8.40
PAVED AREA / HARDSCAPED
4.00 4.20
PRIVATE AREA
SERVICE
2.50
AREA
1.50
PDR. STO.
1.90
RM. RM
WALK - IN -
CLOSET
1.80
PANTRY
3.90
LANAI
KITCHEN
MASTER'S
BEDROOM
4.70
2.30
6.80
14.60
GRND. FLR. PLAN
1.50
CMN.
T&B (DESIGN DEVELOPMENT
PHASE)
17.20
BEDROOM 1
2.00
3.60
UP
LIVING
AREA
4.00
2.00
STO.
RM
FOYER
1.40
3.60
ENTERTAINMENT
ROOM
3.00
LANAI
GFA (GROUND FLOOR AREA): 145.68 SQ.M.
ENTRY 2FA (2ND FLOOR AREA): 57.31 SQ.M
PORCH TFA (TOTAL FLOOR AREA): 202.99 SQ.M
PROFESSIONAL FEES 3% - OF
(PLANNING & DESIGN) APPROVED
PROBABLE
INCLUDES: CONSTRUCTION
1. SCHEMATIC DESIGN PHASE COST
2. DESIGN DEVELOPMENT
PHASE
2.00
3. CONSTRUCTION
3.50 1.50 3.00 DOCUMENT PHASE
8.40
PROFIT AND OVERHEAD COST: 10% - OF ACTUAL
CONSTRUCTION PHASE - CONSTRUCTION
CONSTRUCTION MANAGEMENT COST
PREPARED BY: CERTIFIED BY:
GENERAL NOTES: PROJECT TITLE: APPROVED BY: SHEET NO.: