Mason(1st class) day 495.00 painter 1st Class * day 580.00 4 25-27 mm size HBG metal 899.05
(IRC&MOST)
Mason(2nd class) day 460.00 Surveyor day 645.00 5 40-45 mm size HG M/C metal 560.00
(IRC&MOST)
Blacksmith day 1st & 2nd cl 495.00 Asphalt/ Bitumen day 400.00 6 19-22 mm size HG M/C metal 937.15
(Road SSR) Sprayer (IRC&MOST)
7 12-14 mm size HG M/C metal 742.85
(IRC&MOST)
8 9.5-11.2 mm size HG M/C metal 624.75
(IRC&MOST)
BASIC RATES
Cement 3828.13
Steel 56500
Length of WBM road 1200 Rmt
NP3 600mm Dia Culverts 4 Nos
NP3 900mm Dia Culverts 1
Length of Retaining Wall wall 0.00 Rmt
-----------------------------END OF INPUT------------------------------
GRANT : MGNREGS
GOVERNMENT OF ANDHRA PRADESH
VIZIANAGARAM DISTRICT - AP
DETAILED ESTIMATE
Work ID : 0270310
Grant : NREGS
The above work is proposed for administrative sanction under NREGS Grant.
The estimate is prepared with the SSR 2021-22 and the work will be carried out as per APDSS and
as per the guide lines from time to time.
CD Works
808706
Total Amount
882390
Name of the sub Work : Construction of 600 mm dia. Pipe culvert. 1 Nos
S. Measurments Quantit
Description No Rate Amount
No L B D y
Name of the sub Work : Construction of single vent 900 mm dia. Pipe culverts 1 Nos
Measurments
S.No Description No Quantity Rate Amount
L B D
1 Earthwork in excavation for structures as per drawing and technical
specifications Clause 305.1 including setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material
as per Technical Specification For Foundations
1.80 m
LBL
0.15 m
0.90 m
0.30 m
1.20 m
Moment about Toe
Sl No Designation Force ( Kn) Lever Arm ( m) ( kn -m)
1 W1 0.4x1.8x24= 0.15+(0.4)/2
17.28 0.35 6.05
2 W2 1/2x0.5x1.8x24= 0.15+0.4+(1/3x0.5)=
10.80 0.72 7.78
3 W3 1/2x(0.5/2)x1.8x18= 0.15+0.4+(2/3x0.5)=
4.05 0.880 3.56
4 W4 0.15x1.8x18= 0.15+0.9+(0.15/2)=
4.86 1.13 5.49
5 W5 1.2x0.3x24= 1.2/2=
8.64 0.6 5.18
45.63 28.06 Kn-m
1) Check for Over turning
Total
Quantity Descriptio Seignorage Seignorage
Quantity Cement
S No Description of Work (Finished Unit n of Charges / Charges
of Material in bags
item ) Material Cum Amount
Collected
1 2 3 4 5 6 7 8 9
Road Portion
Embankment 432.00 Cum Earth 432.00 45.00 19440
Shoulders,Sub grade
and protective carpet 361.00 Cum Earth 433.20 45.00 19494
with selected earth
Retaining Wall
Unit = 10 sqm
Taking output = 1 hectare
By Mechanical Means
In area of non-thorny jungle (light jungle)
a) Labour
Mazdoor (Unskilled) day 8.62 490.00 4223.80
b) Machinery
Dozer D 50 with attachment or suitable machinery for
hour 10.00 1635.00 16350.00
removal of trees & stumps
Tractor with Rotevator hour 1.00 456.00 456.00
21029.80
Rate per hectare a+b+c 21029.80
Rate per 1 Sqm=(a+b+c)/10000 Rs. 2.10
2 Engaging Unskilled Labour for earth work excavation in Normal Soils (chowdu, red
earth, black cotton etc.) AT SITE with initial lead & initial lift and breaking clods and
sectioning for formation of embankment - for roads (RSSR)
Rate as per Current RSSR for formation of road
Mazdoor
Rate per (un-skilled)
cu.m As Per RSSR day 3.64 490.00 1,783.60
237.00
Unit = cum
Taking output = 100 cum
a) Labour
Mazdoor (Unskilled) day 1.04 490.00 509.60
Add Municipal/ Agency Allowance 0% 0.00
b) Machinery
Hydraulic Excavator 0.9 cum bucket capacity @ 60 Cum 1.67 2945.40 4,918.82
cum per hour
Tipper 5.5cum with 10T capacity hour 4.50 1,014.30 4,564.35
Dozer D50 for spreading @ 200 cum per hour hour 0.50 1,635.00 817.50
Motor Grader hour 4.00 3,192.00 12,768.00
Water tanker 6 KL capacity hour 2.00 691.00 1,382.00
Three wheel 80-100 kN static roller @ 80 cum per hour 1.00 1626.10 1,626.10
Basic rate of formation of road with borrow soils per 26,586.37
Cum
16 / 68
S. Index Description of item Unit Qty Rate Amount
No Code
.
d) Over heads & Contractor's profit 0.0% 0.00
Rate per 100 cums 26,586.37
Rate per cum 265.86
5 RBR - Construction of ,Shoulders and Sub base by providing Selected earth having MDD not less than
EECD - 1.85g/cc with LL & PI not exceeding 40% and 20% respectively and and spreading in uniform layers
15 with tractor grader on prepared surface and compacted to OMC with Vibratory roller of 80 to 100kN
capacity to achieve the desired density, complete as per IRC technical specification clause 303 MoRD
305, MoRT&H by using machinery including all over heads, and Contractors profit, but excluding GST
and seigniorage charges etc, complete for finished item of work.
