You are on page 1of 31

applied

sciences
Article
Building Information Modelling and Energy Simulation for
Architecture Design
Marina Bonomolo 1, *, Simone Di Lisi 2 and Giuliana Leone 1

1 Department of Engineering, University of Palermo, 90128 Palermo, Italy; giuliana.leone@unipa.it


2 Via Del Mazziere, 73, 90018 Termini Imerese, Italy; simone_di_lisi_95@libero.it
* Correspondence: marina.bonomolo@unipa.it

Abstract: Over the years, building information modelling (BIM) has undergone a significant increase,
both in terms of functions and use. This tool can almost completely manage the entire process
of design, construction, and management of a building internally. However, it is not able to fully
integrate the functions and especially the information needed to conduct a complex energy analysis.
Indeed, even if the energy analysis has been integrated into the BIM environment, it still fails to make
the most of all the potential offered by building information modelling. The main goals of this study
are the analysis of the interaction between BIM and energy simulation, through a review of the main
existing commercial tools (available and user-friendly), and the identification and the application of a
methodology in a BIM environment by using Graphisoft’s BIM software Archicad and the plug-in for
dynamic energy simulation EcoDesigner STAR. The application on a case study gave the possibility
to explore the advantages and the limits of these commercial tools and, consequently, to provide some
possible improvements. The results of the analysis, satisfactory from a quantitative and qualitative
 point of view, validated the methodology proposed in this study and highlighted some limitations of
 the tools used, in particular for the aspects concerning the personalization of heating systems.
Citation: Bonomolo, M.; Di Lisi, S.;
Leone, G. Building Information Keywords: BIM; BEM; simulation modelling; dynamic simulation
Modelling and Energy Simulation for
Architecture Design. Appl. Sci. 2021,
11, 2252. https://doi.org/10.3390/
app11052252 1. Introduction
The large-scale diffusion of building information modelling (BIM) tools for architecture
Academic Editors: Jürgen Reichardt
has led to an enormous evolution of these digital means [1]. Today, it includes multiple
and Igal Shohet
functions capable of carrying out numerous analyses (e.g., structural, energy, metric-
estimative, etc.) on a single virtual model of the building. In particular, some aspects, e.g.,
Received: 27 January 2021
Accepted: 1 March 2021
energy ones can be implemented by using a monitoring system connected to the BIM. Jen-tu
Published: 4 March 2021
and Vernatha [2] proposed an application of Building Information Modelling in establishing
the ‘BIM based Energy Management Support System’ (BIM-EMSS) to assist individual
Publisher’s Note: MDPI stays neutral
departments within universities in their energy management tasks. They installed sensors
with regard to jurisdictional claims in
for occupants and other equipment such as electricity sub-meters that constantly logging
published maps and institutional affil- consumption, and developing BIM models of all rooms within individual departments’
iations. facilities, data warehouse, building energy management system that provides energy
managers with various energy management functions, and energy simulation tools (such as
eQuest). In addition, Alahmad et al. [3] integrated BIM with a Real Time Power Monitoring
(RTPM) System, and Jeong-Han Woo et al. [4] presented a prototype of BIM-based Baseline
Copyright: © 2021 by the authors.
Building Model (B3M) for ageing commercial buildings. When the aim is not the real-
Licensee MDPI, Basel, Switzerland.
time monitoring and there is not an existing building or the possibility to install sensors
This article is an open access article
and other devices, it is necessary to use energy simulation tools and connect them with
distributed under the terms and the BIM. Although BIM software is technologically advanced and able to best meet the
conditions of the Creative Commons needs of professionals in various applications, the energy simulation function needs many
Attribution (CC BY) license (https:// improvements. Some researches started to investigate the topic of the “green dimension” [5].
creativecommons.org/licenses/by/ Indeed, to optimize the design in terms of energy efficiency, it could be useful that the
4.0/). energy simulation phase be carried out in meantime with the development of the project [6]

Appl. Sci. 2021, 11, 2252. https://doi.org/10.3390/app11052252 https://www.mdpi.com/journal/applsci


Appl. Sci. 2021, 11, 2252 2 of 31

and to make choices based on intermediate calculations, and therefore constantly modify
the project until the objectives are achieved [7]. To do this, it is often necessary to build
another digital model, called BEM (Building Energy Model), or implement the BIM model
with all the information needed for energy simulation (occupation of the rooms, calculation
of thermal bridges, analysis based on hourly climate data, etc.) [8]. The main issue is the
lack of bidirectional interaction between the two models. Furthermore, one of the main
issues is data transmission. For this reason, BIM for energy simulation is often used only
for early design step [9]. The aim should be to work with a unique model [10]. In last
decade, many researchers presented studies on BIM’s application in energy analysis and
simulation [11] and proposed solutions for the interoperability between BIM and energy
simulation tools [12]. Some of them developed tools to integrate BIMs. Bratch et al. [13]
evaluated the possibility of integrating a thermal load prediction metamodel to building
information models to facilitate the data exchange process. To do this, they developed
a tool to validate the viability of this integration using gbXML, and it was submitted to
validation tests. Ramaji et al. developed an extension for OpenStudio able to transform
building information models represented in Industry Foundation Classes (IFC) files into
building energy analysis models in the OpenStudio data format. Kamel et al. [14] developed
and presented a new tool called ABEMAT (Automated Building Energy Modelling and
Assessment Tool), able to make the building energy simulation using BIM automatic and
to give fine-grained outputs. It receives a gbXML file and provides users with the amount
of heat transfer through each building envelope element.
Kim et al. [15] developed and validated a library for BIM for the building energy
simulation (ModelicaBIM library) using an Object-Oriented Physical Modeling (OOPM) in
the scope of the building envelope.
A design-decision-supporting tool for the conceptual phases of design and throughout
the design process based on a BIM template has been designed by El Sayary and Omar [16].
In particular, the aim was to develop a simple tool to calculate how many photovoltaic
solar panels can be installed to reach a zero-energy building by substituting all electric
devices. Xu et al. [17] investigated the application of BIM for addressing the building
energy performance gap. The authors provided a clear set of guidelines for how BIM could
be used, by each function, to overcome the BEPG to reduce global emissions driven from
the building and construction sector. These cited studies provided good outcomes and
results. Nevertheless, a goal of this study is to test a commercial existing tool, easy to be
found and to be used. Other authors applied existing commercial tools.
Additionally, Utkucun and Sözer [18] proposed a method to determine the interoper-
ability of the utilized programs for evaluating a building’s energy performance and indoor
comfort through the BIM approach. To do this, they built three main analysis models:
An architecture of the building (with the 3D building model), indoor comfort conditions
(with the computational fluid dynamics for natural ventilation simulation), and energy
performance (with a building energy model specified by the building architecture and
its systems). Then, they integrated them through a BIM platform. In order to investigate
the potential and limitations of applying BIM to energy management and simulation
in the operation lifecycle phase of a service building, Rodrigues et al. [19] developed a
service building BIM model in Autodesk Revit and used Energy Analysis for Autodesk
Revit that automatically generated the Building Energy Model (BEM) from the BIM model
and performed a cloud-based simulation in Autodesk Green Building Studio (GBS). They
found input limitations of GBS, mainly in HVAC systems customization, compromise the
representation and energy performance evaluation of the building under actual operating
conditions. For this reason, they affirmed that GBS is more adequate for early buildings’
lifecycle stages where energy simulation results may support decisions that aim to improve
the buildings’ energy performance during the operation phase.
Tushar et al. [20] used the software Autodesk Revit together with the energy rating
tool (FirstRate5), and BIM-enabled life cycle assessment (LCA-Tally) to quantify, com-
pare, and improve the building design options to reduce carbon footprint and energy
Appl. Sci. 2021, 11, 2252 3 of 31

consumptions in residential dwellings. Alam and Ham [21] compared FirstRate5 with
Archicad EcoDesigner developing three building types. They found significant differ-
ences between simulations, being, measured areas, thermal loads, and potentially serious
shortcomings within FirstRate5, that were discussed along with the future potential of
a fully BIM-integrated model for energy rating certification in Victoria. In Farzad Jalaei
and Ahmad Jrade’s study [22], an integrated method that links BIM, energy analysis, and
cost estimating tools with a green building certification system was presented. The aim
was to calculate the potential gain or loss of energy for the building and to evaluate its
sustainability based on the US and/or Canadian Green Building Council.
Right now, the data transmission between BIM and BEM is possible through two
types of file format: IFC (Industry Foundation Classes) and gbXML (Green Building
Extensible Markup Language). Both have important advantages. The IFC format is the
standard format for information exchange in BIM modelling and is the only format to have
a certification. It is possible to load most of the information concerning a building except for
the energy analysis data, such as occupancy profiles, data relating to external and internal
temperatures, systems, etc. The gbXML is a format based on IFC, but containing all the
information of an energetic nature. It was developed to operate in this field, and it is the
most popular among energy analysis software. Indeed, some software have been imported
only in this format to the detriment of the IFC (IES-VE [23], EnergyPlus [24], eQUEST [25]).
However, in a review paper, Gao et al. [26] investigated the data transfer between BIM to
building energy modelling and they found that the development of BIM-based building
energy modelling is still at the initial stage and few methods can be guaranteed to generate
reliable building energy models from building information models without errors.
In this light, it has to be remembered that the choice of the tool is very important
because, based on the software used, working times can increase or be reduced. On the
other hand, it is possible that once the BIM model of a building is completed, it is exported
to software for energy analysis, and this does not interpret the geometries well or even fails
to import a lot of information previously entered. It makes the work useless. In this case,
the technician has to manually enter each missing item or in the worst case, he/she has to
build a model specifically for the energy analysis. This procedure can be more or less long
depending on the building under consideration. It certainly differs from the BIM aim that
provides a faster and interoperable workflow by means of a single model.
The most common choice in the architectural-energy field is to proceed with the
architectural design and postpone the energy analysis at the end. It provides a separate
and specific calculation, and this process often leads to a meaningless analysis as this
is ascertained.
The process to be adopted must be the opposite: Support the design with energy
analysis from the early stages (which by its nature will be a summary, as you will not yet
have all the parameters to be able to make a more complex analysis) and direct the project
towards a more eco-sustainable way. In this light, obviously, a real transition, from BIM to
BEM is required. It has to be managed by single software that is based on the digital model
that is being built, and which automatically updates the BEM on this basis, allowing for a
reduction in work-time and a more energy-saving design.
In this study, a methodology based on the full interaction between Graphisoft’s BIM
software Archicad and the plug-in for dynamic energy simulation EcoDesigner STAR was
tested. They have been selected after a study of the rules on energy analysis, an examination
of the operational potential of different software on the market, and a research conducted
by a wide scientific community interested in various capacities in issues related to the
interaction between architecture and energy analysis. In particular, the choice has been
based on some main criteria such as versatility, i.e., the presence of integrated functions
that allow BIM and BEM modelling, compliance with standards (the software or plug-in
for energy analysis must meet the requirements set by the most advanced energy diagnosis
standards, such as UNI EN ISO 52016-1 for the calculation in dynamic hourly regime,
ASHRAE 140-2017 and UNI/TS 11300 on the monthly average stationary calculation and
Appl. Sci. 2021, 11, x FOR PEER REVIEW 4 of 32

that allow BIM and BEM modelling, compliance with standards (the software or plug-in
Appl. Sci. 2021, 11, 2252 for energy analysis must meet the requirements set by the most advanced energy diagno- 4 of 31
sis standards, such as UNI EN ISO 52016-1 for the calculation in dynamic hourly regime,
ASHRAE 140-2017 and UNI/TS 11300 on the monthly average stationary calculation and
certification required by buildingSMART for IFC certification; and versatility thanks to
certification required by buildingSMART for IFC certification; and versatility thanks to the
the presence of integrated functions that allow BIM modelling and BEM modelling.
presence The main goals arefunctions
of integrated thatofallow
the analysis BIM modelling
the interaction between and
BIM BEM
and modelling.
energy simulation
The main goals are the analysis of the interaction between BIM
and the identification of a methodology that allows overcoming the above-mentioned and energy simulation
lim-
and
its. the identification
With this purpose, of Graphisoft’s
a methodology BIMthat allowsArchicad
software overcoming andthe
theabove-mentioned
plug-in for dynamic limits.
With this purpose, Graphisoft’s BIM software Archicad and the plug-in
energy simulation, EcoDesigner STAR, were used. They have been selected after a carefulfor dynamic energy
simulation,
study of theEcoDesigner
rules on energySTAR, were used.
analysis, They haveofbeen
an examination selected after
the operational a careful
potential study
of dif-
offerent
the rules on energy
software on the analysis, an examination
market, and of the by
research conducted operational potential
a wide scientific of different
community
software
interested oninthevarious
market, and research
capacities conducted
in issues related by
to athe
wide scientificbetween
interaction community interested
architecture
inand
various
energycapacities
analysis.in issuesto
Thanks related to the interaction
the state-of-art analysis, between architecture
the advantages and theand energy
disad-
analysis.
vantagesThanks to the state-of-art
of the existing analysis, theand
tools were highlighted advantages
compared.and Thethe disadvantages
application of the of
se-the
existing
lected tool on an existing case study gave the possibility to further study and to test the on
tools were highlighted and compared. The application of the selected tool
an existing caseFinally,
methodology. study the
gave the possibility
analysis of the lacksto suggested
further studysomeand to test the methodology.
improvements that can be
Finally,
done. the analysis of the lacks suggested some improvements that can be done.

2.2.Methodology
Methodology of
of the
the Study
This study starts
Thisstudy starts from the ideaidea that
thatBEM
BEMcan canbebeuseful
usefulfor for energy
energy analysis
analysis building,
building,
but
butthere
thereisissome
some issue
issue due to the the lack
lackof
ofbidirectional
bidirectionalinteraction
interaction between
between BIM BIM
andandBEM,BEM,
asasobserved
observedin inliterature.
literature.
This
Thispaper
paperaims
aims toto study aa method
methodto tocarry
carryout outenergy
energyanalysis
analysis using
using these
these tools.
tools. To To
do this, it was hypothesized to test a combination of two tools (selected
do this, it was hypothesized to test a combination of two tools (selected after an investigationafter an investiga-
oftion
some of some
existingexisting tools doing
tools doing background
background research).
research). TheyThey
werewereusedused to perform
to perform the ex-
the experiment
periment
(test) that (test) that provides
provides information information
and data. and data.latter
These Thesewere
latteranalyzed
were analyzed and inter- to
and interpreted
preted to the
formulate formulate
results the results by including
by including advantages advantages and disadvantages
and disadvantages to performing
to performing an energy
an energy
analysis by analysis
using the byselected
using the selected
tools. tools. In conclusion,
In conclusion, the studythe study
shows shows
that it is that it is to
possible
possibleenergy
perform to perform energy
analysis analysis
through thethrough the use
use of BIM, butofit BIM,
needsbut it needs
some some improve-
improvements.
ments.The research was conducted in several steps. In the first phase, some of the most
common Thenewresearch
designwas conducted
tools and the mostin several
recent steps. In the for
standards first phase,analysis
energy some ofwere the most
studied.
common new design tools and the most recent standards for energy
From this first analysis, it was possible to list the disadvantages and the advantages. analysis were stud-
Once
a ied.
toolFrom
was this first analysis,
selected it was possible
that matched to listcharacteristics,
the required the disadvantages and validated
it was the advantages.
using a
Once abuilding.
simple tool was Then,
selected
anthat matched
existing the required
building was chosencharacteristics,
as a case studyit wastovalidated
apply theusingenergy
a simple building. Then, an existing building was chosen
analysis methodology in a BIM environment. It was defined through the applicationas a case study to apply theof a
energy analysis methodology in a BIM environment. It was defined through the applica-
test model. Figure 1 shows the workflow diagram.
tion of a test model. Figure 1 shows the workflow diagram.

Figure1.1.Workflow
Figure Workflow diagram
diagram with
with research
researchframework.
framework.

The studies conducted in the first phase highlighted one of the main problems that
hindered the diffusion and use of energy analysis plug-ins in the BIM environment, namely
the lack of integration between the parametric architectural model with information content
(BIM, Building Information Model) and the energy model (BEM, Building Energy Model).
The problem is the possible loss of information during the conversion from BIM to BEM,
or worse, the lack of interpretation of the entire model. It is clear that this problem
diverges the actual workflow from the characteristic one of BIM, based on the principle of
Appl. Sci. 2021, 11, 2252 5 of 31

interoperability, i.e., the possibility that allows different professionals to work and exchange
information on a single digital model.
As said, the lack of integration between BIM and BEM means that, during the energy
analysis phase, it is necessary to build a new model or implement the Building Information
Model with new information not managed by it.
Once the objective of the study was defined, we moved on to research and the choice
of software suitable for supporting a working methodology that allows full integration
between BIM and BEM already in the design phase. Various digital tools for energy analysis
were evaluated, and the choice of the software used in this study was determined by the
evaluation of some of its specific characteristics, such as the validity of the calculations
(with reference to current legislation) and certifications in the BIM field. To verify the
validity of the calculations, a sample building with characteristics suitable for evaluating
the effectiveness of the software was simulated.
The last phase of the study was dedicated to applying the digital tool and the method-
ology defined for the sample model to an existing building. The choice was determined
by the value and also by the simplicity of the building, which allows you to control the
result of the simulation process more precisely. The simplicity to which reference is made
does not concern the spatial and architectural quality of the building or housing, but
rather the relationships with the ground and the characteristics of use that allow a more
effective control of the results of the BEM energy analysis. The chosen building, in fact, has
simple thermal zones, with no particularities (of use or construction) that could alter the
calculation of the energy simulation. Finally, based on the detection of the limits and the
lacks, some further possible improvements of the tool have been suggested.

3. From BIM to BEM: Advantages and Limitations


The study and the implementation of methods to transform a “BIM” to a “BEM” are a
topic always more common in the scientific community. Indeed, BEM has a large number
of applications in the most varied cases of energy analysis. Moreover, as said, the available
tools have limitations (sometimes highly restrictive). For this reason, technicians are not
encouraged to use them. The main identified problem is the transmission of data between
the BIM modelling tools and the energy simulation tools. It limits the possibility to operate
with the least possible number of digital models.
The main formats are:
• The IFC is the standard format for exchanging information in BIM modelling. It is
the only format to have a certification. By using it, it is possible to upload most of the
information relating to a building with the exception of data relating to energy analy-
sis (such as occupancy profiles, data relating to external and internal temperatures,
systems, etc.);
• the gbXML is a format based on the IFC; it contains all the energy information. It was
developed specifically to operate in this field and it is the most popular among energy
analysis software. Indeed, some software only allows the import of this format to the
detriment of IFC (IES-VE, EnergyPlus, eQUEST).
It is therefore understood that, based on the software used, working times can increase
or be reduced to a minimum. It is possible that, once the BIM model of a building is
completed, it is exported to software for energy analysis. Sometimes, it happens that it does
not interpret the geometries well or even fails to import a lot of information previously
entered, effectively making the work already done useless. In this case, the technician has
to manually enter each missing item or, in the worst case, he/she has to build a model
specifically for the energy analysis. This procedure can be more or less long depending
on the building under consideration. This certainly differs from the BIM methodology
aim. Indeed, it provides for a faster and interoperable workflow by means of a single
model. The most commonly used choice in the architectural-energy field is to proceed
with the architectural design and postpone the energy analysis at the end with a separate
and specific calculation. Often this process leads to a meaningless analysis as this is
Appl. Sci. 2021, 11, 2252 6 of 31

ascertained, which was designed with no room for improvement [26]. Obviously, the
process to be adopted should be the opposite: Support the design with energy analysis
from the early stages (which by its nature will be a summary, as you will not yet have all
the parameters to be able to make a more complex analysis) and direct the project towards
a more eco-sustainable way. With this in mind, obviously, a real transition from BIM to
BEM is required, instantaneous and managed by a single program. It is based on the digital
model that is being built. Consequently, the BEM should be automatically updated. This
procedure should reduce the time, the energy spent to work, and should allow a more
energy-saving design.

4. Short Review on Existing Tools


The quality of the product, the possibilities offered, and the use the user must do
influence the diffusion of a certain program. The most famous and common software
for BIM are Revit (Autodesk, San Rafael, United States) [27] and ArchiCAD (Graphisoft,
Budapest, Ungheria) [28] and then, Allplan (Nemetschek, Munich, Germany) [29], and
Edificius [30] (Acca Software, Avellino, Italy) [31]. The tools included in these software
are quite similar. They are equivalent to many functions and just a few advantages are
different. In all cases, as regards energy diagnosis, the use of one of these tools often is
not suitable.
The choices on the market are different, each with its peculiarities, therefore the main
characteristics of each software are examined below, giving precedence to the most common
BIM software and related plug-ins and then to independent programs.

4.1. Revit
Revit [27] is one of the most popular BIM software, both for its performance and
for its compatibility with other programs widely used in the construction sector (also
produced by Autodesk). It must be specified in this regard that Revit has not developed
great connectivity with software that is not part of the Autodesk suite. It is possible to find
compatibility problems even if almost all manufacturers try to interface as much as possible
with Revit. Energy diagnosis is allowed through an additional module, Energy Analysis,
which integrates the design features of Revit with the analysis features of Autodesk Green
Building Studio, an independent cloud service for energy diagnosis based on the DOE-2.2
simulation engine [25] (which complies with the ASHRAE 140-2007 [32] standard).

4.2. ArchiCAD
ArchiCAD [28], developed by the US company Graphisoft, is one of the two most
popular software for BIM design and has the IFC certification of buildingSMART. The
energy diagnosis can be carried out both by functions integrated into the program and
by a plug-in: EcoDesigner STAR. This latter is an integral part of the program itself. Its
calculation engine (VIP-Core by StruSoft) operates in compliance with the ASHRAE 140-
2007 and ASHRAE 90.1-2007 (LEED Energy) standards. Therefore, it operates in a dynamic
regime. The main novelty of the plug-in is the integration of the missing tools in the
package of standard tools (such as the calculation of thermal bridges or renewable energy)
and the ability to export files in .gbXML and .PHPP format, for easier collaboration between
professionals and technicians.

4.3. Allplan
Allplan [29], developed by Nemetschek, is the leading BIM-based software used in
Germany. It is among the programs certified by buildingSMART. Regarding the energy
functions, it does not have sufficient tools to conduct a correct simulation. So, in 2009, it
was implemented with a new module: AX-Energy. This module integrates the software
tools allowing it to carry out energy analyses according to Decrees 311/2006 [33] and
115/2008 [34] and UNI/TS 11300-1 [35] and 2 [36] standards, thus relying on an almost
stationary, rather than the dynamic, regime.
Appl. Sci. 2021, 11, 2252 7 of 31

4.4. Edificius
Edificius [31] is a software produced by ACCA Software. It is the only Italian program
to have received the buildingSMART IFC certification. The construction of a BIM model
is accompanied, through an external program by the same company, by the construction
of a BEM model for the energy analysis of the architectural building. TerMus used the
EnergyPlus energy simulation engine based on the ASHRAE 140-2007 standards allowing
analysis in a dynamic regime. Unluckily, it is necessary to install a series of modules,
each with its own specific function (for example TerMus-PT calculates thermal bridges
and mold risk, TerMus-DIM deals with energy diagnosis and improvement interventions,
TerMus-PLUS for dynamic calculation and so on).

4.5. Design Builder


Design Builder [37] is an independent program based on the EnergyPlus simulation
engine (it is its graphic interface), capable of analyzing a building under dynamic conditions
from the energy point of view. The software has 3D modelling tools, but it is still possible
to import into it a model built with an external program compressed in .gbXML format.
Since it is not a software used purely for parametric modelling, it does not have the
buildingSMART IFC certification.

4.6. Open Studio


Open Studio [38] is another graphical interface of the EnergyPlus simulation engine.
It is available as a plug-in for the 3D modeling program SketchUp, with the particularity of
being free. Being a SketchUp plug-in, its modelling is more intuitive than other programs
with the same function (the IFC certificate is missing), while the analysis tools are not as
intuitive as those of other software.

4.7. Simergy
Simergy [39] was developed as an independent program. It uses the EnergyPlus
simulation engine, thus operating at a dynamic speed. Its user-friendly graphic interface is
particularly effective for its use as a calculation tool, while the 3D modelling integrated
in it is not easy and immediate to use. A peculiarity of the software is the possibility of
comparing different project hypotheses with relative analyses. Additionally, in this case,
since it is not a tool for parametric modelling, the IFC certification is absent.

4.8. TermoLOG
TermoLOG [40], by Logical Soft, is independent software that integrates parametric
modelling tools and energy diagnosis. There is the possibility to import models in IFC
format built with other programs. As a parametric modelling tool, it does not have build-
ingSMART certification. According to the standards dictated by UNI EN ISO 52016 [41],
and validated by the Politecnico di Milano according to ASHRAE 140-2017 [32], it operates
with a dynamic hourly engine (CENED + 2.0).

4.9. EcoDesigner Star


EcoDesigner Star [42] is a plug-in integrated into the ArchiCAD software. It is a
graphical interface of the VIP-Core calculation engine optimized to work in harmony
with the design tool in a BIM environment. This ArchiCAD extension was created with
the aim of facilitating the design of buildings, directing them immediately towards more
sustainable solutions. It is therefore a design tool and it does not allow the certification of
buildings according to Italian standards. So, in this case, certification must be carried out
using analysis software mainly dedicated to it. However, it is specified that the software
calculations are not to be considered incorrect or non-compliant with current standards. In
fact, they are based on data and specific parameters relating to the ASHRAE standard, and
in the input phase, these parameters can be modified in order to obtain results in line with
Appl. Sci. 2021, 11, 2252 8 of 31

current legislation. It is not possible to carry out immediately and automatically to check
required by the regulations.
The novelty proposed with EcoDesigner STAR is to have, within a software in a BIM
environment, a powerful energy analysis tool. It is possible to work on a single Building
Information Model and transform it almost instantly into a Building Energy Model ready
to be analyzed. Moreover, it is also possible to orient the design of a building towards
more sustainable ways both from the point of view of energy consumption and that of
energy production through renewable sources. From the early stages of the project, an
energy analysis can be obtained by defining the parameters necessary for the calculation.
Therefore, an overview of the performance of the building and guide the designer towards
the best-integrated design solution can be carried out. Using this tool, the path to be
explored is established, and after having decided all the details of the building envelope
and systems, it is possible to proceed with a further analysis, this time more detailed, to
know the behavior of the building through a calculation dynamic, on an hourly basis. The
integrated plug-in has many advantages, e.g., the possibility to manage the workflow in an
optimal manner, and guarantees, both in terms of parameter input and in the output phase,
high versatility and a high degree of data customization. EcoDesigner STAR, through the
tools already present in ArchiCAD and connected to it, in the input phase allows you to:
• To build a BEM model from the BIM model, with the definition of thermal zones.
They are automatically detected, as well as all the constructive elements that delimit
them (walls, floors, doors, windows, beams, pillars, etc.); they can be viewed in 3D,
both as an overall volume and as specific elements with their properties (e.g., by
selecting a wall, it is possible to access all the parameters that define it, including the
thermo-physical properties and orientation);
• to select built materials, with related thermophysical properties, from a large catalogue,
or insert new ones with customized parameters, while maintaining the possibility of
changing the assigned parameters; these changes are automatically sent to the BEM;
• to geo-localize the building by entering its geographical coordinates, to set the north
and the elevation with respect to the sea level with the identification (automatic or
manual) of the quote 0; the information entered can be verified through a link with
Google Maps that indicates the position just defined;
• to define precisely both the surroundings of the building, by entering the type of land
with its thermo-physical properties, the wind and sun shields present, the climatic
data, such as air temperature, relative humidity, solar radiation, and wind speed;
they can be displayed graphically through monthly, weekly, daily, or hourly charts;
(downloading them directly from the dedicated server);
• to add thermal blocks to defined thermal zones that can be inserted; they are charac-
terized not only by the zones, but also by heating, cooling, and ventilation systems,
and by operation profiles. The systems that can be inserted are different, all already
present in a plug-in catalogue, but new ones can be added based on the type of those
present; the operation profiles are also already present in good quantity in the plug-in
library, but new ones can be added, customizing them in each of their parameters;
• to define the energy vectors and their costs;
• to calculate according to a finite element approach (FEM) the thermal bridges present
in the construction. It is possible using the “Detail” tool of ArchiCAD, which extracts
a 2D drawing from a plan or section of the project. In addition, it is possible to make
changes both in terms of geometry and materials and finally calculate the thermal
bridges through a special window, saving both the numerical data and the temperature
or heat flow graphs. Each thermal bridge can then be connected to the thermal block
to which it refers;
• to perform a solar analysis on each frame of the building with the creation of a graph;
it allows us to understand when the frame in question is exposed to the sun and in
what percentage;
In the output phase, it is possible to obtain:
Appl. Sci. 2021, 11, 2252 9 of 31

• An illustrative report of the performed energy analysis. It includes a first part that
includes all the data common to the entire project (e.g., general graphs on the building’s
consumption and energy inputs);
• an excel spread sheet containing, in an extensive and detailed way, all the information
that makes up the report;
• a file format different from the ArchiCAD ones, such as .gbXML, PHPP, and a format
compatible with VIP-Energy, for exporting the Building Energy Model within other
programs for energy analysis or certification. It is also possible to export the project as
a “reference building” in order to make a comparison, during the energy simulation
phase, between two alternatives of the same project.

4.10. Selection Criteria and Choice of Software


The criterion that led to the choice of the specific software is based on the following
characteristics:
• Versatility, i.e., the presence of integrated functions that allow BIM modelling and BEM
modelling; the software for BIM modelling can be combined with a well-integrated
plug-in for energy analysis. In this way, it is possible to import and export building 2D
drawings, BIM modelling and 3D visualization, quasi-static energy diagnosis, dynamic
energy diagnosis, calculation of thermal bridges, and calculation of renewable energy
sources. The importance of this parameter is given by the significant limitation of
errors and simplifications that may arise from the management of the model with
different software;
• certification: The BIM software must meet the validity requirements required by
buildingSMART for IFC certification;
• in compliance with standards: The software or plug-in for energy analysis meets the
requirements of the most advanced energy diagnosis standards, such as UNI EN ISO
52016-1 [41] for the calculation in dynamic hourly regime, and ASHRAE 140-2017 [32]
and UNI/TS 11300 [35] on the monthly average stationary calculation.
The following table shows the BIM and BEM software and plug-ins already mentioned
in the previous paragraph. For each of them, the greater or lesser compliance with the
criteria described above is reported.
Table 1 shows the comparison of the eight examined software.
The first important difference concerns the IFC certifications. Indeed, it can be seen
that only the BIM software combined with the plug-in has the third requirement (e.g., the
buildingSMART certification).
The stand-alone BEM software, even if equipped with tools for the construction of
a BIM model, cannot match the software dedicated to BIM in terms of functions, inter-
operability, and complexity. The adoption of the BIM Software + plug-in combination
can guarantee a faster workflow. It is free from possible simplifications or misinterpreta-
tions of the data, resulting from exporting to external software from a different software
house. Moreover, regarding the compliance of the software with the parameter relating to
compliance with current legislation, many of them do not operate according to the Italian
guidelines for stationary and dynamic calculation. Nevertheless, the 8 software examined
comply (except for Allplan) with the ASHRAE 140-2007 standards relating to the validity
of the calculation adopted. This does not mean that the calculation tools are wrong, but
that these programs can only be used for energy diagnosis. For the compilation of energy
performance certificates (APE) and other certification documents, different software has
to be used. From the examination of these two parameters, the choice can be restricted to
a more limited number of software. The BIM + plug-in software solutions that meet the
requirements include:
• Termus (even if the latter is not really a plug-in but a program to complement the first
and completely compatible), which allows you to produce documents valid in Italy;
• ArchiCAD + Ecodesigner STAR and Revit + Energy Analysis, which have a similar
range of features, but do not produce documents conforming to Italian standards.
21,
OR11,
PEER
xAppl.
FOR
REVIEW
Sci.
PEERAppl.
2021,
REVIEW
Sci.
11, xAppl.
2021,
FORSci.
11,
PEER
x2021,
FOR
REVIEW
11,
PEER
x FOR
REVIEW
PEER REVIEW
Appl. Sci. 2021, 11, x FOR PEER REVIEW 10 of 32 10 of 32 10 of 32 10 of 32 10 o

21,
pl.
ORSci.
11,
PEER
xAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERxAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERx2021,
FOR
REVIEW
11,
PEER
x FOR
REVIEW
PEER
Appl.
REVIEW
Sci. 2021, 11,
Appl.
x FOR
Sci. 2021,
PEER11,
REVIEW
x FOR PEER REVIEW 10 of 32 10 of 32 10 of 32 10 of 32 10 of 32

21,
pl.
ORSci.
11,
PEER
xAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERxAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERxAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERxAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERxAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERx2021,
FOR
REVIEW
11,
Appl.
PEER
x FOR
Sci.
REVIEW
2021,
PEER11,
REVIEW
x FOR PEER REVIEW 10 of 32 10 of 32 10 of 32 10 of 32 10 of 32 10 o
Appl. Sci. 2021, 11, Table
2252 1. Table
Comparison
1. Comparison
of eight
Tableexamined
of1.eight
Table
Comparison
examined
1.
tools.
Table
Comparison
of1.
tools.
eight
Comparison
examined
of eight examined
oftools.
eight examined
Table
tools.1. Comparison
tools. of eight examined 10tools.
of 31
21,
OR11,
PEER
xAppl.
FOR
REVIEW
Sci.
PEERAppl.
2021,
REVIEW
Sci.
11, x2021,
FOR11,
PEER
x FOR
REVIEW
PEER
Appl.
REVIEW
Sci. 2021, 11,
Appl.
x FOR
Sci. 2021,
PEER11,
REVIEW
x FOR PEER REVIEW 10 of 32 10 of 32 10 of 32 10 of 32
Table 1. Table
Comparison
1. Table
Comparison
of1.eight
Table
Comparison
examined
of1.eight
Table
Comparison
examined
of1.
tools.
eight
In Comparison
examined
ofIn
tools.
eight
Compliance examined
oftools.
eight
Tableexamined
Compliance
with 1.
tools.
InComparison
with Table
tools.
Compliance
In 1.ofComparison
eight
Compliance
In
with examined
of eight
Compliance
with tools.
examined In
with tools.
Complian
21,
pl.
ORSci.
11,
PEER
xAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERxAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERxAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERxAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERVersatility
xAppl.
2021,
FOR
REVIEW
Sci.
11,
PEERVersatility
x2021,
FOR
REVIEW
11,
PEER
x FOR Versatility
REVIEW
PEER Versatility
REVIEW Versatility Versatility
10 of 32 10 of 32 10 of 32 10 of 32 10 of 32 10 o
Table 1. Table
Comparison
1. Table
Comparison
of1.eight
Table
Comparison
examined
of1.eight
Table
Comparison
examined
of1.
tools.
eight
In Standard
Table
Comparison
examined
of1.
tools.
eight
Compliance
In Standard
Table
Comparison
examined
of1.
tools.
eight
Table
Comparison
Compliance
In
with examined
of1.
tools.
eight Standard
Comparison
Compliance
In
with 1.Standard
examined
of
Table
tools.
eight
Compliance
In
with withStandard
examined
ofComparison
tools.
eight
Compliance examined
tools.
of eight
with tools.
In examined In
tools.
Compliance Standa
Complian
with
21,
pl.
ORSci.
11,
PEER
x2021,
FOR
REVIEW
11,
PEER
x FOR
REVIEW
PEER
Appl. Sci. 2021, 11, Versatility
REVIEW xAppl.
FORSci.
PEER
2021, Table
Versatility
REVIEW 1. Comparison
11, Versatility
x FOR PEER REVIEWof eight examined tools.Versatility
Versatility
Versatility Versatility
10 of 32 10 of 32 10 of 32 10 o
Standard Standard Standard Standard
1.Standard Standard Standa

Energy

Energy

Energy

Energy

Energy

Energy
Table 1. Table
Comparison
1. Comparison
of eight
Tableexamined
of1.eight
Table
Comparison
examined
1.
tools.
Comparison
ofIn
tools.
eight examined
ofIn
eight
Tableexamined
1.
tools.
Comparison
Table
tools. ofComparison
eight examined
of eight
tools.
examined tools.

140-2007

140-2007

140-2007

140-2007

140-2007
Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis
In Compliance
Compliance
with
Compliance
In
with
Compliance
In
with
Compliance
In
with
Compliance
In
with
Compliance
In
with
Compliance
withIn Complian
with

Bridges

Bridges

Bridges

Bridges

Bridges

Bridges
52016-1

52016-1

52016-1

52016-1

52016-1

52016-1
Import

Import

Import

Import

3D/IFC Import

Import
21,
pl.
ORSci.
11,
PEER
x2021,
FOR
REVIEW
11,
PEER
x FOR
REVIEW
PEER
Appl. Sci. 2021, 11, Versatility
REVIEW xAppl.
FORSci. Versatility
PEER
2021, 11, Versatility
REVIEW Versatility
x FOR PEER Versatility Versatility
Versatility
Versatility Versatility

11300
REVIEW

11300

11300

11300
10 of 32

11300
10 of 32 10 of 32

11300
Versatility
In Compliance with 10 o
Table 1. Table Comparison 1. Table Comparison of1.eight Table
Comparisonexamined
of1.eight Table
Comparison
examined
of1. tools.
eight
Table
Comparison examined
of1. tools.
eight
Table
Comparison examined
of1. tools.
eight
Table
Comparison examined
of1. tools.
eight
Comparison
IFC examined
oftools.
eight Standard
Certification examined
ofStandard
tools.
eight Standard examined
tools. tools. Standard
Standard Standard
withStandard InIFC
Standard Certification IFC StandardCertification
InIFC Certification
IFCIn Certification
Standa

Energy

Energy

Energy

Energy

Energy

Energy

Energy
140-2007

140-2007

140-2007

140-2007

140-2007

140-2007
2D Import

Import

2D Import

Import

Import

2D Import
Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis
In Compliance InTool Compliance Inwith Compliance Compliance with with Compliance Complian
with

Bridges

Bridges

Bridges

Bridges

Bridges

Bridges

Bridges
Tool Tool Tool Tool Tool

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1
Import

Import

Import

Import

Import

Import

Import
21,
pl.
ORSci.
11,
PEER
xAppl.
2021,
FOR
REVIEW
Sci.
11,
PEER xAppl.
2021,
FOR
REVIEW
Sci.
11,
PEER xAppl.
2021,
FORREVIEW
Sci.
11,
PEER xAppl.
2021,
FORREVIEW
Sci.
11,
PEER Versatility
xAppl.
2021,
FOR REVIEW
Sci.
11,
PEER Versatility
x2021,
FOR REVIEW
11,
PEER x FOR REVIEWPEER Versatility Versatility Versatility Versatility

11300
REVIEW

11300

11300

11300

11300
10 of 32 10 of 32 10

11300
of 32 10 of 32

11300
(buildingSMART) (buildingSMART) (buildingSMART) (buildingSMART) (buildingSMART 10 of 32 10 o

Energy

140-2007
Diagnosis
Table 1. Table Comparison 1. Table Comparison of1.eight Comparisonexamined
of eight examined ofIn tools.
eight
Table examined
1. tools.
Comparison tools.
Table of1. eight
Comparison examined ofIntools.
eight examined tools.

