Designator by the appropriate Certificate holder after acceptance by the Inspector.
Lloyd’s Register Energy
References in ASME BPVC Section VIII Division 1

• U-2(h) Field assembly


… In all three alternatives, the party completing and signing the Form U-1 or U-1A
Manufacturer’s Data Report assumes full Code responsibility for the vessel.

Lloyd’s Register Energy


Question

• What can the AI do?

• What must the AI do?

Lloyd’s Register Energy


René Uebel
Technical Manager – Accredited Services
Lloyd‘s Register Energy
T +49 (0)172 9418 407 E rene.uebel@lr.org

Lloyd’s Register Group Services Limited


71 Fenchurch Street, London EC3M 4BS

Working together
for a safer world

Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates.
Copyright © Lloyd’s Register Energy. 2013. A member of the Lloyd’s Register group.

You might also like