17 / 68
Add Municipal/ Agency Allowance 20%
Over heads & Contractor's profit 13.615%
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040 420.00 436.80
Add Municipal/ Agency Allowance 20% 87.36
b) Machinery
Hydraulic broom @ 1250 sqm per hour 1.400 375.00 525.00
hour
Air compressor 210 cfm hour 1.400 462.20 647.08
Bitumen emulsion pressure distributor hour 1.000 860.00 860.00
@ 1750 sqm/hour
Water tanker 6 kl capacity 1 trip per hour 0.500 630.00 315.00
hour
c) Material
Bitumen emulsion (SS-1) @ 0.85 kg t 1.480 48150.00 71,262.00
per sqm
Water kl 3.000 #MACRO? #MACRO?
#MACRO?
Over heads & Contractor's profit 13.615% #MACRO?
Cost of 1750 sqm = a+b+c+d+e #MACRO?
Rate per sqm = (a+b+c+d+e)/1750 #MACRO?
28 RBR - TACK COAT
BASC -
2(iii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at
the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer &
cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including
contractors profit & Over head charges, VAT etc., complete for Tack Coat (with cold mix
process as per IRC:SP: 100-2014)
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040 420.00 436.80
Add Municipal/ Agency Allowance 20% 87.36
b) Machinery
Hydraulic broom @ 1250 sqm per hour 1.400 375.00 525.00
hour
Air compressor 210 cfm hour 1.400 462.20 647.08
Emulsion pressure distributor @1750 hour 1.000 860.00 860.00
sqm per hour
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg t 0.480 43930.00 21,086.40
per sqm
Cost of 1750 sqm = (a+b+c+d+e) 23,642.64
Rate per sqm = a+b+c+d+e/1750 13.51
(e) Over heads & Contractor's profit 13.615% 1.84
Rate per Sqm 15.40
29 20mm thick Open-Graded Premix Carpet using Cold Mix Technology using Mixall
Providing and laying Cold Mixed Open Graded Premix Carpet (OGPC) surfacing material of 20
mm thick composed of 13.20 mm to 5.60 mm size machine crushed hard blasted granite chips
(Table 500.10 of MORD) using Cold Mix Bitumen Binder @ 21.50 kg per 10 sqm area of road
surface over tack coat to required line, level, grade to serve as wearing course on previously
prepared base including mixing in a Mixer of 6 to 10 T capacity or Concrete Mixer, trasporting
RBR - the mixer to point of use and rolloing with three wheeled 8-10 Tonnes capacity power roller and
BASC - finishing to required level and grades including cost, conveyance, leads and lifts of all materials
14(ii) from approved sources, labour charges and hire and operational charges of power road roller
and all other machinery, tools and plants, providing barricading for diversion of traffic, erecting red
flags other incidental and operational charges etc., complete for finished item of work as per
technical specifications clause 506.2 of MORD. including contractors profit & Over head charges,
VAT and Seigneorage etc., complete.(with cold mix process as per IRC:SP: 100-2014)
as per technical specification clause 508 of MORD including contractors profit & Over head
charges, VAT and Seigneorage etc., complete for seal coat. (with cold mix process as per
IRC:SP: 100-2014)
Unit = sqm
Taking out put = 1250 Sqm
Labour
Mate day -
Mazdoor (un-skilled) day 14.00 320.00 4480.00
Mazdoor (semi-skilled) day 4.80 320.00 1536.00
Add Municipal/ Agency Allowance 20% 1203.20
Machinery
Mixall 6/10 T capacity hour 2.00 620.00 1240.00
Three wheel 80-100 kN static roller hour 2.00 1101.00 2202.00
Materials
Cold Mix Bitumen Binder @ 10.00 kg MT 1.2500 48,830.00 61,037.50
per 10 sqm
Crushed stone chipping of 6.7 mm cum 11.25 1077.26 12119.18
size 100% passing 9.50mm seive and
retained on 2.36 mm sieve applied @
0.09 cum per 10 sqm. (Avg. 5-7mm &
2.36-5mm)
Over heads & Contractor's profit 13.6% 11411.80
4 RBR- Providing concrete for plain concrete M 10 grade PCC (1:3:6) mix for Retainingwalls using 40
FNDN-4 mm nominal hard stone aggregate (HBG), mechanically mixed, placed in foundation and
I(iii) compacted by vibration including curing for 14 days complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH etc.,
complete.
21 / 68
S. Description of item Unit Qty Rate Amount
No.
40 mm aggregate cum 0.480 1693.05 812.66
20 mm aggregate cum 0.240 88.00 21.12
10 mm aggregate cum 0.080 0.00 0.00
Water kl 1.20 88.00 105.60
(b) Labour
Mate day -
Mason (1st Class) day 0.10 585.00 58.50
Mazdoor (Unskilled) day 1.39 490.00 681.10
Add Municipal/ Agency Allowance 0% 0.00
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity fitted hour 0.40 626.20 250.48
with water measuring device and preferably also with
load cell. 3322.97
(d) Formwork @ 10% on cost of material, labour and 10.00% 332.30
machinery (a+b+c)
3655.27
Over heads & Contractor's profit 0.000% 0.00
Rate per cum = a+b+c+d+e+f 3655.27
5 RBR- Plain cement concrete M 15 grade using 40,20 & 10mm metal (HBG) mechanically mixed for
SBST-5 bodywalls complete as per drawings and technical specification Clauses 802, 804, 805, 806,
I 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH etc., complete-
22 / 68
S. Description of item Unit Qty Rate Amount
No.
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular
material including fixing collar with cement mortar 1:2 but excluding excavation, protection works,
backfilling, concrete and masonry works in head wall and parapets. Tech Specification Clause 1106 MORD
Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
Bi 900 mm dia
Data for 1000 mm dia
a) Labour
Mate day -
Mason (1st Class) day 0.25 585.00 146.25
Mazdoor (Unskilled) day 2.09 490.00 1,024.10
Add Municipal/ Agency Allowance 0% 0.00
Laying & fixing of Pipes with colors in position including rm
lifting, aligning etc.,
b) Material
Sand for mortar cum 0.04 698.15 27.93
Cement at site t 0.03 4900.00 147.00
For 1000 mm dia 1345.28
Proportinate For 900 mm dia 1210.75
RCC pipe NP3 pipe at site m 7.50 5503.74 41,278.05
RCC pipe NP3 collar at site nos 2.00 947.54 1,895.08
44,383.88
44,383.88
Cost for 7.5 m = a+b+c+d 44,383.88
Rate per m = (a+b+c+d)/7.5 5,917.85
23 / 68
RBR-TSRA
Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
Allowances Made
Over heads & Contractor's Profit 0.000%
Add Municipal/ Agency Allowance 0.00%
Water (Y/N) Y 77.00 Rate per kL
Sub analysis
RBR- a Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per
FNDN-7 drawings and technical specifications Clauses 1000 and 1202 MORD & 1100, 1600
MORTH for Bars below 36 mm dia including over laps and wastage, where they are
not welded.
Unit = t
(a) Material
HYSD bars including 5 per cent for overlaps and t 1.05 #REF! #REF!
wastage
Binding wire kg 6.00 55.00 330.00
(b) Labour for cutting, bending, shifting to site, tying
and placing in position
Mate day -
Blacksmith day 2.00 495.00 990.00
Mazdoor (Unskilled) day 6.40 420.00 2688.00
Add Municipal/ Agency Allowance 0.00% 0.00
Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
(a) Material
Cement t 0.275 #REF! #REF!
Coarse sand cum 0.480 #REF! #REF!
40 mm aggregate cum 0.480 #REF! #REF!
20 mm aggregate cum 0.240 #REF! #REF!
10 mm aggregate cum 0.080 #REF! #REF!
Water kl 1.200 77.00 92.40
(b) Labour
Mate day -
Mason (1st Class) day 0.100 495.00 49.50
Mazdoor (Unskilled) day 1.390 420.00 583.80
Add Municipal/ Agency Allowance 0.00% 0.00
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 471.10 188.44
(d) Formwork @ 4% on cost of material, labour and 4.00% #REF!
machinery (a+b+c)
Rate per cum = a+b+c+d+e+f #REF!
RBR- d Providing concrete for plain concrete M 10 grade in open foundations using 40 mm
FNDN-4 nominal size Graded hard stone aggregate, mechanically mixed, placed in
foundation and compacted by vibration including curing for 14 days complete as per
drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and
1500, 1700 & 2100 MORTH ,including overhead charges & Contractors profit but
excluding VAT.
P.C.C grade M 10
Nominal mix 1:3:6
Unit = cum
(a) Material
Cement t 0.22 #REF! #REF!
Coarse sand cum 0.45 #REF! #REF!
40 mm aggregate cum 0.90 #REF! #REF!
Water kl 1.20 77.00 92.40
(b) Labour
Mate day -
Mason (1st Class) day 0.10 495.00 49.50
Mazdoor (Unskilled) day 1.39 420.00 583.8
Add Municipal/ Agency Allowance 0.00% 0.00
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum capacity hour 0.40 471.10 188.44
fitted with water measuring device and preferably
also with load cell.
Water tanker 6 kl capacity hour 0.13 630.00 81.9
#REF!
Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
Paint conforming to requirement of Clause 1701.3.8 litre 6.00 276.00 1656.00
Add for scaffolding @ 1 per cent of labour cost
where required
Filling Material on Paint Cost
3
RBR-TSRA
Index-
S. No Description Unit Quantity Rate Rs. Amount Rs.
code
1 2 3 4 5 6
c) Excavation in soil for foundation
As per item No. 1 of Chapter 11 cum 2.77 152.88 423.48
d) Painting two coats on concrete surface
As per item No.5 of Chapter 10 sqm 11.41 123.75 1411.99
e) lettering on km post (average 12 letters of 10 cm
height each)
As per item No. 1 of Chapter 10 per cm 1680.00 0.69 1159.20
high per
letter
Transportation and fixing
f) Labour
Mate day -
Mason (1st Class) day 1.00 495.00 495.00
Mazdoor (Unskilled) day 7.32 420.00 3074.40
Add Municipal/ Agency Allowance 0.00% 0.00
g) Machinery
50 HP Tractor with trolley hour 6.00 415.00 2490.00
Over heads & Contractor's Profit 0.00% #REF!
j) Cost for 14 Nos. ordinary km stone = #REF!