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable
Bridges
Standard Standard IFC Certification
Standard IFC Certification
Standard IFC Certification
IFC Certification
IFC Certification
Standard Standa IF

2DEnergy

Energy

Energy

Energy

Energy

Energy

Energy

Energy

Energy
52016-1
Compliance In Compliance Inwith Compliance Inwith Compliance Inwith Compliance with Compliance Inwith Compliance In with Compliance with with

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007
2D Import

Import

Import

2D Import

Import

2D Import

Import
Import
UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS
Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis
11300
Bridges

Bridges

Bridges

Bridges

Bridges

Bridges

2DBridges

Bridges

Bridges
ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE
Tool Tool Tool Tool Tool Tool Tool Tool Versatility

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal
ISO

ISO

ISO

ISO

ISO

ISO
3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC
Versatility Versatility Versatility Versatility Versatility Versatility Versatility

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1
Import
IFC Certification
Import

Import

Import

Import

Import

Import

Import

Import

Import
11300

11300

11300

11300

11300

11300

11300

11300

11300
Standard Standard Standard(buildingSMART)
Standard(buildingSMART)
IFC Standard (buildingSMART) (buildingSMART)
StandardIFC Standard (buildingSMART)
Standard (b
Energy

Energy

Energy

Energy

Energy

Energy
Table 1. Table Comparison 1. Table Comparison of1.eight Comparisonexamined
of eight examined ofIn tools.
eight
Table examined
1. tools.
Comparison tools.
Table of1.eight Comparison examined ofIntools.
eight examined tools.

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable
2D

2D

2D
IFC Certification Certification
IFC Certification (buildingSMART)
Certification
IFC Certification
IFC Certification IFC Cert IF

Energy

Energy

Energy

Energy

Energy

Energy
Compliance In Compliance Inwith Compliance with with Compliance In with Compliance with

140-2007

140-2007

140-2007

140-2007

140-2007
2D Import

Import

Import

2D Import

Import

Import

2D Import

2D Import

Import
Renewable
UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS
Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis
UNI/TS
Bridges

Bridges

Bridges

Bridges

Bridges

Bridges
ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE
Tool Tool Tool Tool Tool Tool Tool Tool Tool Versatility

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal
ASHRAE
Thermal
ISO

ISO

ISO

ISO

ISO

ISO

ISO
3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

ISO
3D/IFC
Versatility Versatility Versatility Versatility

3D/IFC

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1
EN

EN

EN

EN

EN

EN
Import

Import

Import

Import

Import

Import
11300

11300

11300

11300

11300

11300
(buildingSMART) (buildingSMART) (buildingSMART) (buildingSMART) (buildingSMART) (buildingSMART (building (b

Energy
Standard Standard Standard Energy Standard Standard

Energy

Energy

Energy

Energy

Energy

Energy
Energy

Energy

Energy

Energy

Energy

Energy

Energy

Energy
Table 1. Table Comparison 1. Table Comparison of1.eight Table
Comparisonexamined
of1.eight Table
Comparison
examined
of1. tools.
eight
Table
Comparison examined
of1. tools.
eight
Table
Comparison examined
of1. tools.
eight
Table
Comparison examined
of1. tools.
eight
Comparison examined
oftools.
eight examined
ofIntools.
eight examined
tools. tools.

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007
Renewable

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable
2D

2D

2D
IFC Certification
IFC Certification IFC Certification IFC Certification with IF
Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis
In Compliance In Compliance Inwith Compliance with with Compliance In with Compliance
Import

Import

Import

Import

Import

Import
Bridges

Bridges

Bridges

Bridges

Bridges

Bridges

Bridges

Bridges
UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS
EN
52016-1

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1
ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE
Tool Tool Tool Tool Tool Tool Versatility
Thermal

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal
Import

Import

Import

Import

Import

Import

Import

Import
ISO

ISO

ISO

ISO

ISO

ISO

ISO

ISO

EN ISO
3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC
Versatility Versatility Versatility Versatility

11300

11300

11300

11300

11300

11300

11300

11300
EN

EN

EN

EN

EN

EN

EN
Standard Standard Standard(buildingSMART)
IFC (buildingSMART)
Certification
IFC Certification
IFC (buildingSMART)
Certification
StandardIFC (buildingSMART)
Certification
IFC Certification
IFC Certification
Standard IFC Cert (b
IF
Energy

Energy

Energy

Energy

Energy

Energy

Energy

Energy

Energy
Energy

Energy

Energy

Energy

Energy
140-2007

140-2007

140-2007

140-2007

140-2007
Import

Import

Import

Import

Import

Import

Import

Import
Renewable

Renewable

Renewable

Renewable

Renewable

Renewable
2D

2D

2D

2D

2D
Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis
In Compliance In Compliance Inwith Compliance Inwith Compliance Inwith Compliance Inwith Compliance Inwith Compliance
Bridges In with Compliance with with

Bridges

Bridges

Bridges

Bridges
Tool Tool Tool ToolAllplan Tool Tool Tool Tool

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS
52016-1

52016-1

52016-1

52016-1

52016-1
ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE
Thermal

Thermal

Thermal

Thermal

Thermal

Thermal
 +Allplan
  +Versatility     
 Allplan +AX-Energia  Versatility  Versatility   (buildingSMART)
 (buildingSMART)  (buildingSMART
 (building

Import

Import

Import

Import

Import
ISO

ISO

ISO

ISO

ISO

EN ISO
3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC
planAllplan
+ AX-Energia + AX-EnergiaAllplanAllplan + AX-Energia +Versatility
AX-Energia AX-Energia Versatility Versatility Versatility Versatility

11300

11300

11300

11300

11300
+ + + +

+ ++

+
AX-Energia (buildingSMART) (buildingSMART) (buildingSMART) (b

EN

EN

EN

EN

EN

EN

EN

EN
Renewable

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable
Standard Standard Standard IFC StandardCertification
IFC StandardCertification
IFC StandardCertification Standard IFC Certification
Standard IF
+ SoftwareBIM

Energy

Energy

Energy

Energy

Energy

Energy
Energy

Energy

Energy

Energy

Energy
+ SoftwareBIM

+ SoftwareBIM

+ + SoftwareBIM

SoftwareBIM

140-2007

140-2007

140-2007

140-2007

140-2007
2D Import

Import

Import

Import

2D Import
2D 2D

2D

2D Import 2D 2D

2D

2D 2D

2D
UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS
Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis
Bridges

Bridges

Bridges

Bridges

Bridges
ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE
Tool Tool Tool ArchiCAD + EcoDesigner ToolSTAR Tool
Thermal

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal
+ plug-in

ISO

ISO

ISO

ISO

ISO

ISO

ISO

ISO
3D/IFC

3D/IFC

3D/IFC

3D/IFC

2D3D/IFC

3D/IFC

3D/IFC

3D/IFC
52016-1

52016-1

52016-1

52016-1

52016-1
            
                      
Import

Import

Import

Import

Import
plan + Allplan
+ AX-Energia
+ Allplan + ArchiCAD
AX-Energia
Allplan + ArchiCAD
AX-Energia
+ Allplan+ ArchiCAD
AX-Energia + AX-Energia Allplan + AX-Energia

11300
 Allplan

11300
+AX-Energia

11300

11300

11300
plug-in

plug-in

plug-inplug-in plug-in

plug-in
+ +

+ + + +

+
 + STAR
+EcoDesigner STAR   STAR ArchiCAD  +EcoDesigner   (buildingSMART)   Certification  Certification
(buildingSMART)  Certification
(buildingSMART)   (buildingSMART  Certification  (b

EN

EN

EN

EN

EN
AD
ArchiCADEcoDesignerEcoDesigner STAR STAR
EcoDesigner EcoDesigner STAR
Energy

Energy

Energy

Energy

Energy

Energy

Energy

Energy
Renewable

Renewable

Renewable

Renewable

ENRenewable
2D

2D

2D

2D

2D
IFC IFC IFC Energy IFC IF

Energy

Energy

Energy

Energy

Energy

Energy

Energy
+ SoftwareBIM

SoftwareBIM

SoftwareBIM

+ SoftwareBIM

SoftwareBIM

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007

140-2007
2D Import

Import

Import

Import

2D Import
UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS
Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis

Diagnosis
Bridges

Bridges

Bridges

Bridges

Bridges

Bridges

Bridges

Bridges
ASHRAE

ENASHRAE

ASHRAE

ASHRAE

ASHRAE
Tool Tool Tool Tool Tool
Thermal

Thermal

Thermal

Thermal

Thermal
ISO

ISO

ISO

ISO

ISO
3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC
52016-1

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1

52016-1
            
                              

EN

EN

EN

EN

EN

EN

EN

EN
Import

Import

Import

Import

Import

Import

Import

Import
plan Allplan
+ AX-Energia
Allplan + AX-Energia
Allplan + AX-EnergiaAllplan
+ AX-Energia Allplan + +AX-Energia Allplan + AX-Energia Allplan + AX-Energia + AX-Energia
11300
Allplan

11300
+ AX-Energia

11300

11300

11300

11300

11300

11300
plug-in

plug-in

plug-in

plug-in

plug-in
+

AD
ArchiCAD
+ EcoDesigner
ArchiCAD
+ EcoDesigner ArchiCAD
STAR
+ EcoDesigner ArchiCAD 
STAR
+ EcoDesigner 
Edificius

STAR
+ EcoDesigner Termus
STAR
  ArchiCAD
 + Termus
STAR
   + ArchiCAD

 
EcoDesigner

 Edificius
 
 +
 EcoDesigner
STAR
  + Termus 
   IFC 
(buildingSMART)

STAR  IFC
 Certification 
  Certification
(buildingSMART) 
 
 Certification
(buildingSMART)
 

 Certification
  Certification
 IFC
  Certification
(buildingSMART
  IFC Cert (b
IF
Energy

Energy

Energy

Energy

Energy
Renewable

Renewable

Renewable

Renewable

Renewable
dificius Edificius
+ Termus + Termus Edificius Edificius
+ Termus Edificius
+ Termus
2D

2D

IFC IFC IFC


+ + SoftwareBIM

SoftwareBIM

SoftwareBIM

+ + SoftwareBIM

SoftwareBIM

+ SoftwareBIM

SoftwareBIM
2D Import

Import

Import

2D Import

2D Import

Import

2D Import
UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS
ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE
Tool Tool Tool Tool Tool Tool Tool Tool
Thermal

Thermal

Thermal

Thermal

Thermal
ISO

ISO

ISO

ISO

EN ISO
2D3D/IFC

2D3D/IFC

3D/IFC

2D3D/IFC

3D/IFC
 +  +     +  
    +     
      
   (building

EN

EN

EN

EN

EN
plan + Allplan
+ ArchiCAD
AX-Energia + ArchiCAD
AX-Energia
+ Allplan + Allplan+Revit
AX-Energia + ArchiCAD
AX-Energia Allplan + AX-EnergiaAllplan +STAR
AX-Energia
plug-inplug-in

plug-in

plug-in

plug-in

plug-in

plug-in
+

AD
ArchiCADEcoDesigner
+ EcoDesigner STAR
EcoDesigner ArchiCAD 
STAR
EcoDesigner  
+ Energy
ArchiCADSTAREcoDesigner  
Analysis
STAREcoDesigner  +
ArchiCAD                 (buildingSMART)
   (buildingSMART)
     
 (buildingSMART) (buildingSMART)
 
(buildingSMART) (buildingSMART
  (b
     STAR
  EcoDesigner 
STAR
ArchiCAD
 EcoDesigner

 STAR

 +  EcoDesigner
   Analysis

   STAR
    
 
  
      
Energy

Energy

Energy

Energy

Energy
Renewable

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable

Renewable
dificius Edificius
+ +Termus Edificius
+ Termus Edificius
+ +Termus Edificius
+ +Termus + +Termus Edificius +Revit
Termus
Edificius  + Termus
2D

2D

2D
            
+ SoftwareBIM

+ SoftwareBIM

+ SoftwareBIM

SoftwareBIM

t + Revit
Energy Energy
Analysis Revit
Analysis Revit
Energy Revit
Energy
Analysis Energy
Analysis Analysis Energy
UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS

UNI/TS
ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE

ASHRAE
Thermal

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal

Thermal
 Allplan
 Allplan
  Allplan
   
                 

ISO

ISO

ISO

ISO

ISO

ISO

ISO

EN ISO
3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC

3D/IFC
planAllplan
+ AX-Energia
Allplan + AX-EnergiaAllplan + AX-Energia Allplan
+ AX-Energia +Builder
AX-Energia + AX-Energia + AX-Energia + AX-Energia
+

software

Design

EN

EN
plug-in

plug-in

plug-in

plug-in

AD
ArchiCAD
+ EcoDesigner
+ EcoDesigner ArchiCAD
STAR ArchiCAD 
STAR
+ EcoDesigner 
+ EcoDesigner STAR
 Edificius
 Termus
STAR
ArchiCAD
+   Edificius
 

+Termus
ArchiCAD

+Energy
  
EcoDesigner

  Edificius
  
 +
 EcoDesigner
STAR
 + Termus 

 
Analysis
   
STAR
      
 

 

 
         
Energy

Energy

Energy

Energy

Energy

Energy

Energy

Energy
SoftwareBIM

SoftwareBIM

SoftwareBIM

SoftwareBIM

SoftwareBIM

SoftwareBIM

dificius
tDesign Edificius
+ Revit
Energy+ +Termus
Revit
Energy
Analysis Edificius
+ +Termus
Revit
Energy
Analysis Edificius
+ +Termus

Revit
Energy
Analysis Edificius
+ +Termus
 
Energy
Analysis Edificius
+ Termus  
Analysis   
Revit  
+   +Revit
 Termus
Analysis +  
Energy                  
Design
Builder Builder Design Design Builder Design
Builder  
Builder     
    Design     
Builder      
  

  

  
     
plan + Allplan
+ ArchiCAD
AX-Energia
+ Allplan + ArchiCAD
AX-Energia + ArchiCAD + 
AX-Energia + 
Allplan +
 + ArchiCAD +
AX-EnergiaAllplan 
 


+ AX-Energia    
             
plug-in

plug-in

plug-in

plug-in

 Open
 studio
STAR STAR  STAR
+ STAR STAR        EN

EN

EN

EN

EN

EN

EN
AD
ArchiCADEcoDesignerEcoDesigner STAR
+ EcoDesigner STAR
EcoDesigner
ArchiCADSTAREcoDesignerArchiCAD EcoDesigner EcoDesigner EcoDesigner
Stand-alone

Stand-alone

Stand-alone

Stand-alone

            
           
                 
SoftwareBIM

SoftwareBIM

SoftwareBIM

dificius Edificius
t + Revit
Energy+ Termus
+ Revit
Energy
Analysis + Termus Edificius  Edificius
+ Termus
  + Termus
     Edificius
    +
 Termus
Edificius
 Design   +
BuilderTermus
               
Stand-alone

+ Revit
Energy
Analysis + Revit
Energy
Analysis + Revit
Energy
Analysis + Revit
Energy
Analysis + Revit
Energy
Analysis + Energy
Analysis Revit Analysis + Energy Analysis
software

software

software

software

Design
Open
plan Design
Builder
studio
Open Design
Builder
studio Design
Builder
Open 
 Design
Builder
studio
Open 

 
 Builder
studio
Open 

 
 

studio 
 
 
 
Design
 
 
 


 
 
Builder
  
  

Open

 
 studio 


  

   
 


  
  


 

  







 



   

  

 
  
  
+ Allplan
+ ArchiCAD
AX-Energia
+ Allplan + AX-Energia + AX-Energia Allplan + ArchiCAD
AX-EnergiaAllplan + AX-Energia
plug-in

plug-in

plug-in

AD
ArchiCADEcoDesignerEcoDesigner STAR
+ EcoDesigner 
STAR
EdificiusArchiCAD  
Simergy
STAR
Edificius 
+EcoDesigner + 

TermusEdificius 
+
 
STAR
+
Termus 
+
EcoDesigner

 
Termus   
STAR 
  
     
    
     

 
   
 
Stand-alone

Stand-alone

Stand-alone

Stand-alone

Stand-alone

dificius Edificius
+ Termus Edificius
+ Termus Edificius
+ Termus + Termus + Termus Edificius
SoftwareBIM

SoftwareBIM

SoftwareBIM

t + Revit
Energy + Energy
Analysis Revit
Analysis 
+ Revit
Energy  
+ Energy
Analysis 
Analysis  
Revit  
+  
Energy  Revit Analysis + 
Energy  
Analysis             
software

software

software

software

software

Design
Open
plan Design
Builder
studio
Open
Allplan
+ AX-Energia
Allplan + Design
Builder
studio
Open
AX-Energia
Allplan + Design
Builder
studio
Open
AX-Energia

Allplan
+ Design
Builder
studio
Open 


AX-Energia 

Allplan + Design
studio
Builder

AX-Energia 

 

Allplan + 
 
Design
Builder

AX-Energia

 

Allplan + 
 
Design
Builder

Open 


AX-Energia 
 + 


 

studio
Builder
 
AX-Energia 

 
 Design 

Open


 
 

studio 

Builder

 


   
 
 




  

  



 

 


  








  






  
 


   

  
  
 
 
plug-in

plug-in

plug-in

       +  


+                 
   


 

  
     
+

AD +Simergy
ArchiCAD +Simergy
EcoDesigner
ArchiCADEcoDesigner STAR
+ EcoDesigner 
Simergy
STAR  
Termolog
Simergy  + 
Simergy +    STAR    Simergy             
 ArchiCAD
 STAR
  +Revit
 EcoDesigner ArchiCAD
   
+Energy
EcoDesigner

  
   STAR
     
         

Stand-alone

Stand-alone

Stand-alone

Stand-alone

Stand-alone

Stand-alone

Stand-alone

dificius Edificius
+ +Termus Edificius
+ +Termus + +Termus  Edificius   +Termus
  Edificius     Termus
         
