You are on page 1of 7

SCOPE PIPE

SL NO DIA (AS PER LS) RECEIVED BALANCE LAYING COMPLETED

2252 2181
1 600 100 3239.5 1228.5 0
2116 0

4320 4320 0

2 500 0

2000 2000 0

630 0 630 0
3 450
2855 2855 0
4 400 1140 0 1140 0
5 350 100 100 0
1335 0 1335 0
6 300
100 100 0
16948 3239.5 13708.5 2181

DIA SCOPE RECEIVED BALANCE LAYING COMPLETED


600 4468 3239.5 1228.5 2181

500 6320 0 6320 0

TOTAL 450 3485 0 3485 0


400 1140 0 1140 0
350 100 0 100 0
300 1435 0 1435 0
SONGADH NETWORK PIPE LINE DETAILS
DI DISTRUBUTION LINE

SONGADH NETWORK PIPE LINE DETAILS


CHAINAGE NO
LENGTH(MTR)
BALANCE FROM TO

71 0 2.3 2365
100 OT-N OT-A 100
2116 2116

15.15 OT 23 I & OT 23 II
4320 4320

2000 OT-A OT-R 2000

630 15.15 OT 23 I & OT 23 II 630


2855 OT-A OT-P 2855
1140 15.15 OT 23 I & OT 23 II 1140
100 OT-R G-1 100
1335 15.15 OT 23 I & OT 23 II 1335
100 OT-R R-1 100
14767

FROM RASHMI
BALANCE LAYING PIPE AVAILABE AT SITE REQUIRED METALIKS
2287 1058.5 1228.5 878

6320 0 6320 3280

3485 0 3485 1750


1140 0 1140 656
100 0 100 100
1435 0 1435 893
LINE DETAILS
LINE
DATE
LINE DETAILS
COMPLETION SCHEDULE
WORK STATUS AGENCY NAME
WORK COMPLETION
WORK START DATE DATE

3 MONTHS FROM THE DATE OF PIPE


RECEVING

WELSPUN PIPES
RASHMI METALIKS FROM WELSPUN LTD BALANCE
PO NO -24734 QTY PIPES LTD PO NO-28615 REQUIRED
QTY
874.5 878 350.5

3280 3280 -240

1750 1750 -15


484
0
542
7/5/2023

REMARKS
LOCATION

DOSWADA BIFURCATION
rampura gaiswar village

OT-23

RAMPURA GAYSWAR
DI PIPE REQUIRED

OT-23

OT-23
kothar to GAYASWAR
OT-23
kothar to rampura