(a+b+c+d+e+f+g+h+i)
Rate for each ordinary km stone = j/ 14 #REF!
5 (iii) 200 m / Hectometer stone (precast)
Unit = each
Taking output = 33 Nos.
a) M-15 grade of concrete
As per item No. 5 (i) or (ii) of Chapter 12 cum 1.58 #REF! #REF!
b) Steel reinforcement @ 5 kg per sqm
As per item No. 6 of Chapter 12 kg 66.00 #REF! #REF!
c) Excavation in soil for foundation
As per item No. 1 of Chapter 11 cum 1.39 152.88 212.50
d) Painting two coats on concrete surface
As per item No.5 of Chapter 10 sqm 6.27 123.75 775.91
e) lettering on km post (average 1 letter of 10 cm
height each)
As per item No. 1 of Chapter 10 per cm 330.00 0.69 227.70
high per
letter
Transportation and fixing
f) Labour
Mate day -
Mason (1st Class) day 1.50 495.00 742.50
Mazdoor (Unskilled) day 7.34 420.00 3082.80
Add Municipal/ Agency Allowance 0.00% 0.00
g) Machinery
50 HP Tractor with trolley hour 6.00 415.00 2490.00
Over heads & Contractor's Profit 0.00% #REF!
j) Cost for 33 Nos. 200 m stone = #REF!
Rate for each 200 m stone = j / 33 #REF!
Note : 1. The rate for excavation, cement concrete, steel reinforcement, painting and
lettering may be taken from respective Chapters.
2. In case local stone is to be used in place of precast RCC stones, then rate of cement
concrete and steel reinforcement may be deleted.
6 Cost & supply of Guard Stones ( 1200 x 200 x 200 mm )including all taxes but
excluding VAT
Cost & supply of Guard Stones ( 1200 x 200 x 200 each 1.00 152.00 152.00
mm)
d&e) Overheads & Contractors Profit 0.00% 0.00
152.00
4
LEAD STATEMENT 2021-22
Name of the Work:- Construction of Gravel road for Community from Koneru to Bobbili Gorja
Deduct
13.615% Machin
over e
Conveya Net Add Deduct
Sl Name of Lead in Heads Blasting Crushin Un Add GST Total
Description in Material Initial nce Lead Loading 20% for
No. the Quarry Km and Charges g Loading Charges Amount
charges Charges MBA stacking
contract Charge
profit on s
LEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 Selected Earth Local 5.00 107.00 89.90 0.00 89.90 0.00 0.00 0.00 0.00 0.00 5.35 202.25
2 Gravel Local 6.00 138.00 103.40 0.00 103.40 0.00 0.00 0.00 0.00 0.00 6.90 248.30
3 Sand for Concrete Vegavathi 3.00 605.00 62.90 0.00 62.90 0.00 0.00 0.00 30.25 698.15
4 Sand for filling Vegavathi 3.00 460.00 62.90 0.00 62.90 0.00 0.00 0.00 23.00 545.90
5 Sand for plastering Vegavathi 3.00 700.00 62.90 0.00 62.90 0.00 0.00 0.00 35.00 797.90
6 60-63mm HBG metal Rapaka 65.00 452.50 789.60 0.00 789.60 70.00 0.00 0.00 0.00 0.00 22.63 1334.73
IRC,HBG Metal
7 50 -55mm HBG Metal Rapaka 65.00 492.50 789.60 0.00 789.60 70.00 0.00 0.00 0.00 0.00 24.63 1376.73
IRC, hand broken Metal
8 40-45mm HBG M/c Metal Rapaka 65.00 604.80 789.60 0.00 789.60 70.00 0.00 0.00 0.00 30.24 1494.64
IRC, hand broken Metal
9 40-45mm HBG Hand Rapaka 65.00 604.80 789.60 0.00 789.60 70.00 0.00 0.00 0.00 0.00 30.24 1494.64
broken Metal
IRC, MORTH & MORD
10 19 - 22mm HBG Hand Rapaka 65.00 984.00 789.60 0.00 789.60 70.00 0.00 0.00 0.00 0.00 49.20 1892.80
broken metal
IRC, MORTH & MORD
11 9.5-11.2 mm HBG M/c Rapaka 65.00 682.20 789.60 0.00 789.60 70.00 170.55 0.00 0.00 0.00 34.11 1746.46
Metal
IRC, MORTH & MORD
12 5-7 mm HBG M/c Metal Rapaka 65.00 524.20 789.60 0.00 789.60 70.00 131.05 0.00 0.00 0.00 26.21 1541.06
IRC, MORTH & MORD
Deduct
13.615% Machin
over e
Conveya Net Add Deduct
Sl Name of Lead in Heads Blasting Crushin Un Add GST Total
Description in Material Initial nce Lead Loading 20% for
No. the Quarry Km and Charges g Loading Charges Amount
charges Charges MBA stacking
contract Charge
profit on s
LEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
13 2.36 - 5 mmHBG M/c Metal Rapaka 65.00 381.00 789.60 0.00 789.60 70.00 95.25 0.00 0.00 0.00 19.05 1354.90
IRC, MORTH & MORD
14 9.50 - 4.75 mmHBG M/c Rapaka 65.00 480.00 789.60 0.00 789.60 70.00 120.00 0.00 0.00 0.00 24.00 1483.60
Metal
IRC, MORTH & MORD
15 9.50 - 4.75 mmHBG M/c Rapaka 65.00 535.00 789.60 0.00 789.60 0.00 0.00 0.00 0.00 0.00 26.75 1351.35