SoftwareBIM

SoftwareBIM

SoftwareBIM

SoftwareBIM

SoftwareBIM

SoftwareBIM

t + Revit
Energy Revit
Energy
Analysis Revit
Energy
Analysis Revit
Energy
Analysis + Revit
Energy
Analysis Energy
Analysis Revit
Energy
Analysis Analysis Analysis
software

software

software

software

software

software

software

Design
Open Design
Builder
studio
Open Builder
studio
Open Design
studio
Open 
 Design
Builder
studio
Open 

 studio
Builder

Open 
 


studio
Open 
 
Design
 
studio
Open 
 
 

  
studio
Builder
 
  Design 

Open


  
studio 
Builder


    
 


 
  
 


 


 







  




  
  


    
 

  
 

plug-in

plug-in

plug-in

plug-in

plug-in

plug-in

AD Simergy
ArchiCAD
+ Simergy
EcoDesigner
ArchiCAD
+ EcoDesigner Simergy
ArchiCAD
STAR
+ EcoDesigner ArchiCAD 

Simergy
STAR
+ EcoDesigner
 ArchiCAD 
 

Simergy
STAR
+ EcoDesignerArchiCAD
 
 

STAR
+ EcoDesigner 

ArchiCAD 
 

STAR
+ EcoDesigner 
 
 

Simergy
STAR
+ 

EcoDesigner 
 

STAR 
 


Simergy
STAR  

 

    
 

 
  
  

 
 

  


  

  
 
   
    
  
  + 
 + 
   

+
   
+

   
 

 
 


 
  

  

  
 




 


  


   
 
  
Stand-alone

Stand-alone

Stand-alone

Stand-alone

t + Termolog
dificius
Revit
Energy
Design
Termolog
Edificius
+ +Termus
Revit
Energy
DesignAnalysis
Builder
Edificius
+ +Termus
DesignEnergy
Analysis
Builder
Termolog
+ Termus
Design
Builder 
Analysis
Design
Termolog
Builder 
Revit
Design
Edificius

Builder
Termolog


Energy
Design Termus

Builder 

Revit
Analysis Edificius


Design
BuilderEnergy
  
 Termus

Builder  
Analysis

Termolog


  
  
   
 
  
 

   

   


 



 

 


software

software

software

software

Open studio
Open studio Open 
 studio
Open 

 studio
 
 

 
  
Open    
studio  
Open   studio  
        
 

  
         
Among the+   

stand-alone +     
 
plug-in,  
   
  

TermoLOG   
 
 


appears

 

to

 be the 


more  


 
complete   than  
  
Stand-alone

Stand-aloneStand-alone

Stand-aloneStand-alone

Stand-alone

Stand-aloneStand-alone

Stand-alone

Simergy Simergy Simergy Simergy


 Simergy
   Simergy
  +  Simergy
     Simergy
 
     Simergy
   
    
    
t + Termolog
dificius
Revit
Energy Termolog
Edificius
+ +Termus
Revit
Energy
Analysis Termolog
Edificius
+ +Termus
Energy
Analysis 
Termolog
Edificius
+ Termus
Analysis Edificius 
Termolog
+ Termus
 
Revit Edificius
+ +Termus
 

Energy 
Edificius
  
Termus
 
Revit
Analysis 
Edificius
  
Termolog
+Termus
Energy 

 
  
Termus 
Analysis 


Termolog
  

   

  
 



 
 
 





 
 




  


 


  

 
software

software

software

software

software

software

Design Design
Builder
Open studio
Open studio Design
Builder
Open Builder
studio
Open 
 studio
Open 

 Design
the
studio

Open 


competitors 
Builder

studio
Open 
 
Design
 
studio
Open  
Design 

 
Builder
 
studio  

Builder, 


  
 
Open 


 
  
  

Studio, 


 
 and 


  

Simergy, 


 

  based 



 
 on the 



  EnergyPlus 

  



The firstTheimportant
 first important
 difference
The
  first
difference
The
 concerns
 important
 first
 The
 concerns
important
 the
 first
difference
 IFC
  important
 the certifications.
difference
 IFC
 concerns
certifications.
difference
 
  concerns
Indeed,
the
 The

 IFC
 concerns
first
 Indeed,
the
it
certifications.
can

 IFC
important
 
 bethe
it
certifications.
seen
can

 IFC

  beIndeed,
difference
certifications.
seen

  Indeed,
it can
concerns

 be
Indeed,
it seen
can
  the beit
 IFC
seen
can
 certif
be s
Stand-alone

Stand-alone

Stand-alone

Simergy Simergy Simergy


 Simergy
      Simergy
  
    
Simergy
   
  
t + Termolog
Revit
Energy + Termolog
Revit
Energy
Analysis Termolog
+only
Revit
Energy
Analysis Termolog
+only 
Revit
Energy
Analysis + Termolog
 
Revit
Energy
Analysis Termolog
 
calculation
+onlyRevit
Energy
Analysis  Termolog
+only engine,
Revit
Energy
Analysis   Termolog
+only 
Energyand
Analysis    
therefore
Analysis Termolog
 combined
 
quite  
similar.  

 
  

Therefore, 


the 





 main 


 
parameter 


to 

 
the

choose it 
has
software

software

software

Design
Open Design
Builder
studio
Open that Design
Builder
studio
Open that the BIM
Builder
studio 
 the 
software
BIM

thatDesign
 
software

Open 

combined
that the 
Builder

studio 
combined
BIM
 that with 
the 
software
the
Design
 
OpenBIM with 

plug-in
the
 
software
Builder
 
studio 
combined
the
BIM  


plug-in
has
software
 
the
 with 

has


third 
combined
that
the
the 
 

requirement
with plug-in
only
third  
the
 the 

requirement
with plug-in
has

BIM
 
the
(e.g.,
thesoftware  
plug-in
has
third
the (e.g.,
the 


requirement
has
third
combined
the

 the 

requirement
third

 with
(e.g., 
requirement
the
 (e.g.,
plug-in 

the(e.g.,


Simergy Simergy The
Simergy firstThe 
important
Simergy firstThe 
important
Simergy first 
difference
The 
important
Simergy first  
difference
The 
concerns
important
Simergy 
first  
difference 
concerns
important
the
Simergy   
difference
IFC  
concerns
the  
 
certifications.
difference
IFCThe  
concerns
the 
 
 
certifications.
first IFC   
concerns
important
Indeed,
the 
 
 
certifications.
The IFC 
first
Indeed,
the
it 

  
certifications.
difference
can IFC
important
beIndeed,
it 

 
 
certifications.
seen
can concerns
beIndeed, 


difference
it seen
can 
 beIndeed,
the
it 


seen
can 
concerns
IFC be it 
 
certifications.
seen
can the be IFC 
 certif
seen Ind
Stand-alone

Stand-alone

Stand-alone

Termolog Termolog
buildingSMART buildingSMART 
Termolog 
Termolog
certification).
buildingSMART is the

certification). versatility,
buildingSMART  buildingSMART or  the
Termolog
certification). 
 presence
 certification).
certification).  of
 
Termolog all functions
 
buildingSMART   in a single
 
 work




 
certification). environment,
  
  in order

   to
software

software

software

Design Design
Builder that only
Design
Builder that the only
BIM
Design
Builder 
that
 the
Design
Builder
software
only
BIM

that
 the
Design
software
only
Builder
 

combined
BIMthat the 
software
only
Design
Builder
 

combined
BIM with 
the 
Design
Builder
  
software 
combined
the
BIM with 

plug-in
 
software
Builder
   
combined
the that with 



plug-in
has 
only
the
combined
the
 
with 

plug-in
has
third
the

 
 
that
the
BIM
the  

requirement
with
 plug-in
has
only
third  
software
   
the
the
 the 


requirement
plug-in
has
third

 
BIM
 
combined
(e.g.,
the 



requirement
software
has
third
the (e.g.,
the 



requirement
with third
combined
the the
(e.g., 



requirement
plug-in
the with
(e.g., has


the
the (e.g.,
the
plug-in 

third
the has
req
Open studio
SimergyOpenSimergy studio
Open
The
Simergy studio
firstThe
stand-alone
important
 firstThe 

stand-alone
important

BEM limit
first Open

difference
The
 
important
Simergy

software,
BEM the
first 
use
studio


stand-alone
difference
The
concerns
important

software,
even of 
first

other
Open


difference
The
concerns
stand-alone
if important
the
Simergy
 
BEM
equipped
even software.
studio

first

  
difference
IFC
The

stand-alone  
concerns
important
the

software,
if BEM
equipped 



certifications.
first
difference
IFC

with The
 
concerns
important
 the

software,
BEM
even
tools 



with
certifications.
first
difference
IFC
 
 
software,
if
for 
concerns
important
Indeed,
the

equipped
even
tools
the 

 

certifications.
difference
The IFC  
concerns
first
 Indeed,
the
it
construction
if
for stand-alone
equipped
even the 




with 
if

certifications.
difference
can IFC
important
concerns
 beIndeed,
the
it
construction
equipped
tools 






with
of 


certifications.
seen
can IFC
BEM aconcerns
for beIndeed,
tools
the 

difference
the
it 



with 



certifications.
seen
can IFCa be
software,
of Indeed,
the
it
construction
for tools
the 



certifications.
seen
can
concerns



IFC
even be
Indeed,
it 

certifications.
construction
for seen
thecan
if 


of the
a be
equipped Indeed,
itIFC
construction 


 acertif
seen
can


of be
Ind
it sco
with
Stand-alone

Stand-alone

Stand-alone

Termolog Termolog
buildingSMART Termolog
buildingSMART Termolog
buildingSMART Termolog
certification).
buildingSMART Termolog
certification).buildingSMART Termolog
certification). Termolog
certification). certification). buildingSMART buildingSMART certification). certification).
The versatility suggested adopting an integrated BIM + BEM plug-in solution. Itthird
software

software

software

software

software

software

Open studio
Open that
BIM only that
model,
studio
Open BIM the only
BIMthat

cannot
model,
studio
Open the
software
only
BIM

match
cannot
studio
Open that

BIM the
software
only
combined
theBIM

match
studio 
model,
Open that
BIM the
software
software only
combined

the BIM

cannot
model,
studio
Open that
BIM withthe
software

software only
combined
 the

dedicatedBIM

match
cannot
model,
studio
Open that
 with plug-in
the
software
 only
combined

dedicated
thethe
BIM

match
to
studiocannotthat
BIM with plug-in
has
the
software

software 
 only
combined
 the

the
in BIM
the
match
to  with

terms
BIM plug-in
has
third
the
software

software 
 combined

dedicated
thethat
in the
BIM

BIM the

of requirement
with

terms plug-in
has
only
third
softwaresoftware
 

functions, combined

dedicated
model, the

to the

of the
requirement
with
BIM plug-in
has
third


BIM

functions, combined

dedicated
cannot the
(e.g.,
the requirement
interoper-
in
to with
software
terms
BIM plug-in
has
third


the
match
  the
(e.g.,
the
interoper-
in
to of requirement
with
plug-in
terms
BIM has
third
combined


the


functions,
the inthe
(e.g.,
the requirement
software
of plug-in
terms has
third


the

functions, with
(e.g.,
the
interoper-
of requirement
has
third
the
dedicated the

 
functions, (e.g.,
the
plug-in
interoper-requireme
to the

for (e.g.,
interop
BIM has
req in
Simergy
Termolog Simergy
Termolog The
Simergy
Termolog firstThe
stand-alone
important
 first 

stand-alone
The 
important

BEM 
difference
The

stand-alone
Simergy

software,
offers BEM
Termolog first 


stand-alone
adifference
The
concerns
important

software,
much BEM
even 
first
 

concerns
stand-aloneimportant
the
Simergy
software,
if
larger BEM
equipped
even
Termolog 

 
package 
difference
IFC
 
the

software,
if BEM
equipped
even 


of 
certifications.
difference
IFC

with The 
concerns

software,
if equipped
even
tools
features 



certifications.
first
stand-alone
with if 

for 
concerns
important
Indeed,
the

equipped
even
andtools
the 
The

with 
IFC
 
first
 Indeed,
the
it
construction
if
for
greater BEM
stand-alone
equipped
tools
the 



with  
certifications.
difference
can IFC
important
 be
software,it
construction
for tools
the
interoperability 



with
of 
certifications.
seen
can BEM aconcerns
beIndeed,
construction
for even
tools
the 
difference
seen




software,
of Indeed,
the
itthe
construction
if
for
a equipped
than 

can
concerns


of
the IFC
even beit
construction
astand-alone 
with
ifof 
certifications.
seen
can the
a be
equipped IFC
tools 

seen
 acertif

of Ind
with
th
buildingSMART
ability, buildingSMART
ability,and buildingSMART
complexity.andcertification).
buildingSMART
complexity.
ability, certification).
The buildingSMART
adoption
ability,
and certification).
The buildingSMART
complexity.
adoption
ability,
and certification).
of buildingSMART
complexity.
the and certification).
BIM
of
The buildingSMART
complexity.
the Software
adoption certification).
BIM
The certification).
Software
adoption
+has
of
The buildingSMART
plug-in
ability,
the certification).
adoption
+BIM
of plug-in
combination
the
and Software
BIM
of
complexity. certification).
combination
the Software
+BIMcan
plug-in Software
The +third
can
plug-in
combination
adoption + plug-in
combination
of has the
can combination
BIM canSoftwa
that
BIM only The that
model,
BIM theonly
first BIM
cannot
model,
The BIM
important the
software
firstTheBIM
match
cannot
model,that
BIM
important software
first only
combined
the
match
cannot
model,
difference
The that
BIM
important the
software
first only
combined
the BIM
match
cannot
model,
difference
The
concerns
important withthe
software
software
first the
dedicated
the BIM
match
cannot
difference
The with
concerns
important
the plug-in
software software
first combined
dedicated
thethe
match
to
difference
IFC
The that
BIM
BIM
concerns
important
the plug-in
has
software only
combined
dedicated
the
in
to
certifications.
first the
model,
difference
IFCThe with
terms
BIM
concerns third
the
software
dedicated
important
the that
in
to
certifications.
first
difference
IFC the
BIM
the
cannot
BIM of requirement
with
terms
BIM
concerns plug-in
important
Indeed,
the only
third
software
functions,
dedicated
model, in
to
certifications.
difference
IFC the
match
of the
requirement
terms
BIM
concerns plug-in
has BIM
functions,
Indeed,
the
it cannot combined
(e.g.,
the
interoper-
the
in
to
certifications.
difference
can IFC of software
terms
BIM has
third
software
concerns
be the
functions,
Indeed,
the
it match (e.g.,
the
interoper-
in
certifications.
seen
can IFC of requirement
with
terms combined
the
functions,
concerns
be the
dedicated
Indeed,
the
it the
interoper-requirement
software
certifications.
seen
can IFC of
be plug-in
functions,
Indeed,
the
it with
(e.g.,
interoper-
to
certifications.
seen
can IFC the
dedicated
beBIM
Indeed,
it the (e.g.,
the
plug-in
interoper-
in
certifications.
seen
can terms
be third
to
Indeed,
it seen
cantheBIM ofhas
bereq
itfusin
Ind c
Simergy
Termolog Simergy
Termolog
guarantee Simergy
The
Termolog
guarantee a 
Simergy
stand-alone
The 
faster a 
Simergy

stand-alone
The 
BEM
workflow.
faster guarantee 

stand-alone
solution 
Simergy

software,
The BEM
Termolog
workflow.Itguarantee is a 


stand-alone
free 
faster
offered
Simergy

software,
The BEM
even
Itguarantee
from
is a
 

by
 
stand-alone 
Simergy
software,
if
The BEM
equipped
even
Termolog
workflow.
free
faster
possible
from 
TermoLOG.

a 

stand-alone
if
The  

software,
BEM
equipped
even
workflow.
faster
possible
It 



 
stand-alone
with
simplifications
is 
 
Furthermore,
software,
if
The BEM
equipped
workflow.
free even
tools
It 



 
stand-alone
with 
 
software,
if
for
simplifications
from
is free 

BEM
equipped
even
tools
guarantee the
possible
Itor
from 


with
The
is 

 
Revit

software,
construction
if
for BEM
stand-alone
equipped
even
tools
the
misinterpretations
free possible 

+


with  
Energy

software,
construction
if
for
simplifications
or
afromfaster equipped
even
tools
the
misinterpretations
possible 




with
of 


Analysis
BEM
construction
if
for
simplifications
workflow. a equipped
even
tools
the 





with 

software,
of package
construction
if
for
a is
simplifications
or equipped
tools
the 




with
misinterpretations
It or freeof even is
construction
for
afromtools
the 

ifnot

with
misinterpretations
or of  a the
equipped
construction
for tools
misinterpretati
possible the 



of constr
for
a with
simpl tho
buildingSMART
ability,
that only buildingSMART
ability,
that and the complexity.
only
BIMability,
that andcertification).
the
software
only
BIM buildingSMART
complexity.
ability,
that andcertification).
The
the
software
only
combined
best BIM buildingSMART
complexity.
adoption
ability,
that and The
the
choice complexity.
software
only adoption
combined
BIM that
accordingand
withcertification).
of
The
the complexity.
the
software
only
combined
BIM adoption
that
with certification).
BIM
of
The
plug-in
the the
software
toIFC only
combined
itsBIM buildingSMART
Software
adoption
ability,
that with BIM
of
The
plug-in
versatility.has
the the
software
only
combined
BIM
the Software
adoption
and
with+BIM
of
plug-in
has
third
the buildingSMART
plug-in
ability,
softwarecomplexity.
the
combined
Indeed,BIM
the certification).
Software
+BIM
of
requirement
with plug-in
plug-in
has
third combination
the
and
software Software
combined
itthe the
needs +BIM
complexity.
The
requirement
with plug-in
plug-in
has
third certification).
combination
Software
adoption
combined
to the
(e.g.,
the
be + can
requirement
with plug-in
plug-in
has
third
thecombination
the The
(e.g.,
accompaniedthe + ofcan
plug-in
requirement
with
plug-in
has
third combination
theadoption
the
(e.g.,
the BIMcan
requirement
byplug-in
has
third
thecombination
other Software
of
(e.g.,
the the
can
requirement
has
third
the
plug-ins BIM
(e.g.,
the + can
requiremeplug-in
third
theSoftwa
(e.g.,
req
BIM
of theThe model,
BIM
data, first
ofstand-alonethe cannot
model,
The BIM
important
resulting
data, firstmatch
cannot
model,
The BIM
important
offirst
resulting
from the
match
cannot
model,
difference
the BIM
important
exporting
from
data,
of software the
match
cannot
model,
difference
the BIM
concerns
exporting
resulting
data,
to of software
dedicated
the
match
cannot
model,
difference
The
external
the BIM
software
concerns
the
resulting
from
data,
to dedicated
first the
externalmatch
to
cannot
model,
software BIM
BIM
concerns
important
the
exporting
resulting
from software
dedicated
the
in
match
to
cannot
model,
certifications.
IFCThe
software
exporting
from terms
BIM
software
the
from
to dedicated
the
in
match
to
cannot
BIM
certifications.
first
difference
IFC
external
a of
exporting
different
from
of terms
BIM
software
functions,
important
toIndeed,dedicated
model, in
match
to
certifications.
the external
a
software
data, of terms
BIM
software
itfunctions,
concerns
differentIndeed,
software
to dedicated
cannotinteroper-
the
in
tosoftware
difference
can
resulting
external
software
fromof
beterms
BIM
software
itfunctions,
Indeed,
the
house.dedicated
match
seen
can
a interoper-
in
to
IFC
software
from of terms
BIMfunctions,
concerns
be
different
from it the
dedicated
interoper-
in
to
software
certifications.
house.seen
can
exporting
a of
be
different
from terms
BIM
thefunctions,
seen interoper-
in
tosoftware
IFC ofdedicated
terms
BIMfunctions,
Indeed, interoper-
insoftware
ofterms
certifications. itfunctions,
to
can interop
BIM of
be
Indfusin
Termolog Termolog
guarantee
buildingSMART The
Termolog
guarantee
buildingSMART The 
Termolog
a fasterguarantee
buildingSMART 
stand-alone
BEM
Termolog
aworkflow.
faster guarantee
certification).
buildingSMART 
a(such 
software,
The BEM
Termolog
workflow.
fasterIt
certification).guarantee is
buildingSMART 
stand-alone
software,
The even
Termolog
aworkflow.
free
fasterIt
certification).
as Insight from
is
buildingSMART 
stand-alone
if 
BEM
equipped
even
Termolog
aworkflow.
free
faster
possible
It
certification).
for from 
 