Metal
IRC, MORTH & MORD
16 40mm HBG metal Rapaka 65.00 649.00 789.60 0.00 789.60 70.00 152.00 0.00 0.00 0.00 32.45 1693.05
17 20mm HBG Metal Rapaka 65.00 1079.00 789.60 0.00 789.60 70.00 254.00 0.00 0.00 0.00 53.95 2246.55
18 12mm HBG Metal Rapaka 65.00 860.00 789.60 0.00 789.60 70.00 202.00 0.00 0.00 0.00 43.00 1964.60
19 10mm HBG Metal Rapaka 65.00 726.00 789.60 0.00 789.60 70.00 181.50 0.00 0.00 0.00 36.30 1803.40
20 2.36 mm Below HBG chips Rapaka 65.00 381.00 789.60 0.00 789.60 0.00 0.00 0.00 0.00 0.00 19.05 1189.65
(crusher stone dust)
21 900mm Dia NP3 Class Mettavalas 8.00 4459.00 242.12 802.62 5503.74
a
22 900mm Dia Collar Mettavalas 8.00 803.00 144.54 947.54
a
23 600mm Dia NP3 Class Mettavalas 8.00 2172.00 134.20 390.96 2697.16
a
24 600mm Dia Collar Mettavalas 8.00 402.00 72.36 474.36
a
25 1000mm Dia NP3 Class Mettavalas 8.00 5455.00 284.72 981.90 6721.62
a
Deduct
13.615% Machin
over e
Conveya Net Add Deduct
Sl Name of Lead in Heads Blasting Crushin Un Add GST Total
Description in Material Initial nce Lead Loading 20% for
No. the Quarry Km and Charges g Loading Charges Amount
charges Charges MBA stacking
contract Charge
profit on s
LEAD
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
26 1000mm Dia Collar Mettavalas 8.00 1002.00 180.36 1182.36
a
27 Cement 4900.00
28 Steel Fe 500 56500.00 10170.00 66670.00
0.5 0.00 0.5 0.00 0.5 250.28 0.5 207.68 0.5 118.48
1 32.50 1 33.70 1 250.28 1 207.68 1 118.48
2 45.50 2 47.20 2 250.28 2 207.68 2 118.48
3 60.60 3 62.90 3 250.28 3 207.68 3 118.48
4 73.60 4 76.40 4 250.28 4 207.68 4 118.48
5 86.60 5 89.90 5 250.28 5 207.68 5 118.48
6 99.60 6 103.40 6 261.76 6 219.16 6 123.72
7 112.60 7 116.90 7 273.24 7 230.64 7 128.96
8 125.60 8 130.40 8 284.72 8 242.12 8 134.20
9 138.60 9 143.90 9 296.20 9 253.60 9 139.44
10 151.60 10 157.40 10 307.68 10 265.08 10 144.68
11 164.60 11 170.90 11 319.16 11 276.56 11 149.92
12 177.60 12 184.40 12 330.64 12 288.04 12 155.16
13 190.60 13 197.90 13 342.12 13 299.52 13 160.40
14 203.60 14 211.40 14 353.60 14 311.00 14 165.64
15 216.60 15 224.90 15 365.08 15 322.48 15 170.88
16 229.60 16 238.40 16 376.56 16 333.96 16 176.12
17 242.60 17 251.90 17 388.04 17 345.44 17 181.36
18 255.60 18 265.40 18 399.52 18 356.92 18 186.60
19 268.60 19 278.90 19 411.00 19 368.40 19 191.84
20 281.60 20 292.40 20 422.48 20 379.88 20 197.08
21 294.60 21 305.90 21 433.96 21 391.36 21 202.32
22 307.60 22 319.40 22 445.44 22 402.84 22 207.56
23 320.60 23 332.90 23 456.92 23 414.32 23 212.80
24 333.60 24 346.40 24 468.40 24 425.80 24 218.04
25 346.60 25 359.90 25 479.88 25 437.28 25 223.28
26 359.60 26 373.40 26 491.36 26 448.76 26 228.52
27 372.60 27 386.90 27 502.84 27 460.24 27 233.76
28 385.60 28 400.40 28 514.32 28 471.72 28 239.00
29 398.60 29 413.90 29 525.80 29 483.20 29 244.24
30 411.60 30 427.40 30 537.28 30 494.68 30 249.48
31 422.40 31 438.60 31 548.76 31 506.16 31 254.72
32 433.20 32 449.80 32 560.24 32 517.64 32 259.96
33 444.00 33 461.00 33 571.72 33 529.12 33 265.20
34 454.80 34 472.20 34 583.20 34 540.60 34 270.44
35 465.60 35 483.40 35 594.68 35 552.08 35 275.68
36 476.40 36 494.60 36 606.16 36 563.56 36 280.92
37 487.20 37 505.80 37 617.64 37 575.04 37 286.16
38 498.00 38 517.00 38 629.12 38 586.52 38 291.40
39 508.80 39 528.20 39 640.60 39 598.00 39 296.64
40 519.60 40 539.40 40 652.08 40 609.48 40 301.88
41 530.40 41 550.60 41 663.56 41 620.96 41 307.12
42 541.20 42 561.80 42 675.04 42 632.44 42 312.36
43 552.00 43 573.00 43 686.52 43 643.92 43 317.60
44 562.80 44 584.20 44 698.00 44 655.40 44 322.84
45 573.60 45 595.40 45 709.48 45 666.88 45 328.08
46 584.40 46 606.60 46 720.96 46 678.36 46 333.32
47 595.20 47 617.80 47 732.44 47 689.84 47 338.56
48 606.00 48 629.00 48 743.92 48 701.32 48 343.80
Metal Earth, Gravel & Sand pipes 1000 pipes 900 pipes 600
11.3
9.4
SEINORAGE CALCULATIONS
Name of The Work :- Providing B T to the Road from Chekkavalasa to
Pulugummi via Eadulavalasa in Komarada Mandal of
Vizianagaram Dist.
Total
Quantity Descript Seignorage Seignorage
S Quantity of
Description of Work ( Finished Unit ion of Charges / Charges
No Material
item ) Material Cum Amount
Collected
1 2 3 4 5 6 7 8
Road Portion
1 Clearing & Grubbing 5760.000 Sqm
2 Construction of Embankment 12000.00 Cum Earth 12000.00 30.00 360000
3 GSB 1783.80 Cum Metal 2283.26 75.00 171245
4 WMM 1808.10 Cum Metal 2766.39 75.00 207479
5 MSS 25mm thick 7.53 Cum Metal 10.85 75.00 814
6 Shoulders with selected earth 1800.00 Cum Earth 2160.00 30.00 64800
7 CC Pavement 0.00 Cum Metal 0.00 75.00 0
Sand 0.00 50.00 0
CC Drain
1 E/W for Foundation 162.00 Cum Earth 162.00 30.00 4860
2 Sand for Filling 0.00 Cum Sand 0.00 50.00 0
3 M10 for Foundation 40.50 Cum Metal 36.45 75.00 2734
0.000 Sand 18.23 50.00 911
4 M15 for Body walls 67.50 Cum Metal 54.00 75.00 4050
Sand 32.40 50.00 1620
Levelling course
For Raft foundation
cut off wall u/s
cut off wall d/s
For Wing walls
Total Quantity 17.22 3822.63 / CUM 65826
Cum
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal (HBG) mechanically mixed for bodywalls complete as
per drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH etc., complete-
Footings
For Raft foundation
Wing walls 1st footing x
-do- 2nd footing x
Measurments
S.No Description No Quantity Rate Amount
L B D
-do- 3rd footing x
88.01 4317.97 / CUM 380025
Cum
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal (HBG) mechanically mixed in substructure complete
as per drawings and technical specification Clauses 802,
804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700
& 2200 MORTH , but excluding VAT and seigniorage
charges -
Abutments
Abutments
(1.30+0.7)/2 =1.00
Wing walls
(1.5+0.90)/2 = 1.20
(1.10+0.4)/2 = 0.75
Parapet
Total Quantity 52.34 4701.83 / CUM 246094
Cum
4 Reinforced cement concrete M25 grade (Design Mix) using
20 & 12mm metal (HBG) mechanically mixed in substructure
complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD
and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT and
seigniorage charges (upto 5m height)
Bed blocks
Bed blocks
Dirt walls
4.23 6329.96 / CUM 26776
Cum
5 Providing and laying reinforced cement concrete M25 grade
(Design Mix) using 20 & 12mm metal (HBG) mechanically
mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD /
Sections 1500, 1600 & 1700 MORTH ,including overhead
charges & Contractors profit but excluding VAT and
seigniorage chargesupto 5m height. - For Super Structure
(Deck slab)
Deck slab
3.31 6887.77 / CUM 22799
Cum
5 Providing and laying cement concrete wearing course M 30
(Design Mix) grade using 20 & 10mm metal (HBG)
mechanically mixed excluding reinforcement complete as
per drawing and technical specifications Clauses 800 and
1206.3 MORD and 2702 MORTH ,including overhead
charges & Contractors profit but excluding VAT and
seigniorage charges -
0.00 362.89 / Rm 0
Rmt
7 Supplying, fitting and placing HYSD bar reinforcement (Fe
415) in substructure complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202 MORD /
Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not
welded ,including overhead charges & Contractors profit but
excluding VAT and seigniorage charges - For Sub
Structures
Name of the sub Work : Construction of one vent of 3 m span RCC slab culverts ( 2 Nos)
at KM 2/0 - 3/0, and at KM 4/6 - 4/8
Measurments
S.No Description No Quantity Rate Amount
L B D
1 Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification
For Foundations
For Footings of
abuttments
Levelling course
For Footings of
abuttments
For Wing walls
Total Quantity 20.77 3822.63 / CUM 79396
Cum
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal (HBG) mechanically mixed for bodywalls complete as
per drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH etc., complete-
Footings
Abutments 1st footing
-do- 2nd footing
-do- 3rd footing
Wing walls 1st footing
-do- 2nd footing
-do- 3rd footing
88.86 4317.97 / CUM 383695
Measurments
S.No Description No Quantity Rate Amount
L B D
Cum
4 Plain cement concrete M 15 grade using 40,20 & 10mm
metal (HBG) mechanically mixed in substructure complete
as per drawings and technical specification Clauses 802,
804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700
& 2200 MORTH , but excluding VAT and seigniorage
charges -
Abutments
Abutments
(1.47+0.7)/2 = 1.09
Wing walls
(2.30+3.0)/2 = 2.65
(1.26+0.4)/2 = 0.83
Parapet
Total Quantity 52.34 4701.83 / CUM 246094
Cum
5 Reinforced cement concrete M25 grade (Design Mix) using
20 & 12mm metal (HBG) mechanically mixed in substructure
complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD
and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT and
seigniorage charges (upto 5m height)