if 
software,
BEM
equipped
iscertification).
buildingSMART
solar workflow.
free possible
It 

simplifications
guarantee
fromis
buildingSMART
analysis) 
with 
free  
software,
The even
tools
possible
It
certification). 
stand-alone
with if
simplifications
from
is afree 
for
faster 
equipped
even
tools
guarantee the
possible
certification).
to work. 
The 
simplifications
or
from  
construction
if
for BEM
stand-alone
equipped
athe
misinterpretations
workflow.
possible
certification).
Finally, 


with
simplifications
or faster 
software,
construction
tools
misinterpretations
for It 


with
of 
BEMfor
simplifications
orworkflow.
is
these a reasons,
even
tools
the
misinterpretations
free or
from 

 asoftware
software,
of construction
if
for equipped
the
misinterpretations
It possible
is or
a
free
the 

different
to
even external
house.
construction 


with
ifof
misinterpretations
from
ArchiCAD equipped house.
software
a tools
simplifications
possible + 
simpl
of for hou
a with
orthfr
ability,
that
Moreover, only ability,
that and
Moreover, the complexity.
only
BIMability,
that
regarding andthe complexity.
software
only
BIM
regardingability,
the and
Moreover, The
the complexity.
software adoption
combined
BIM
compliancetheability,
and
Moreover, The complexity.
software adoption
combined
compliance
regarding ability,
that
of and
with
Moreover, of
The
the complexity.
the
only
combined
regarding adoption
ability,
and
with
software
theof BIM
of
The
plug-in
the
the complexity.
the
BIM
compliance
regardingSoftware
adoption
ability,
that
software
the and
with
with BIM
of
The
plug-in
has complexity.
the
software
only
compliance
the Software
theadoption
and
of +BIM
of
The
plug-in
withhas
third
the plug-in
ability,
complexity.
the
combined
parameter
the
complianceBIM Software
Moreover,
the adoption
+BIM
of
The
requirement
software
of has
thirdplug-in
combination
the
and
software
parameter
the the Software
adoption
+BIM
of
complexity.
The
requirement
with
relating
software
of thirdplug-in
combination
the Software
adoption
combined
(e.g., +BIM
ofcan
requirementplug-in
plug-in
thecombination
the Software
The
(e.g.,
with+BIM
of
hascan
plug-in
combination
theadoption
the Software
(e.g., +BIMcan
plug-in
thirdplug-in
thecombination
Software
of +has
the
can
plug-in
requirementcombination
BIM
the +third
can
plug-in
Softwa
combi
(e.g.,
req
BIM
of theThe model,
BIM
data, first
ofstand-alonethe cannot
model,
Theimportant
resulting
data, first
ofstand-alone
the match
cannot
The BIM
important
resulting
from
data, first
ofstand-alone
BEM the the
match
model,
difference
exporting
resulting
fromBIM
important
data,
of
software,
The BEM software
the the
cannot
model,
difference
concerns
exporting
resulting
stand-alonefrom
data,
to
software,
The BEM
even software
dedicated
match
cannot
difference
The
external concerns
the
exporting
resulting
from
stand-aloneto
software,
if BEM
equipped
even dedicated
first the
externalmatch
to
IFC
software BIM
exporting
stand-alone from
to
software,
if
The BEM BIM
concerns
important
the
of
equipped
even software the
in
to
external
the model,
certifications.
IFCThe
software
exporting
from
stand-alone
with terms
BIM
software
the
data,
to
software,
if BEM dedicated
external
equipped
even
tools in
cannot
BIM
ofof
certifications.
first
difference
IFC
asoftware
different
resulting
from
stand-alone
with to
software,
if
for terms
BEMthefunctions,
important
Indeed,
equipped
even
tools dedicated
model,
external
the match
to
certifications.
asoftware
with data, of
different
from itwith
BIM
concerns
software
from
software,
regarding
Indeed,
construction
if
for BEM
equipped
even
tools
the
functions,
cannot
difference
can
resulting
the asoftware
with
relating
the
to
software
interoper-
the
in
to be
exporting
different
from itwith
terms
BIM
software
com-
house.
software,
construction
if
for equipped
even
tools
the
parameter
software
Indeed,
the match
seen
can
aof
with
the
from
the
to
interoper-
in
IFC of
different
from
compliance
with
com-
terms
software
to
house.
parameter
functions,
aconcerns
be it the
dedicated
exporting
construction
if
for external
equipped
even
tools
the
relating
the
software
certifications.
seen
can of
be
aofdifferent
with the
asoftware
house.
construction
if
for
parameter
functions,
seen
equipped
tools
the
of
software
with
of to
relating
to
interoper-
to
IFC the
software
com-
dedicated
BIM
Indeed,
external
house.
construction
for
afromtools
the
with
of
software
relating
from
to
interoper-
in
certifications. termscom-
ittheto
can
house.
software
construction
for
a tools BIMwith
aofdiffere
to
aof
be
constr
for Ind co
fu
thsin
fr o
guarantee
buildingSMART
pliance guarantee
buildingSMART
pliance witha fasterguarantee aworkflow.
buildingSMART
current faster guarantee
certification).
with current
legislation,
pliance aEcodesigner
workflow.
fasterItguarantee
certification).
legislation,
pliance is amany
workflow.
free
faster
certification).
with current
pliance
STAR
ItbuildingSMART
guarantee
from
is
with amany
ofworkflow.
free
faster
them
combination
possible
It
guarantee
currentfromis
legislation,
with of aworkflow.
free
faster
do possible
themItnot
simplifications
guarantee
fromis
buildingSMART
current
legislation,
has
amany
workflow.
free
faster
certification).
do
operate
been
possible
It
simplifications
from
is
legislation,
not ofamany
workflow.
free
faster
operate
selected.
guarantee
possible
It
according
pliance
them simplifications
or
from
is
certification).
of many
do aThe
misinterpretations
workflow.
free possible
It
according
them
with not
to of the
parametric
simplifications
or
from
is
faster
misinterpretations
free
current
do possible
operate
themIt
simplifications
or
from
notworkflow.
is
Italian
to the
do
operate
modelling
misinterpretations
free possible
simplifications
or
from
legislation,
according
not
Italian misinterpretations
It possible
is
operate
of
simplifications
or
accordingtofree
many
ArchiCAD
misinterpretations
the simplifications
or
according
of
Italian
to misinterpretati
possible
them
the or
Italian
todo misinte
thesimpl
not or
Ital
op
ability,
that
Moreover,
BIM only ability,
that
model,
BIM and
Moreover, the complexity.
only
BIMthat
regarding
cannot
model,
BIM and
Moreover, the complexity.
software
only
BIM
regarding
match
cannot
model,ability,
the
Moreover,
BIM The
the
software
the
hasmatch
cannot
model,adoption
combined
BIM
compliance
regarding
theability,
BIM
been and
Moreover, The
software thecomplexity.
software
match
cannot
model,adoption
combined
compliance
regarding
thethat
of
BIM
implemented and
withof
the
software complexity.
the
only
combined
compliance
regarding
dedicated
the
match
cannot
model, with
software
theof
BIM BIM
of
softwareThe
plug-in
the
the
dedicated
thethe
BIM
compliance
match
to
cannot
model,
and Software
adoption
ability,
that
software
theof
BIM
BIM with
Moreover,
with BIM
The
plug-in
has
softwaresoftware
the only
the
dedicated
updated. the
in the
compliance
match
to Software
adoption
and
software
cannot
model, of +
with
terms
BIM of
plug-in
has
third
the plug-in
parameter
the
software ability,
complexity.
the
combined
BIM
the
regarding
dedicated
ThetheMoreover,
in
match
to software
cannot
of of
with
terms
BIM +BIM
of
requirement
has
thirdplug-in
combination
parameter
softwarethe
functions,
model dedicated
the
inthe
and
softwarethe Software
relating
software
match
to ofthe with BIM
complexity.
The
requirement
with third
regarding
terms
BIM
can combination
parameter
software compliance
functions,
dedicated Software
adoption
combined
the
(e.g.,
relating
the
to
interoper-
the
in
to of
guarantee +
with
terms
BIM com-can
requirementplug-in
plug-in
the
parameter
software the
functions,
dedicated The
(e.g.,
with
relating
the
to
interoper-
in
to of of + of
hascan
compliance
com-
terms
BIM
full plug-in
combination
theadoption
parameter
the
functions,
dedicatedthe
(e.g.,
the
relating
to
software
interoper-
in
to of BIM
plug-in
third
com-
terms
BIM
compatibility the
functions,combination
of Software
of
relating
to
interoper-
in
to of the
with the
com-
terms
BIM can
requirement
has software
functions,
with BIM
the
to
interoper-
in of terms
the +
com-can
plug-in
third Softwa
paramet
functions, (e.g.,
with
interop
of req
fu
of
guidelines theThedata,
of
guidelines first
the Theimportant
resulting
data,
stand-alone first
ofstand-alone
the The important
resulting
from
data,
of
BEM first
difference
the The
stand-alone important
exporting
resulting
from
data,
of
software,
BEM first
difference
the The
concerns
important
exporting
resulting
from
data,
to of
software,
BEM
even first
difference
The
external
the concerns
important
the
exporting
resulting
from
data,
to
software,
if equipped
even first
difference
IFC
ofcalculation.
external
the The
softwareconcerns
important
the
exporting
resulting
stand-alone
if from
data,
to of
equipped
even certifications.
first
difference
IFC
external
the The
concerns
software
with important
exporting
resulting
from
if the
from
data,
to
BEM certifications.
first
difference
IFC
external
equipped
tools aand
software concerns
exporting
differentimportant
resulting
from
of
stand-alone
with Indeed,
from
to
software,
for the
certifications.
tools difference
IFC
external
8the asoftware
with data,concerns
exporting
different
from Indeed,
the
it
certifications.
software
from
to
construction
for BEM
even
tools difference
can IFC
resulting
external
the asoftwareconcerns
beIndeed,
the
exporting
different
from it
certifications.
software
tohouse.
software,
construction
if
for seen
can IFC
external
equipped
the aof aconcerns
software
from be
different
from Indeed,
the
it
certifications.
software
to
house.seen
can IFC
8exporting
construction
even external
aof
software
with be
different
from Indeed,
the
it
certifications.
ifasoftware
house.seen
equipped
tools can
aof IFC
software be
Indeed,
different
to
from it
certifications.
software
for seen
external
afromhouse.
8thecan
a different
with from be
Indeed,
it seen
software can
house.
software
construction
tools aNeverth be
differe
for Ind
itthfr
softw
hou sco
guarantee
buildingSMART
pliance
ability, guarantee
buildingSMART
pliance
ability, with
and afor stationary
faster
complexity.
ability,
and afor
buildingSMART
current
pliance
stationary
workflow.
faster guidelines
guarantee
certification).
with current
legislation,
pliance
complexity.
ability,and
and
Theworkflow.dynamic
certification).
with
guidelines
Itadoption
guarantee
current
legislation,
pliance
complexity.
EcoDesignerability, with
and
andfor
The
dynamic
stationary
guidelines
iscertification).
amany
free
fasterItadoption
complexity.
ability,
calculation.
from
andis
buildingSMART
current
legislation,
with
of
for
amany
workflow.
free
The
Star faster
them
stationary
possible
currentfrom
complexity.
the adoption
ability,
and
plug-in,
and
legislation,
BIM
of
The
for
many
do
Nevertheless,
dynamic
workflow.
them
stationary
possible
Itnot
complexity.
the Software
adoption
ability,
and
making
and
simplifications
guarantee is
buildingSMART
legislation,
pliance BIM
of
Thefree Nevertheless,
operate
them
dynamic
It
certification).
many
do
calculation.
not
with
complexity.
the Software
adoption
and+BIM
the of
The do
the
guidelines
simplifications
from
is amany
free
faster
operate
dynamic
guarantee
according
pliance
them
plug-in current
not
calculation.
possible
or
from
complexity.
the Software
transition
software
adoption
+BIM
of
The do
theNevertheless,
operate
according
them
with
plug-in
8for
calculation.
misinterpretations
workflow.
possible
certification). software
legislation,
not
combination
the Software
adoption
from +BIM
of
The
examined
stationary
simplifications
or
ato faster
the
Nevertheless,
misinterpretations
current
do
operate Itnot
according
plug-in Italian
to
combination
the
the Software
adoption
+BIM
of
examined
the
the
simplifications
workflow.
is free
many
can
Nevertheless,
operate
and
or
from
legislation,
according
plug-in
software
Italian
to
combination
the Software
model +BIM
of
dynamic
the
the
can according
them
plug-in
8free
misinterpretations
It possible
is or software
Italian
to
combination
theto many
Software
+BIM
the
examined
the
do
can
the calculation.
plug-in not
of
software
misinterpretations
Italian
to+has
combination
BEM Software
examined
simplifications
possible
them
the
operate
can
plug-in Italian
combination
model do
+third
examin
can simpl
not
accord
plug-in
combi orop
that
Moreover,
BIM
comply only that
Moreover,
model,
BIM
comply the
(exceptonly
BIMthat
regarding
Moreover,
cannot
model,
BIM the
software
(except
for only
BIM
regarding
match
cannot
model,
Allplan)that
the
Moreover,
comply the
for software
only
combined
the BIM
compliance
regarding
matchthe
cannot
Allplan)
with that
Moreover,
comply the
software
software
(except only
combined
the
the BIM
compliance
regarding
matchthe
with that
of
BIM
ASHRAE
comply with
Moreover, the
software
the
software only
combined
the
dedicated
(except
for the
the BIM
compliance
regarding
model,
Allplan)that
with
software
theof plug-in
the
Moreover,
software
ASHRAE software
the only
combined
dedicated
(except
for to
140-2007 the
BIM
compliance
regarding
cannot that
software
theof
BIM
Allplan)
with BIM with
Moreover,
with
forplug-in
has
the
software
the only
combined
the
dedicated
in BIM
compliance
regarding
the
match
to
model,
140-2007
the
standards
Allplan)
with with
software
theof
terms
BIM plug-in
with
ASHRAEhas
third
thesoftware
combined
parameter
the the
thein
to the
complianceBIM
regarding
Moreover,
the
cannot
of
standards
comply
with requirement
with
software
theof
with
terms
BIM plug-in
has
third
software software
functions,
relating
ASHRAE 140-2007
the combined
parameter
the inthe
compliance
match
of requirement
with
relating
the
software
theof
with
terms
(except plug-in
has
third
regarding
functions,
relating
ASHRAE
tothe combined
parameter
the
dedicated the
(e.g.,
compliance requirement
with
relating
the
to
software
of
interoper-
the
140-2007 of
standards
for plug-in
withhas
third
com- the
parameter
the
software the
functions,
validity
tothe the
(e.g.,
requirement
with
relating
the
to plug-in
software
interoper-
Allplan)to
140-2007
standards of has
third
the
compliance
with
BIM com-
parameter
the
dedicatedthe
(e.g.,
requirement
relating
the
to plug-in
software
interoper-
in withhas
third
com-
terms the
parameter
of
to (e.g.,
requirement
relating
the
to
of the third
with
BIM com- the
parameter (e.g.,
software
functions,
in requireme
relating
the
totermscom-the
paramet (e.g.,
req
relati
with
to
interop
of co
fu
of theThe
guidelines
guarantee data,
of
guidelines
guarantee theresulting
data,
stand-alone
The
afor stationary
guidelines
faster
guarantee resulting
from
stand-alone
The
afor of
BEM
stationary
workflow.
faster guidelines
guarantee the
and exporting
stand-alone
for
aalmost from
data,
workflow.
faster of
software,
BEM
dynamic
stationary
guidelines
Itguarantee the
and exporting
resulting
for data,
to
software,
BEM
even
dynamic
stationary
iscertification).
amany
workflow.
free
fasterItguarantee
instantaneous. external
resulting
from
calculation.
from
isand
for
amany to
software,
if
The equipped
even
dynamic
workflow.
free
faster external
stationary
possible software
exporting
stand-alone
if
calculation.
and
Itguarantee
fromis amany from of
equipped
even
Nevertheless,
dynamic
workflow.
free
faster
The guidelines
possible
Itnot the
software
with exporting
from
if
The
calculation.
and
simplifications
guarantee
fromis amany
adopted data,
to
BEM external
equipped
tools asolution
Nevertheless,
workflow.
free
faster dynamic different
resulting
from
calculation.
possible
It for of
stand-alone
with the to
software,
for the
tools
guidelines
simplifications
from
is amany external
8the
Nevertheless,
workflow.
free
faster asoftware
with
stationary data,
different
calculation.
possible
It software
the
simplifications
or
from
is software
from
construction
for BEM
even
tools resulting
Nevertheless,
8for
misinterpretations
workflow.
free possible
solves It software
exporting
from
issoftware
and software
examinedIthouse.
software,
construction
if
for equipped
stationary
the
simplifications
or
from aof
Nevertheless,
dynamic
8of from
issoftware
misinterpretations
free
one possible avalidity
relating
different
from to
examined
the
simplifications
or
from house.
and
with
standards
exporting
construction
even external
aof
with
8calculation.
misinterpretations
free
the possible software
relating
different
examined
dynamic
the
simplifications
or
from
most
to
the
software
ifacommon
equipped
tools the
8 software
misinterpretations
possible
ASHRAE
software
of to validity
relating
examined
simplifications
or
tothe
software
for external
house. thefrom
aNevertheless,
with
calculation.
misinterpretations
validity
examined
simplifications
or
140-2007
to
house.
misinterpretati
problems or athe
software
construction
tools Neverth
the
misinte
valid
differe
for or
sto
8thfrs
buildingSMART
pliance
ability,
of the buildingSMART
pliance
ability,
calculation
of with
and the buildingSMART
current
pliance
complexity.
ability,
and
calculationcertification).
withadopted. buildingSMART
current
legislation,
pliance
complexity.
of andcertification).
with
The
the
adopted.
This buildingSMART
current
legislation,
pliance
complexity.
adoption
calculation
of with The
does
the This buildingSMART
current
legislation,
pliance
adoption
ability,
calculation
of notcertification).
with
of
The
does
the them
the
adopted.
mean buildingSMART
current
adoption
and certification).
legislation,
pliance
withBIM
calculation
not of do them buildingSMART
current
legislation,
pliance
complexity.
the
adopted.
that
mean
This Softwarewith
ability,
the certification).
BIM
of
doesdo
operate
them
the
adopted.
that current certification).
legislation,
not
with
Software
calculation
This and
the
not of
+BIM
The
doesdo
operate
according
pliance
them
plug-in current
complexity. +certification).
legislation,
not
Software
calculation
mean
ofThis adoption
the
not
toolsof many
do
operate
according
them
with
plug-in
does
that legislation,
not
to
combination
calculation
mean are the
not+of
toolsThethe
current
many
do
operate
according
them
plug-in not
Italian
to
combination
wrong,
that the adoption
calculation
meanare the of
BIM the
many
do
can
adopted. operate
legislation,
according
them not
Italian
to
combination
wrong,
but
that Software
calculation
the of
tools the
do
can
This
butoperate
according
them
the not
Italian
to
calculation
are many
does+BIM
tools the
do
canoperate
according
plug-in
wrong, not not
of
Italian
to
Software
are toolsthem
meanthe
operate
according
Italian
to
combination
wrong,
but are do the
+wrong,
that not
accord
plug-in
but the Ital
toop
ca
Moreover,
BIM
comply
of the Moreover,
model,
BIM
comply
data,
of regarding
(except
the cannot
model,
BIM
comply
resulting
data,
of regarding
(except
forthe matchthe
cannot
model,
Allplan)Moreover,
comply
resulting
from
data,
of compliance
(except
forthe the
in matchthe
cannot
Allplan)
with
the
exporting
resulting
fromMoreover,
comply
data,
of compliance
software
(except
for regarding
the
thematch
integration
the of
Allplan)
with
exporting
resulting
fromBIM
ASHRAE
data,
to of the
regarding
software
dedicated
(except
for the
the
external
the software
the
model,
Allplan)
with of
between
exporting
resulting
from
data,
to of the
software
ASHRAE
for compliance
dedicated
external
the to
140-2007
the
software software
the
cannot
exporting
resulting
from Moreover,
BIM
Allplan)
with BIM
ASHRAE
comply
data,
to of with compliance
dedicated
energy in the
match
to
model,
140-2007
the
standards
external
the with
software
exporting
resulting
from of
with
terms
BIM
ASHRAE
from
data,
to parameter
the
(except regarding
the
140-2007
and the Moreover,
in
to the
software
cannot
of
standards
external
a comply
software
exporting
different of
terms
BIM
relating
resulting
from ASHRAE
BIM.
from
to forparameter
softwarethe
functions,
140-2007inrelating
software
match
ofthe
standards
external
a Allplan)
software(exceptwith
regarding
terms
relating
Indeed,
exporting
different
from to
software
from
to compliance
functions,
dedicated
140-2007
the relating
the
to
interoper-
the of
standards
external
asoftwarewith
iffor with
validitycom-
relating
exporting
different
from to
the
software
to parameter
software the
functions,
Allplan)
house. the
the the
to
interoper-
standards
BIM
external
asoftware of
compliance
tosoftware
BIM com-
validityparameter
dedicated
relating
different
from ASHRAE
totomodel
house. the
with
external
asoftwarerelating
software
interoper-
in terms
validity
relating
different
from to
the
is
software
house. of
to
140-2007
athe relating
ASHRAE
imported
software toBIM
of the
with
com-
validity
different
from to
software
house.athesoftware
functions, the
to
insoftware
standardstermscom-
validity
and
different
from paramet
140-2007
house.a with
interop
of
rela
differe
softw
houfu
st
guidelines
guarantee
that Theguarantee
theseguidelines
that stand-alone
The
afor stationary
guidelines
faster
programs
theseguarantee stand-alone
The
afor BEM
stationary
workflow.
faster
programs
can guidelines
that stand-alone
and
afor
only software,
The BEM
workflow.
faster
these
can dynamic
stationary
It
beguidelines
that stand-alone
isand
only software,
The
for BEM
even
dynamic
stationary
workflow.
free
used
programs
these It
beguidelines
guarantee