Bed blocks
Bed blocks 0 0 0 0.00 0.70 0.20 0.00
Dirt walls 0 0 1 0.00 0.40 0.375 0.00
5.22 6329.96 / CUM 33042
Cum
6 Providing and laying reinforced cement concrete M25 grade
(Design Mix) using 20 & 12mm metal (HBG) mechanically
mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD /
Sections 1500, 1600 & 1700 MORTH ,including overhead
charges & Contractors profit but excluding VAT and
seigniorage chargesupto 5m height. - For Super Structure
(Deck slab)
0.00 / Cum 0
621.37 / cum 0
Measurments
S.No Description No Quantity Rate Amount
L B D
MT
Total 979511
Sub Estimate
Construction of Gravel road for Community from Koneru to Bobbili Gorja
Name of the sub Work : Providing Retaining wall.
Measurments
S.No Description No Quantity Rate Amount
L B D
1 Gravel Backing for Revetments as per APSS including cost and
conveyance of all materials and all labour charges etc., complete
including Overhead charges and contractor's profit but excluding VAT
and seigneoarage charges.
Total Err:520
Sub Estimate
0.00
Measurments
S.No Description No Quantity Rate Amount
L B D
1 Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification For
Foundations
Cum
3 Plain cement concrete M 15 grade using 40,20 & 10mm metal
(HBG) mechanically mixed for bodywalls complete as per
drawings and technical specification Clauses 802, 804, 805,
806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH etc., complete-
Total #REF!
Sub Estimate
0.00
Name of the sub Work : Construction of Double vent 900 mm dia. Pipe culverts 0/525
Measurments
S.No Description No Quantity Rate Amount
L B D
PART B
1 Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m,
dressing of sides and bottom and backfilling in trenches with
excavated suitable material as per Technical Specification
For Foundations
Rmt
Total
#REF!
Sub Estimate
Construction of Gravel road for Community from Koneru to Bobbili Gorja
Name of the sub Work : Providing Retaining wall.
Measurments
S.No Description No Quantity Rate Amount
L B D
3 Plain cement concrete M 15 grade using 40,20 & 10mm metal
mechanically mixed for side walls complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200 MORTH ,including overhead charges &
Contractors profit but excluding VAT and seigniorage charges - For ,
Side Drain raising
0.00
0.00
Total Quantity 19.95 #REF! / CUM #REF!
2 Providing concrete for plain concrete M 10 grade in open
foundations using 40 mm nominal size Graded hard stone
aggregate (HBG), mechanically mixed, placed in foundation
and compacted by vibration including curing for 14 days
complete as per drawings and technical specifications
Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 &
2100 MORTH ,etc., complete For levelling course
Levelling course
For Raft foundation 0 0 0 0.30 5.34 0.15 0.00
cut off wall u/s 0 0 0 5.34 0.60 0.45 0.00
cut off wall d/s 0 0 0 5.34 0.60 0.60 0.00
For Wing walls 0 0 0 1.23 1.56 0.30 0.00
Total Quantity 18.40 3822.63 / CUM 70336
Cum
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal (HBG) mechanically mixed for bodywalls complete as
per drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH etc., complete-
Footings
For Raft foundation 0 0 0 0.30 5.34 0.30 0.00
Wing walls 1st footing x 0.00
-do- 2nd footing x 0.00
-do- 3rd footing x 0.00
86.95 4317.97 / CUM 375447
Cum
Measurments
S.No Description No Quantity Rate Amount
L B D
4 Plain cement concrete M 15 grade using 40,20 & 10mm
metal (HBG) mechanically mixed in substructure complete
as per drawings and technical specification Clauses 802,
804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700
& 2200 MORTH , but excluding VAT and seigniorage
charges -
Abutments
Abutments 0.00
(1.47+0.7)/2 = 1.09
Wing walls 0.00
(2.0+1.23)/2 = 1.62
(1.26+0.4)/2 = 0.83
Parapet 0.00
Total Quantity 52.34 4701.83 / CUM 246094
Cum
5 Reinforced cement concrete M25 grade (Design Mix) using
20 & 12mm metal (HBG) mechanically mixed in substructure
complete as per drawings and technical specification
Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD
and 1500, 1700 & 2200 MORTH ,including overhead
charges & Contractors profit but excluding VAT and
seigniorage charges (upto 5m height)
Bed blocks
Bed blocks 0 0 0 0.00 0.70 0.20 0.00
Dirt walls 2 x 1 0.00 0.40 0.24 0.00
4.56 6329.96 / CUM 28865
Cum
6 Providing and laying reinforced cement concrete M25 grade
(Design Mix) using 20 & 12mm metal (HBG) mechanically
mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD /
Sections 1500, 1600 & 1700 MORTH ,including overhead
charges & Contractors profit but excluding VAT and
seigniorage chargesupto 5m height. - For Super Structure
(Deck slab)
Wearing course 1 x 1
1.91 #REF! / CUM #REF!