that stand-alone
from
foris software,
if
The
calculation.
and
for
free
used
programs
energy BEM
equipped
even
dynamic
possible
these
can from
for stand-alone
stationary
Itguidelines
is
only software,
if
The
calculation.
andafor
free BEM
faster
programs equipped
even
Nevertheless,
dynamic
stationary
guidelines
possible
diagnosis.
energy
can stand-alone
with
simplifications
beguarantee
from only software,
if
The
calculation.
andfor BEM
equipped
workflow.
used even
tools
possible
diagnosis.
can For
be
for stand-alone
with
Nevertheless,
dynamic
stationary
and
only for
athe
used software,
if
calculation.for
the BEM
equipped
even
tools
guidelines
simplifications 8thewith
Nevertheless,
faster
energy
that dynamic
stationary
It software,
construction
if
calculation.
software
and for
the
simplifications
Foror is BEM
equipped
even
tools
thewith
Nevertheless,
dynamic
8for software,
construction
if
for
calculation.
misinterpretations
compilation
befor workflow.
free or
from software
and equipped
even
examinedtools
stationary
the 8thewith
Nevertheless,
dynamic of construction
if
for
calculation.
misinterpretations
possible
Itor issoftwareaNevertheless,
equipped
even
examined
the tools
8the
and with
of construction
if
for
aNevertheless,
calculation.
misinterpretations
free software equipped
examined
dynamic
the
simplifications
from tools
8the
possiblewith
of construction
for
softwareaNevertheless,
examined
the tools
8the
with
of
calculation. construction
for
software a energy
examined
the
simplifications
or tools
8the
misinterpretati of constr
for
softwarea ene
Neverth
examin
the 8thso
or
pliance
ability,
of
Moreover, the pliance
ability,
Moreover, with
and
calculation
of the current
complexity.
ability,
regarding with
and
calculation
of
Moreover, the current
legislation,
regardingpliance
complexity.
adopted.the and
calculation
of
Moreover, The
the legislation,
interpreted
compliance
regarding
thepliance
complexity.
adopted.
This adoption
calculation
of
Moreover,with many
The
does
the current
adopted.
This adoption
ability,
calculation
compliance
regarding
the
of with
not
Moreover, of many
The
does them
current
the
adopted.
without
the mean
This
compliancelegislation,
regarding adoption
and
not BIM
of
errors
software
theof
Moreover, does
the do them
adopted.
that
mean
This
compliance legislation,
regarding not
pliance
complexity.
the Software
ability,
or
software
theof the
not
Moreover,
with BIM
of many
does
thedo
operate
that
the the not
calculation
mean
This
excessive
compliance with
Software
and of
+BIM
The
calculation
regarding
the the
not
software
theof
with many
does operate
thataccording
pliance
them
plug-in current
complexity.
calculation
mean
parameter
the of
compliance
regarding
the the
the
not +these
Softwareused
adoption
tools
simplifications,
software
theof
with ofthe
diagnosis.
energy
do
plug-in
adopted.
that
compilation
programs
calculation
for
according
them
with
legislation,
not
calculation
mean
parameter
the
compliance are to
combination
the
relating
the tools
software
theof
with
diagnosis.
energy
of
the
current
do
operate
+parameter
of
Theplug-in
wrong,
that
the
For
energy
not
Italian
to
combination
the adoption
calculation
This
are
the
compliance the BIMcan
adopted.
relating
the
to tools
software
of BEM
with
the
diagnosis.
canof
the
many
operate
wrong,
does
com-but
For
compilation
only
energy
legislation,
according
Italian
combination
Software
calculation
parameter
the are not
can of
tools
relating
the
to
software
of
with
com-
the
can
This
be
wrong,
but
be the
mean
parameter
the
For
compilation
used
according
them
are to
many
does
built +BIM
tools
relating
the
to
software
with
com-
the
of
the
do
can
wrong,
but
that
for
plug-in
and
parameter not
compilation
energy
not
areofenergy
Italian
to
Software
the
relating
the
to them
mean
with theof
operate
wrong,
com-but
obtainedcalculation
parameter
diagnosis
Italian
combination do
that
relating
the
to com-but
of
+parametnot
accord
plug-in
the
relati
to op
to
ca
co
BIM
comply
of
performance themodel,BIM
comply
data,
of (except
performance the cannot
model,
BIM
comply
resulting
data,
of (except
for
certificates the match
cannot
model,
Allplan)BIM
comply
resulting
from
data,
certificates(except
for
performance the
match
cannot
model,
Allplan)
with
exporting
(APE)resulting
fromBIM
comply software
(except
for
performanceand the
thematch
cannot
model,
Allplan)
with
exporting
(APE) from
to BIM
ASHRAE
comply
of software
certificates
other dedicated
(except
for the
thematch
cannot
model,
Allplan)
external
performance the
and with
exportingBIM
data,
to software
ASHRAE
comply
certification dedicated
(except
for the
external
certificates
other match
to
140-2007
the cannot
model,
software
(APE) BIM
Allplan)
with
resulting
to BIM
ASHRAE
of
certification software
comply
certificates dedicated
(except
for the
in
match
to
external
the
and cannot
model,
140-2007
the
standards
Allplan)
with
software
from
documents,
(APE) terms
BIM
fromsoftware
ASHRAE
data,
other dedicated
(except
for the
140-2007
thein
match
to
cannot
asoftware
and of
standards
Allplan)
comply
with
exporting
different
resulting
from
documents,
(APE) terms
BIM
software
certification
performance
other functions,
relating
ASHRAE
for
differentdedicated
and the
140-2007
athe in
match
to of
standards terms
BIM
Allplan)software
(except
with functions,
relating
different
from ASHRAE
to
software
from
to
certification
other dedicated
interoper-
the
140-2007
athe
the in
towith
of
standards
external
different
software forterms
BIM
software
functions,
validity
relating
ASHRAE
exporting
different
documents, to
software dedicated
interoper-
Allplan)
house.
certificates
certification in
tosoftware
140-2007
the
the of
standards
software
software
documents,
has terms
BIM
tofunctions,
validitydedicated
relating
ASHRAE
to
house. interoper-
in
toof
140-2007
the
with
standards
external
different
(APE) from
documents,
has terms
BIMfunctions,
validity
relating
to
the
house.
and interoper-
in
toof
140-2007
athe
different standards
ASHRAE
software terms
BIM
tofunctions,
validity
relating
different
software
other the
different interoper-
insoftware
of
standards
software from terms
tofunctions,
validity
certification
has relating
140-2007
atheinterop
of tofu
valid
rela
differe
software
has hou
docst t
guidelines
guarantee
that
pliance theseguidelines
guarantee
that
pliance withafor
programsstationary
faster
theseguarantee
that
current
pliance withafor
programs
these
can stationary
workflow.
faster guidelines
that
current
legislation,
pliance and
with a
onlyworkflow.
by faster
programs
these
can dynamic
Itguidelines
simply
bethat
current
legislation,
pliance is
withand
onlyfor
used
programs
these
manycan dynamic
stationary
workflow.
free Itguarantee
enriching
be
current
legislation,
pliance calculation.
from
foris
withoffor
free
only
used
programs
energy
many can
themstationary
possible
It
be
current calculation.
from
for is
theand
only
legislation,
pliance
with of a
usedfree
many
do Nevertheless,
fasterdynamic
thembeguidelines
possible
diagnosis.
energy
can that
current for
legislation,
not
pliance
with and
simplifications
guarantee
information from only
used
of Nevertheless,
workflow.dynamic
diagnosis.
energy
these
many
do
operate
themFor
be calculation.
possible
for
current usedforthe
guidelines
simplifications
a
presentfaster
programs
legislation,
not
with of the
diagnosis.
energy
many
do that
operate stationary
It
For 8calculation.
software
compilation
according
them for
current these
legislation,
not ofthe the
simplifications
or is Nevertheless,
diagnosis.
energy
many
do can
operateFor 8for
misinterpretations
in workflow.
free BIM or
from software
and
compilation
programs
according
them only
legislation,
not
to of examined
thestationary
Nevertheless,
dynamic
misinterpretations
from possible
It
diagnosis.
of
the
many
do
operateForor
the is
compilation
energy
be
according
them not
Italian
to used
can
of examined
thethe
of
the
many
do
operate and
For8calculation.
misinterpretations
free
Energy software
compilation
only
energy
for
according
them not
Italian
to of dynamic
the
simplifications
from the
energy
be
of
the
do
operate 8
possible
Analysis software
compilation
energy
used
according
them not
Italian
to examined
Nevertheless,
calculation.
diagnosis.
of
the
do for
operateenergy
according
notenergy
Italian
to examined
simplifications
or
Program. misinterpretati
theof
operate For If
energy
according Neverth
the
diagnosis
Italian
to the
the 8
or
com
accordItal
to s
ability,
of
Moreover,
to the
be used. ability,and
calculation
of
Moreover,
to the complexity.
ability,
regarding
beFrom and
calculation
of
Moreover,
used. the complexity.
adopted.
regarding
theFrom ability,
the
examination
to and
calculation
of The
the complexity.
adopted.
This
compliance
the
be regardingadoption
the
used. ability,
examination
to and
calculation
of The
does
the complexity.
adopted.
This
compliance
be From adoption
the
ofused. ability,
of and
calculationnot
Moreover,
these
to of
The
does
the
the complexity.
the
adopted.
mean
This
compliance
be From
oftwo adoption
ability,
and
software
used.of BIM
calculation
not
examination
these of
The
does
the
the complexity.
the
adopted.
that
mean
This
regarding
parameters,
From
two Software
adoption
ability,
software
of and
calculation
the
not
Moreover,
with
examination BIM
of
The
does
the
the complexity.
the
adopted.
that the
parameters,
of Software
adoption
calculation
mean
This and
software
the +
withBIM
of
The
calculation
the
not doesplug-in
parameter
examination
these
the complexity.
the
adopted.
that
compliance
regarding
choice
ofto the
two Software
calculation
mean
ofThis adoption
the
the
not
with
these
the
be +BIM
of
toolsTheplug-in
does combination
parameter the
adopted.
that Software
adoption
calculation
calculation
mean
This
are the
relating
parameters,
can
used.
choice
of the
two the
be of
thesenot+BIM
of
toolsTheplug-in
combination
wrong,
does
that
parameter
Fromthe the
compliance
restricted Software
adoption
calculation
mean
This
are the
relating
parameters,
can twoto
software
be
the
the +BIM
of
com-can
adopted.
not
tools plug-in
combination
wrong,
does
but
that the Software
calculation
mean
restricted
parameters,
choice are
examination
tosoftware
thethe
not+BIM
of
tools
relating
to of
with
com- can
plug-in
Thiscombination
wrong,
but
that
the
can the Software
calculation
mean
choice
to are
the
to does
the+BIM
tools
software
be
the com- can
plug-in
combination
wrong,
but
that Software
calculation
parameter
of
restricted
can
choice not
these are
be +
the
toolscan
mean
with plug-in
combination
wrong,
butcalculation
restricted
two
can to are +
that
relating
the
be toolscan
plug-in
combi
wrong,
but
paramet
parameters the
restricted are
to
to rela to
ca
co w
comply
of
performance
guidelines the comply
data,
of (except
performance
guidelines theresulting
for data,
of (except
for
certificates
performance
stationary
guidelines theAllplan)
for comply
resulting
from
data,
certificatesfor
performance
stationary
guidelines (APE)
and Allplan)
for with
exporting
resulting
the fromcomply
certificates(except
performance
dynamic
stationary
guidelines and the
import/verification
(APE)
andfor with
ASHRAE
exporting
from
to of
certificates
other
dynamic
stationary(except
for
guidelinesandthe
(APE)Allplan)
external
the ASHRAE
exporting
data,
to for
certification
certificates
other
calculation.
and
for dynamic 140-2007
external
and
stationary(APE)
guidelines Allplan)
softwarewith
resulting
stepto comply
of
certification
calculation.
and for otherperformance
Nevertheless,
dynamic
stationary
guidelines 140-2007
and the
standards
external
the with
software
does from
documents,
(APE) ASHRAE
from
data,(except
not
certification
calculation.
andfor other aand
and the
standards
comply
software
exporting
different
documents,
Nevertheless,
dynamic
stationary relating
resulting
from
take ASHRAE
8for
certification
calculation.
for performance
the 140-2007
certificates
other
different aand
place Allplan)
documents,
Nevertheless,
dynamic
stationary (except
relating
different
from to
software
from
to
certification
calculation.
software
the different140-2007
athe
softwarestandards
external
correctly,
documents,
(APE)
Nevertheless,
dynamic with
for
validity
exporting
differentto
software
certificates
8calculation.
software
and examined
the Allplan)
house.
it
different the
the
software
and
Nevertheless,
dynamic standards
software
will
documents,
has
8calculation.
software validity
relating
examined
the ASHRAE
to
house.
be
other
different
(APE)
Nevertheless,with
external
from relating
necessary
software
has to
the
house.
certification
8calculation.
software and 140-2007
athe
different
examined
the 8software
Nevertheless,hasASHRAE
software
other
software validity
different
to
examined
the to thestandards
perform
8software from validity
certification
documents,
has
Nevertheless,
software
examined
the 140-2007
software ahasdiffere
thediff
8 software
examin 8sts
hou
doc
guarantee
that
pliance
a theseguarantee
that
pliance witha faster
programs
theseguarantee
that
current
pliance withaworkflow.
faster
programs
these
can guarantee
that
current
legislation,
with a
onlyworkflow.
faster
programs
these
can It
beguarantee
that
current
legislation, is a
onlyworkflow.
free
used faster
programs
these
manycan It
beguarantee
that from
for
legislation,
pliance is a
ofworkflow.
free
only
used faster
programs
energy
many possible
these
can
themIt
guarantee
be from
that
for
withis
only
of a
usedworkflow.
free
faster
programs
many
do possible
themIt
diagnosis.
energy
these
can simplifications
beguarantee
that
current
not from
for
pliance isofa
onlyworkflow.
free
used faster
programs
do possible
diagnosis.
energy
these
can
operate
them It
simplifications
For
befrom
for is
onlya
usedworkflow.
free
faster
programs
legislation,
not
with the possible
diagnosis.
energy
do that
can
operate It
simplifications
Foror
from
is misinterpretations
compilation
be
according for
current
not these
only
usedworkflow.
free
the possible
diagnosis.
energy
many can
operate It
Forsimplifications
or
from
is misinterpretations
compilation
be
programs
for
according only
used
legislation,
to of free
the possible
It
diagnosis.
energy
of
the simplifications
Foror
from
is misinterpretations
compilation
energy
befor
according
them Italian
to usedfree
can
the possible
diagnosis.
energy
of
the
many
do simplifications
or
Forfrom misinterpretations
compilation
only
energy
for
not
Italian
to ofthe possible
diagnosis.
energy
be
of
the
operate simplifications
or
For misinterpretations
compilation
themenergy
used
Italian the
diagnosis.
of
do for simplifications
or
For misinterpretati
compilation
energy
according
notenergytheof
operate or
For misinte
compilation
energy
diagnosis
to theof
the or
com
ene
accordItal
ofmore
Moreover,
to theused.
be
a limited
calculation
of
Moreover,
to
more
the
beregarding
From
limited
number
calculation
Moreover,
used.
to adopted.
regarding
the
be From
aof
the
used.
examination
to
number
of
more
the software.
adopted.
This
compliance
the
be aregarding
From theaof
specific
used.
examination
to
limited
calculation of
more
does
the software.
This
compliance
the
be From
of
The
the
BEM aMoreover,
of
used.
examination
these
limited
calculationnumber
notmoreBIM
does
adopted.
mean
compliance Thelimited
number
not
software
modelling.
theFrom
oftwo of +ofadopted.
examination
these
plug-in
BIM
software.
that
mean
This
regarding
parameters,
the oftwo software
of number
the
Moreover,+of
with
It
examination
these
to
plug-in
thesoftware
does
the software.
that
causes the
parameters,
be oftwo
The
calculation
This
software
the
used.
of
calculation
the
not
with
these
the doessoftware
BIM
software.
parametera
compliance
longer solutions
regarding
parameters,
choice
From
ofto the
two
more
The
calculation
mean
of the
not+time
tools
with
these
the
be
plug-in
BIM
parameter limited
solutions
adopted.
that The
calculation
mean are
relating
parameters,the
the
ofofthat
the+work
tools plug-in
software
BIM
wrong,
that
parameter meet
number
compliance that
calculation
This
are the
relating
to +com-
adopted.
software
and plug-in
software
wrong,
does
but meet
solutions
of
calculation
not
relating
more to of
withsoftware.
tools
com- software
This
butmean
effort solutions
are
the
to that
does
tools
software
com-
by The
wrong,
that
parametermeet
thesolutions
not
are that
BIM
themean
with wrong,
but meet
+ that
calculation
designer. plug-in
that
relating
the but meet
tothe
paramet to so
toto
ca
co
comply
of
performance
guidelines
requirements the comply
data,
of (except
performance
guidelines
requirements the
for
comply
resulting
data,
of (except
for
certificates
performance
stationary
guidelines
include: theAllplan)
resulting
for fromcomply
data,
of
certificates(except
for
performance
stationary
include: the
(APE)
and
requirements
Allplan)
for
with
exporting
resulting
from
data,comply
of
certificates(except
for
performance
dynamic
stationary and
requirements
the
the
(APE)
and
Allplan)
with
ASHRAE
exporting
resulting
from
data,
to comply
of
certificates
other (except
for
performance
dynamic and
guidelines
include:
the
(APE)Allplan)
external
the withASHRAE
exporting
resulting
fromcomply
data,
to of (except
for
certification
certificates
other
calculation.
and
requirements
140-2007
performance
dynamic and the
external
the
(APE) Allplan)
softwarewithASHRAE
exporting
resulting
from comply
data,
to of
certification
calculation.
include: for
(except
certificates
other for
performance
Nevertheless,
stationary
guidelines
include:
140-2007
and the
standards
Allplan)
external
the with
software
exporting
resulting
from
documents,
(APE)
calculation.
ASHRAE
from
data,
to (except
for
certification 140-2007
the
standards
external
aand
certificates
other and
Nevertheless,
Allplan)
software with
exporting
differentrelating
resulting
forfrom
documents,
(APE) the
ASHRAE
from
to
certification
performance for athe
can
used.
choice
140-2007
the
external
certificates
other
different
8and
Nevertheless,
dynamic
two
software
stationary
requirements
examination
be
standardsthe
Allplan)
with
exporting
different
from
documents,
(APE)
software
thesoftware
from
to From
relating
ASHRAE
to
certification
other
restricted
parameters,
can
choice
140-2007
athe
the
external
different software
software
and
be
the
standards
withthe
validity
relating
ASHRAE
exporting
different
from
documents,
(APE) to
software
tohouse.
certificates
certification
8calculation.
software
and other
restricted
can
choice
examination
of
to
140-2007
athe
the
external
different
examined
the
include: software
8software
dynamicand
be
these
the
standards
validity
different
from
documents,
has software
to
house.
certification
software other
restricted
relating
ASHRAE
to can
choice
to
140-2007
athe
external
different
examined(APE)
two
software
software
be
standards
different
from
documents,
Nevertheless,has software of
validity
relating
to
house.
certification
calculation. and
restricted
parameters,
different
examined
can these
to
140-2007
athe
software be
standards
different
software from
documents,
has
other
thesoftware restricted
validity
relating
to
house.atwo
the
different
to
standards
different
8software from parameters
the
validity
relating
to
software
certification
documents,
has
Nevertheless,
software house.
different
choice
athe valid
rela
differe
software
has softw
examin
the hou
diff
doc
8sos
tc
that
pliance
a more
of the calculation thesethat
pliance
a
of the programs
with
limited
more these
current
pliance
a
calculation
of the programs
with
limited
number
more can
adopted. that
current
legislation,
a
calculation
of the only
with
limited
number
of
more these
Thus,can
adopted.
Thisbe that
current
legislation,
software.a
calculation
of does only
used
it
limitedprograms
number
of
more
the these
many be
software.
adopted.
ThisThe for
legislation,
nullifies pliance used
programs
of
limited
calculation
of number
of
not energy
many
BIM
does
the can
them
the
software.
adopted.
mean
This Thefor
with only
number
+of
calculation
of not of diagnosis.
energy
many
do
advantages can
them
plug-in
does
the BIM be
software.
adopted.
that
mean
This that
current
not
pliance
The
a
calculation
of the
not+ only
ofused
of
morediagnosis.
these
do
operate
them
plug-in
software
does
theBIM For
be
software.
adopted.
that for
The used
limited
calculation
mean
This + programs
legislation,
of not
with
the
calculation
the
not the
energy
do that
operate
plug-in
doessoftware
BIMa
adopted.
that For
compilation
according
BIM for
current
not
solutions
more
The
calculation
mean
This these
number
the
not+
tools the
diagnosis.
energy
many can
operate
plug-in
software
doesBIM compilation
programs
according
workflow.limited
solutions
adopted.
that
calculation
mean
This
are that
the+
not only
legislation,
to of
toolsof diagnosis.
of
the
plug-in For
softwareenergy
be
according
them
If Italian
software.
wrong,
does
that meet
number to
the
solutions
that
calculation
mean
This
are not used
tools can
the
of
the
many
do
model
software
wrong,
does
but
that meetFor
compilation
only
energy
for
not
Italian
to
solutions
of
The
that
calculation
mean are the
not ofthe
energy
be
the
operate
was
software.
tools BIM
wrong,
but
thatmeet compilation
themused
Italian
solutions
that
calculation
mean are +
the
tools diagnosis.
correctly of
do for
plug-in
the
The
wrong,
but
that meetenergy
according
notenergy
that
calculation
are BIM
the
tools theof
operate
set,
software
wrong,
but For
meet
+ energy
the
calculation diagnosis
to the
plug-in
aretools the
wrong, com
accordItal
solut
butrelati
aretoso w
Moreover,
to beTermus Moreover,
used.
to beregarding
From Moreover,
used.
to regarding
the
be From the
used. Moreover,
examination
to compliance
the
be regarding
From the
used. Moreover,
examination
to compliance
the
beregarding
From
of the
of
used. Moreover,
examination
these
to the
compliance
beregarding
From
oftwo software
the
used.of
Moreover,
examination
these
to the
compliance
regarding
parameters,
be From
of software
theof
Moreover,
with the
compliance
regarding
the
software
theof
withparameter
the
compliance
regarding
the
software
theof
with parameter
the
compliance
relating
the
software
theof
with parameter
the
compliance
relating
the
to
software
ofwith
com-
parameter
the relating
the
to
software
of
with
com-
parameter
the relating
the
to
software
with
com-
parameter relating
the
to with
com-
parameter relating
the
to tocom-
paramet to co
comply
that
performance
guidelines
requirements these
comply
that (except
performance
guidelines
requirements for
comply
Termus
(even (except
for
certificates
programsstationary
theseguidelines
include:
requirements
that
Allplan)
ifcan
for (even
programs thethat
certificates
these
(except
for
performance
stationary
include: (APE)
and
requirements
only
Allplan)
latter
for
with
ifTermus
ArchiCAD
programs
these
canthe that for
is
performance
dynamic
stationary
include:
be and the
(APE)
and
requirements
only
used
Allplan)
latter
not with
Termus
programs
ASHRAE
(even comply
that really
certificates
other
these
can dynamic
+
include:
be foris
and
guidelines
the
only
usednot with
aASHRAE
ifTermus
(even
the (except
really
certification
programs
energy plug-in
certificates
other
calculation.
and
Ecodesigner
these dynamic
include:
can be
that
for (APE)
only
used iftwo
140-2007
the
latterused.
examination
these
(even
theto
ASHRAE
comply
certification
calculation.
for
programs
diagnosis.
energy
these
can be
for
astationary
performance
Nevertheless,
guidelines
STAR
parameters,
be
plug-in
is
but
and
From
of
iftwo
140-2007 used.
documents,
requirements
that for (APE)
calculation.
only
used
programs
examination
these
standardsthe
Allplan)
latter
not aother
the
diagnosis.
energy
these
can For
be
for
parameters,
(except
and
choice
From
of
140-2007
program
really
is
but to
documents,
Nevertheless,
solution and
only
usedfor
twoexamination
standards
latter
not these
withthe
be
relating
aother
certification
programs
the performance
the
for
requirements parameters,
certificates
diagnosis.
energycandifferent
Nevertheless,
dynamic
can
stationary
include:
For
befor
used.
choice
acompilation
program
really
8plug-in
is
only
the
used
the
oftwoexamination
be
these
standards
Termus
to the
Allplan)
not From
relating
ASHRAE
to
complement
certification
software
automatically the different
diagnosis.
energy
canFor
be
restricted
parameters,
can
choice
acompilation
really
plug-in
but
to
software
for
of
(eventwo
documents,
(APE)
only
used
be
these
the
withthe
avalidity
relating
to
complement
certificates
8calculation.
software
and examined
the
include:
the
diagnosis.
energy
of For
restricted
parameters,
can
choice
examination
8software
dynamic
energy
befor and
of
to
140-2007
acompilation
program the
plug-in
but
if the two
the
documents,
performs has
software
used
the
be
these
the
validity
ASHRAE
to
aother restricted
parameters,
different
examined
diagnosis.
energy
of (APE)
can
program
latter
but
to
Nevertheless,
For
choice
has
compilation
energy
for
totwo be
the
standards
the
certification
calculation.
the the and
of
avalidity
complement
is restricted
parameters,
different
examined
diagnosis.
energy
of For
can
choice
software
transition
compilation
energy
these
to
140-2007
program
notto other
thethe
be
the
diagnosis.
of For
restricted
relating
complement
really two
can
tochoice
softwareato
certification
documents,
has
Nevertheless,
8from
software
compilation
energy theof
be
standards
the parameters
the
complement
plug-in
the
For
restricted
can
choice
the
the
has
compilation
energy
tovalid
examin
theof
be
rela
but
thediff
doc
8s
com
ene
re c
pliance
a more
of thefirst pliance
alimited
calculation
of with
more current
thefirst pliance
alimitedwith
number
calculation
of more
the current
adopted.legislation,
pliance
calculationwith
alimited
number
of
more
adopted.current
legislation,
software.
This pliancewith
alimited
number
of
moremany
does current
adopted.legislation,
software.
ThisThe pliance
of with
alimited
not of
number
of many
moreBIM
does
the them
meancurrent
Thislegislation,
pliance
software.
The with
alimited
number
calculation
not of
+which
of
more many
doesdo
that them
plug-in
BIM
meancurrent
legislation,
not
software.pliance
The
of with
alimited
number
the
not+ofof
moremany
thedo
operate
them
plug-in current
software
BIM legislation,
software.
adopted.
that not
with
The
limited
calculation
mean numberof
+which
of
calculation
the many
do
operate
according
plug-inthem
software
BIM current
legislation,
software.
that aThis not
solutions
more
The
calculation number
the of
+which
of
tools many
do
operate
according
them
plug-in
software
doesBIM legislation,
not
software.
limited to
solutions
adopted. The
calculation
are that of
+which
notof
tools the
many
do
operate
according
them
plug-in
software
BIM not
Italian
software.
wrong, meet
number to+of
solutions
mean
ThisThe
are that
tools many
do
operate
according
them
plug-in
the
software
BIM
wrong,
does
but
that meet not
Italian
to
solutions
of
The
are that of do
operate
according
+documents
the
not software. them
plug-in
the
software
BIM
wrong,
but meet not
Italian
to
solutions
that
calculation
mean do
operate
+documentsaccording
plug-in
the
software
butThe
that meet not
Italian
to
solutions
that
BIM
the
tools operate
the according
software
meet Italian
towrong,
solutions
+are
calculationthat
plug-in
the accord
meetItal
to
solut
tha
sot
to and completely and completely compatible),
first and compatible),
firstcompletely towhich
and firstcompletely
allows
and compatible),
completelyyou
allows compatible),
to produce
you compatible), produce
allows
documents
first andyou
allows
documents
completely
to valid
produce
you
allows into valid
produce
you
compatible),
into produce valid
which documents
in allows
valid in
toyou
valid
 bethese
comply
performance
guidelines
requirements
that
used.
Termusto
comply
(except
performance
guidelines
requirements
that
beFrom
for
used.
comply
(exceptfor
certificates
performance
Termus
(even
stationary
guidelines
include:
programs
these
the
requirements
that
From
for
programs
examination
Allplan)
these
can
to
(except
certificates
ifTermus
(even
the
stationary
for
guidelines
include:
the
be
performance
and
requirements
only
BIM
(APE)
latter
for
used.
examination
Allplan)
with
ifTermus
programs (even
canthe to
for
certificates
dynamic
stationary
include:
be
model
performance
and
is
guidelines
requirements
be From
of
the
(APE)
latter
and
only
usednot used.
these
Allplan)
with
ASHRAE
ifTermus
for (even
canthe comply
certificates
other
dynamic
include:
be
the
performance
and
really
stationary is
guidelines
From
of
the
(APE)iftwo
latter
requirements
that for only
usednot
energy
examination
these
aBEM
withASHRAE
certification
certificates
other
(even
calculation.
and
for
these the really
dynamic
include:
parameters,
the
(except
performance
and
(APE)
plug-in
is
stationary
guidelines
requirements
be for iftwo
140-2007
the
latter
used not
calculation.
and for
programs
examination
model.
theto
ASHRAE
comply
for
certification
certificates
other for
performance
astationary
include:
diagnosis.
energy really
Nevertheless,
dynamic
parameters,
be
plug-in
guidelinesis
but
requirements
that
of
140-2007
and latter
not used.
It these
standards
Termus
calculation.
andfor
the
Allplan)
documents,
(APE) has
(except
certification choice
astationary
program
really
plug-in
is
include:
diagnosis.
energy
these
can For but
Nevertheless,
dynamiconly
From
of
the
140-2007
certificates
aother and not
calculation.
andfor
to
two
standards
documents,
(APE) the
programs
the
these
withthe
(evenbe
great
relating
certificationforparameters,
certificates
aother
different
andthe
can
used.
choice
acompilation
program
really the
plug-in
but
Termus
Nevertheless,
diagnosis. dynamic to
stationary
For
be
two
if
8calculation.
requirements
include: software
and
used
the
examination
be
standards
Allplan)
documents,
(APE) complement
the the From
advantage
relating
ASHRAE
to
certification
aother
differentrestricted
parameters,
can
the
software
and
documents,
(APE)
acompilation
program
plug-in
but
to
Nevertheless,
candynamic
For latter
(even
8calculation.
for software
and
only
be
the
withthe
validity
relating
to
certification
aother
complement
examined
the the
restricted
of
program
is
but
if
to
Nevertheless,
include:
energy
of dynamic
choice
examination
of
to
140-2007
different the
the
software
and the
notnot
documents,
hasthe these
the
validity
ASHRAE
to
certification
aother
different
complement
8calculation.
software
compilation
energy
be used examined
the
can
program
really
latter
to
Nevertheless,
diagnosis.
of
choice
losing
the
software to
the two be
standards
documents,
has any
complement
8calculation.
energy
for software is of
validity
certification
aenergy
examined
the
restricted
parameters,
can
plug-in
notto
Nevertheless,
energy
of For
these
140-2007
different
8software
documents,
has
the be
information
complement
softwarereally
examined
thethe
restricted
relating two
different
but
Nevertheless,
diagnosis. ato
standards
8software
documents,
has
the
software
compilation
parameters
the
to
different
aplug-in
examined
the Forprogramchoice
the
8software
has
the
software
examin
theof
rela
thediff 8sots
but
com
ene
c
a more
of
to be Italy;
thefirst
used.alimited
calculation
of
to more
the
be Italy;
From
used.
to limited
number
calculation
of the
adopted.
the
be From
used. anumber
calculation
examination
to of
more
the
be Italy;
software.
present
adopted.
FromThis
used. alimited
examination
to of
more
the
be Italy;
software.
in
does
adopted.
From
of The
the
This
used. of
examination
theseto limited
number
not BIM
does
the
the
be Italy;
BIM
mean
This
From
oftwo The
used. number
and +which
of
calculation
not
examination
these
to plug-in
doesBIM
software.
recording
that
mean
parameters,
the
be From
oftwo
used. athe
of not
examination
these
to +which
of
more
plug-in
software
the software.
adopted.
that
parameters,
the
be From
oftwo
used.The
limited
in
calculation
mean examination
these
the real
calculation
the software
BIM
that atwo
parameters,
the
choice
From
of solutions
more
The
time
calculation
This the Italy;
number
+which
tools
examination
these
the plug-in
doesBIM
inlimited
parameters,
the
can
choice
of solutions
adopted.
two the
calculation
are that
+of
not
tools
examination
be
these
the plug-in
software
BEMsoftware.
wrong, meet
number
mean
restrictedThis
parameters,
can
choice
of twoare
be that
these
the model
tools the
software
wrong,
does
but
that meet
restricted
parameters,
can
choice
of
totwosolutions
of
The
are
be all
the
not
these
the software.
the
BIM
the
wrong,
but solutions
that
calculation
mean
restricted
parameters,
can
choice
totwo be
the +documents
changes plug-in
butThe
that meet
restricted
parameters,
can
choice
to be
thethat
BIM
made
the
tools the
software
meet
+are
to
calculation
restricted
can
choice
to be
theplug-in
the
wrong,
restricted
can
choice solut
toyoube so
tore c
comply comply and
(exceptfirst
completely
comply and
(except
for firstcompletely
Allplan) comply and compatible),
(except
for firstcompletely
Allplan)
with comply and
(except
for compatible),
thefirstcompletely
Allplan)
with
ASHRAE
comply which
andcompatible),
(except
for the completely
Allplan)
with allows
ASHRAE
comply
(except
for compatible),
140-2007
theAllplan)
withASHRAE
complyyou
allows
(except
for compatible),
first
140-2007
the to
standards
Allplan)
with produce
you
allows
which
ASHRAEand
(except
for140-2007
the to
standards
Allplan)completely
with produce
you
allows
relating
ASHRAE
fordocuments
first
140-2007
the to
standards and
Allplan)
with produce
you
allows
relating
ASHRAE
to documents
compatible),
completely
140-2007
the
the to valid
standards
with produce
you documents
into valid
produce
compatible),
which
documents
in valid allows in valid
which
you into
allows
validproduce in tod
that
performance
requirements
a more Termus
these that
performance
ArchiCAD
requirements
a limited
more that
certificates
performance
Termus
(even
ArchiCAD
include:
programs
these a +more ifTermus
(even
programs
limited
number these
canthe
Ecodesigner arequirements
certificates
include:
(APE)
+oflatter
only
limited
number
moretheifTermus
programs (even
canthe
Ecodesigner
ArchiCAD
BIM
be
software. arequirements
certificates and
is
STAR(APE)
latter
only
used
limited
number
of
more not other
ifTermus
(even
the
ArchiCAD
model.
can that
performance
include:
be
software.
The a +and
and
for
(APE)
really
is
STARlatter
only
used
limited
number
of
morenot
if
It
energy
these
BIM aand
certification
other
Termus
(even
the
aThe
Ecodesigner
Revit
ArchiCAD
enhances
include:
be
software. for++and
really
plug-in
is
limited
number
of +latter
more not
if
Termus
(even
the
Ecodesigner
used Revit
Energy
programs
diagnosis.
energy
plug-in
BIM
software.that
certification
certificates
otherperformance
aThea really
STARdocuments,
plug-in
is
but
++the
requirements
for
limited
number
of
certification
+latter
not
ifTermus
(even
athe
aThe
Ecodesigner
more Energy
Analysis,
aim
diagnosis.
energy
these
can
plug-in
software
BIM
software.and
For
documents,
STAR(APE)
program
really
plug-in
is
but
of
only
limited
number
+of latter
not
ifrequirements
Revit
BIM
programs
the
certificates
different
(even
ainclude:
the
Analysis,
diagnosis.
plug-in
software
BIM
software. and
For
be
and
which
solutions
The
documents,
acompilation
program
really
plug-in
is
but
Termus
STARto+latter
not
ArchiCAD
design.
used
number
+of the if aother
Revitdifferent
complement
the
Energy
can
plug-in
software
BIM have
Forand
software.
software
which
for
solutions
Thethat
+
(APE)
acompilation
program
really
plug-in
is
but
to+latter
only
of (even
not avalidity
Revit
relating
Energy
ofameet
ASHRAE
to
certification
complement
Analysis,
include:
the
energy
plug-in
software
BIM similar
have
140-2007
+different
the
acompilation
program
really the
software
and
plug-in
is
but
if
to standards
has
the
not
the
Ecodesigner
energy
be
software.
solutions
Thethat
+ +plug-in
used
validity
relating
Energy
ameet
ASHRAE
to
aother
complement
aThe
Analysis,
diagnosis.
of
the
software
BIM
140-2007
similar
which
energy
for
solutions
that
+
the
software
program
really
latter
plug-in
but
to standards
documents,
has
the avalidity
relating
to
certification
complement
is
aenergy
Analysis,
energy
of
plug-in
the STAR
software
BIMmeet have
For
140-2007
which
solutions
that
+
the
program
plug-in
not
but
to standards
has
the
the andavalidity
relating
ameet
to
complement
really
similar
diagnosis.
plug-in
software have
which
the
different
program
but
to
Revit
compilation
solutions
that
standards
documents,
the
the
validity
relating
ameet
software
to
acomplement
aplug-in
similar
have
For+that
solutions
the
software
program
tothe
Energy
theof
valid
rela
compdiff
but
ameet
sim
com
ene
solut
tha ttA
of
to be theItaly;
calculation
used.
first of
toand the
be Italy;
From calculation
first of
used.
toand
completely the
the
be Italy;
adopted.
From
firstcalculation
used. ofand
examination
completely the
the Italy;
adopted.
FromThis
calculation
compatible),
first ofand
examination
completely does
the
the Italy;
adopted.
of This
calculation
compatible),
first of
examination
these to
completely not does
the
adopted.
be
which
and mean
of This
two calculation
used. of
these
compatible),
first not
completely does
the
adopted.
that
mean
This
parameters,
allows
which
and From
oftwo calculation
of
these
compatible),
first to the
completelynot
you does
the Italy;
adopted.
that
calculation
mean
This
parameters,
the
be
allows
which
and two calculation
used. the
not
examination
the
compatible),
first
to does
adopted.
that
calculation
mean
parameters,
completely
produce
you
allowschoice
which
and From This the
compatible),
to the
not Italy;
tools
completely
produce
you does
adopted.
that
the
can
allows calculation
mean
choice
which of
documents
first This
are the
not
tools
examination
be
these
the
compatible),
to and wrong,
does
that
calculation
mean
restricted
produce
you can
allowschoice
which
documents This
twoare
be the
compatible),
completely
to validnot
toolswrong,
does
but
that
calculation
mean
restricted
parameters,
produce
you can
allows
which of
to
documents
into are
be the
not
tools
these
valid wrong,
but
that
calculation
mean
restricted
produce
you totwo
compatible),
allows
which
documents
in are
the
tovalid the
toolswrong,
but
that
calculation
parameters,
produce
you
allowschoice
to
documents
in are
tovalid the
whichtools
wrong,
but
can
produce
you calculation
documents
into are
be
the
allows
valid tools
wrong,
but
restricted
producechoice
documeninyouaretodctw
valid
a more
performance range alimited
performance ofrange
features,
certificates
performance of features,
 but
certificates (APE)do
range not  but
certificates These
and of
produce
do
(APE)range
features,
not
considerations
other performance
and of
produce
(APE)range
documents
features,
but
certification
other and of
do documents
features,
not
can
certification but
certificates
other conforming
performance produce
do
be
documents, not
but conforming
summarized
certification produce
do
documents,
(APE) documents
 to not Italian
range
certificates
different
and produce
documents
in
documents, to standards.
of
graphs
other Italian
conforming
different
softwarefeatures,
(APE) documents
in standards.
certificationconforming
differentFigure
software
and has butto
other Italian
do
conforming
2.
software not
documents,
has to standards.
produce
Italian
certification has to standards.
Italian
documents
different
documents, standards
software conf
diff
requirements
that Termus
these requirements
ArchiCADthat Termus
programs
more these 
include:
requirements
(even
ArchiCAD
that
alimited+ if
programs
number
more these
caninclude:
(even
the
Ecodesigner
ArchiCAD requirements
that + latter
only if
programs
limited
number these
can
of software.
include:
Termus
the
Ecodesigner
ArchiCAD
be requirements
that is
STAR
+ latter
only
usednot
programs
number these
can
of software.
include:
Termus
(even
Ecodesigner
ArchiCAD
be
The
requirements
that
a ofreally
and
foris
STAR
+ only
usednot
if
programs
energy
more these
BIM
include:
(even
canthe
a
Ecodesigner
Revit be
software.
requirements
really
and
that
Theforplug-in
STAR
+ +
only
limited latter
used if
programs include:
the
a
Ecodesigner
Revit
Energy
diagnosis.
energy
+ plug-inthese
BIM can be
The
requirements
thatand
for
anumberplug-in
is
STARbut
+latter
only
usednot
Revit
programs
+more
include:
Termus
a
ArchiCAD
Energy
diagnosis.
energy
these
can
plug-in
software
BIM For
beprogram
really
Analysis,
and
for is
but
STAR +
only
used
limited not
Revit
Energy
programs
the
diagnosis.
energy
+ofplug-in can
software
include:
(even
a a
For
software. program
really
Analysis,
and plug-in
which
+ Termus
to
ArchiCAD
+
compilation
befor
solutions only
used
number the if
complement
the
a
Ecodesigner
Revit
Energy
Analysis,
diagnosis.
energy
can
software have
For plug-in
whichbut
to+
compilation
befor
solutions
Thethatonlylatter
(even
used
the
of BIM complement
a
Energy
a
diagnosis.
energy
of Forprogram
Analysis,
+ is
similar
have
whichbut
if
compilation
energy
be
software.
meet for
solutions
that the
usednot
the
Ecodesigner
STAR the a a
diagnosis.
energy
of
+ plug-in meetForprogram
really
latter
Analysis,
similar
have
and
whichto
compilation
energy
for
The the
the complement
Revit
a is
a
STAR
diagnosis.
energy
of
thatsoftware
BIMmeet For plug-in
not
similar
have
whichto+
compilation
energy the complement
really
Energy
and
a but
similar
diagnosis.
of
+ plug-in have
For the
Revit
compilation
energy
solutions a
theofa aplug-in
program
Analysis,
software similar
For+ the
Energy
compilation
energy the
that meetof but
wh
com
ene
solut tA
to be Italy;
used.
Among to be Italy;
From
used.
Among
the to the
be Italy;
From
used.
examination
stand-alone
the the Italy;
From
stand-aloneexamination
Among plug-in, the Italy;
of examination
Amongthese
the to
plug-in, be
TermoLOGItaly;
oftwo
used.
stand-alone
Among
thetheseTermoLOG Italy;
parameters,
From
oftwo
stand-alone these
appears
the to
plug-in, Italy;
parameters,
the
be two
used.
stand-aloneexamination
the
appears
to parameters,
plug-in, choice
TermoLOG
be From
the the
to Italy;
plug-in, the
can
choice
TermoLOG
more
be
Among of
the examination
be
these
the
appears restricted
complete can
choice
TermoLOG
more the twobe
appears
to restricted
parameters,
can
stand-alone
complete
be
than of
to
the be
these
appears
to restricted
more
be
than totwo the
plug-in,
the to parameters,
complete
more
be choice
to
theTermoLOG
complete
morecan
than be
the restricted
complete
thanchoice
appears th c
performance
the
requirements first
range
Termus
ArchiCAD and
performance