Cum
7 Providing weep holes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall
with 100 mm dia AC pipe extending through the full width of
the structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical specification Clauses
614, 709, 1204.3.7 MORD / 2706 & 2200 MORTH including
overhead charges & Contractors profit but excluding VAT
and seigniorage charges -
Measurments
S.No Description No Quantity Rate Amount
L B D
2 x 0 1.00 0.00
0.00 362.89 / Rm 0
Rmt
8 Cost, supply and fixing of Bituminous Mastic pad 12.7 mm
including cost and conveyance and all labour charges etc.,
complete
Levelling course
For Raft foundation 1 x 1 7.80 4.00 0.15 4.68
cut off wall u/s 1 x 1 4.00 0.60 0.45 1.08
cut off wall d/s 1 x 1 4.00 0.60 0.60 1.44
For Wing walls 2 x 2 0.93 1.35 0.30 1.51
Total Quantity 8.71 3822.63 / CUM 33295
Cum
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal (HBG) mechanically mixed for bodywalls complete as
per drawings and technical specification Clauses 802, 804,
805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH etc., complete-
Footings
For Raft foundation 1 x 1 7.80 4.00 0.15 4.68
4.68 4317.97 / CUM 20208
Cum
3 Plain cement concrete M 15 grade using 40,20 & 10mm
metal (HBG) mechanically mixed in substructure complete
as per drawings and technical specification Clauses 802,
804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700
& 2200 MORTH , but excluding VAT and seigniorage
charges -
Abutments
Abutments 2 x 1 7.50 1.00 1.50 22.50
Measurments
S.No Description No Quantity Rate Amount
L B D
(1.30+0.7)/2 =1.00
Bed blocks
Bed blocks 2 x 1 7.50 0.70 0.20 2.10
Dirt walls 2 x 1 7.50 0.40 0.21 1.26
3.36 6329.96 / CUM 21269
Cum
5 Providing and laying reinforced cement concrete M25 grade
(Design Mix) using 20 & 12mm metal (HBG) mechanically
mixed in superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5 MORD /
Sections 1500, 1600 & 1700 MORTH ,including overhead
charges & Contractors profit but excluding VAT and
seigniorage chargesupto 5m height. - For Super Structure
(Deck slab)
2 x 7 1.00 14.00
14.00 362.89 / Rm 5080
Rmt
7 Supplying, fitting and placing HYSD bar reinforcement (Fe
415) in substructure complete as per drawings and technical
specification Clauses 1002, 1005, 1010 & 1202 MORD /
Sections 1600 & 2200 MORTH for Bars below 36 mm dia
including over laps and wastage, where they are not
welded ,including overhead charges & Contractors profit but
excluding VAT and seigniorage charges - For Sub
Structures
Vehicle Class
Cars,
Day Jeeps, Motorise Cycle Animal Total
Medium Commercial Agricultural Tractors/ Trailers Buses
Vans, d two- Trucks (HCV) Cycles Ricksha Drawn
Vehicles (MCV) (MCV) (HCV)
Three- wheelers ws Vehicles
wheelers
Over Unlade Over Over
Laden Unladen Laden Laden Unladen
Laden n Laden Laden
Day 1 09.12.12 1 1 1 0 0 1 2 1 1 1 1 3 24 0 24 61
Day 2 10.12.12 1 4 2 0 0 1 1 1 1 1 1 2 22 0 23 60
Day 3 11.12.12 1 5 2 0 0 3 2 1 2 2 1 3 15 0 32 69
Total 3 10 5 0 0 5 5 3 4 4 3 8 61 0 79 190
Average Daily
Traffic 1 3 2 0 0 2 2 1 1 1 1 3 20 0 26 63
#REF!
3 TO 4% CUMULATIVE ESAL
APPLICATIONS
STRENGTH 5.60%
1,00,000 to 2,00,000 BT
Gr.III
SUBGRADE
Gr.II
POOR
(CBR)
(CBR)
Existing
GSB
As per SP 72
GSB GSB 125 mm
WBM Base course 100 MM
WBM WBM 75 MM
TOTAL 300 mm
EXISTING
GSB 0 mm
WBM 0 MM
TOTAL 0 mm
PROPOSED
GSB GSB 150 mm
WBM GR.II 75 MM
WBM GR.III 75 MM
TOTAL 300 mm
5 Provision for VAT @5% 127940 #REF! #REF! #REF! Part A +Part B
VAT+GST