requirementsoffirst
range
Termus
completely
features,
(even
certificates and
performance

include:
requirements
ArchiCAD +
ofrange
if
Termus
(even
the 
completely
features, but
certificates
performance

include:
Ecodesigner
ArchiCAD +
compatible),
of
(APE) first
do
range
latter
if
Termus
(even
the 
features,
not but
certificates and
is
performance

include:
Ecodesigner
ArchiCAD and
STAR
+
compatible),
of
(APE)first
produce
do
range
latter
not
if
Termus
(even
the 
completely
features,
not but
certificates
other
Ecodesigner
ArchiCAD
which
and
really
is
performance
 and of
produce
do
latter
not
(APE)
requirements
and
STAR
+ if
Termus
(even
the
a 
completely
documents allows
features,
not
but
certification which
really
plug-in
is
certificates
other
Ecodesigner
Revit
ArchiCAD performance
and and
STAR
+
compatible),
produce
(APE)
+
do
latter
not
if
Termus
(even
the
a 
documents
not
certification you
certificates
other
Ecodesigner
Revit
ArchiCAD
Energy
allows
but
really
plug-in
is
but
performance

include: and compatible),
first
to
conforming
produce
dorange
latter
not
if
Termus
documents,
(APE)
requirements
and
STAR
+ + (even
a the
a produce
you
documents
not
certificationwhich
and
conforming
program
really
plug-in
is
but
certificates
other
Ecodesigner
Revit
ArchiCAD
Energy
Analysis,
and and of
latter
not
if
documents,
STAR
+ (APE)
+
to
produce completely
(even
a the
a produce
documents
certification

allows
features,
to which
documents
first
Italian
conforming
range
program
really
plug-in
is
but
certificates
other
Ecodesigner
Revit
Energydifferent
include:
Analysis,
and to
and
whichdocuments,
STAR
+ (APE)
ArchiCAD
+
and
documents
latter
not
if to you
allows
but
complement
a the
a
certification
other
different
Ecodesigner
Revit
Energy
Analysis,
have
and
documents
software
and
which
compatible),
completely
standards.
ofItalian
conforming
program
really
plug-in
is
but
to to
documents,
STAR(APE)
+ avalid
features,
do
latter
not to
Revita
Energy
a
produce
you
not
program
really
Analysis,
+ plug-in
certification
other is
similar
have
and
whichbut
differentto in
standards.
complement Italian
the
software
and not
Ecodesigner
STAR +
to
conforming
produce
butvalid
to produce
compatible),
complement
documents,
has a
Revit a
Energy
a
which
documents
program
really
Analysis,plug-in
certification
other but
similar
have
and
whichto
different +
in
standards.
Italian
do the
software not
documents
to allows
complement
documents,
has a
Revit
Energy
a a documents
standards.
produce
Italian
program
Analysis,
STAR plug-in
certification but
similar
have
whichto
different +the
software valid
which
you
complement
documents,
has a
Energy
and
a program
Analysis, but
similar
have to
different
which the
software
Revit
in
standards.
conformingto
allows
documentsvalidproduce
complement
documents,
has a a program
Analysis,
similar
have
which
+ to
different the
software
has
Energy
in you
to
conf
comp
a sottA
diff
sim
hav
wh
d
It
a more Italy;
first a
competitors
the limited
more
and Italy;
first a
competitors limited
number
completely more
Design
and first thelimited
completely number
of
Design
Builder,
and software.
competitors
Italy;
compatible),
first the
completely number
of
Builder,
Open
and software.
Italy;The
competitors
compatible),
first a
the
completely of
more
which
and BIM
Studio,
Design
Open software.
The
competitors
compatible),
first limited
+
Studio,
Design
and
completely
allows
which
and plug-in
Builder, BIM The
compatible),
first a
Simergy,
completelynumber
you+ more
Design
and
allows plug-in
which
and software
Builder,
OpenBIM
Italy; limited
Simergy,
compatible),
first
to +of
based
Studio,
completely
produce
you
allows
which
and plug-in
Builder,
Open software
software.
solutions
the on
compatible),
to number
based
Studio, software
competitors
and
the
Open
Italy;
completely
produce
you
allows
which
documents solutions
The
compatible),
to that
Simergy,
EnergyPlus
on of
Studio,
and
the
produce
you
allows
which BIM
software.
documents meet
solutions
that
Simergy, +
EnergyPlus
Design
based
compatible),
to valid and
produce
you
allows plug-in
the
cal-
which
documents
in meet
to The
that
Simergy,
Builder,
on based
valid the
produce
you
allows
which the
software
BIM
cal- meet
documents
into +
EnergyPlus
onOpen
based
valid the
produce
you
allows plug-in
the
documents
intosolutions
EnergyPlus
Studio,
on
valid the software
cal-
produce
you
documents
in that
EnergyPlus
to and
validproducecal- meet
Simergy
documenin solut
valid dc
to be
requirements used.
Among
range
Termus to be
requirementsFrom
of used.
Among
the
range
Termusto the
be
requirements
features,
(even From
of used.
examination
stand-alone
ifAmong
the
range to
features,
Termus
(even
the but the
be From
of
do used.
stand-aloneexamination
ifAmong
the
range
latter to
plug-in,
features,
not
(even
the but isthe
be From
of
of used.
examination
stand-alone
produce
do
range
latter
not these
ifAmong
the
the to
plug-in, the
be From
of
TermoLOG
requirements
features,
not but
really
is of two
used.
produce
do
rangeexamination
stand-alone
thethese
to
aplug-in,
documents
latter
not features,
Termus not
but
reallyparameters,
the
be
TermoLOG
plug-in
is From
of
of two
used.
stand-alone
produce
do
range
not examination
these
appears
(even to
aplug-in, parameters,
the
be
TermoLOG
requirements
documents
features,
not but From
oftwo
conforming
really
plug-in
but of used.
produce
do examination
rangethese
ifAmongthe
appears
to
documents
features,
Termus not
but parameters,
aplug-in,the
choice
TermoLOG
be From
of
the
conforming
atherefore
the program
plug-in
but of two
produce
do
latter examination
these
the
appears
theto
documents
afeatures,
to
(evennot
but parameters,
the
can
choice
TermoLOG
more
be
Italian of
conforming
range
program
is
but
to two
stand-alone
Among the
produce
do
not examination
be
these
the
appears
to
documents
if to not
but
complement
aengine,
the restricted
parameters,
complete
more
be can
choice
theof
standards.
ofItalian
conforming
program
reallyto two
the be
these
the
appears
to
features,
produce
do documents
latter to not restricted
parameters,
can
choice
astand-alone
plug-in,
complete
more
be
than of
to
standards.
complement Italian two
the
conforming
plug-in
isto produce
the
not be
these
the
to
documents
butto restricted
parameters,
completecan
choice
TermoLOG
more
be
than to
standards.
complementItalian
do two
conforming
really
but thenot be
the
plug-in,
the
documents
to
amain restricted
parameters,
acomplete
more can
choice
than to
standards.
produce
Italian
conforming
program
plug-in
the be
the
appears
TermoLOG restricted
complete
to can
choice
than to
standards.
Italian
conforming
documents
but
to be
atothe
to restricted
be can
thanchoice
to
appears
the
standards
complementItalian
program be
to
confmItre
sta tA
culation
a more ArchiCAD
Italy;
the competitors 
culation
a
theand
engine,
limited
more
include:
ArchiCAD
Italy; a
competitors
the
engine,
+and
Ecodesigner
limited
number
more
DesignItaly;
competitors 
include:
therefore
culation
a
the +and
limitedEcodesigner
number
of
more
Design
Builder,ArchiCAD
Italy;
software.
competitors 
include:
therefore
culation
a
the
quite
engine,
STAR
limited
number
of
more
Design
Builder,
Open
similar.
ArchiCAD
Italy;
software.
The
competitors
culation
a quite
engine,
andand
STAR
+
limited
number
of
moreBIM
Studio,
Design
therefore
similar.
Therefore,
Ecodesigner
Revit
Italy;
software.
Builder,
Open The
aandengine,
+ and
limited
number
+of +
more
Studio,
Design
and Ecodesigner
Revit
Energy
Italy;
plug-in
Builder,
Open BIM
software.
The
Simergy,
include:
therefore
Therefore,
a
the
quite
and
STAR
limited
number
+ofthe
+
more
Studio,
and plug-in similar.
software
Builder,
OpenBIM main
ArchiCAD
Energy
software. quite
Analysis,
Italy; and
The
competitors STAR
limited
number
Simergy, +of
based
the
Studio,
andOpen 
Revit
plug-in
software
BIM
include:
parameter
culation
similar.
main
Therefore,
Analysis,
software. quite
and
which
solutions
the The
Simergy,
on + ArchiCAD
number
+
basedof +
Studio,
parameter
plug-in similar.
software
BIM
competitors
Design
and
theto
Therefore,
Ecodesigner
Revit
Energy
software.to
have
which
solutions
Thethat
Simergy, +
EnergyPlus
on basedof
and
the
choose
+plug-in
Builder,
the
main
and
Therefore,
Energy
a
software
BIM
software.
meet to
Analysis,
+ similar
have
solutions
Thethat
Simergy, +
EnergyPlus
Design
on based
the
it
the
choose
therefore
Ecodesigner
STAR parameter
is
a
plug-in
the
Open
main
Analysis,
software
BIM
cal- meet similar
and
which
solutions
The
that
+
EnergyPlus
Builder,
on based
the
it
Studio,
the
parameter
is quite
Revit
plug-in
the STAR
software
BIM
cal- meet to
have
which
solutions
that
+
EnergyPlus
onOpenand
the
choose
+ similar.
parameter
Energy
and
a
plug-in
the
software
cal- meet to
similar
have
solutions
that
Simergy,
EnergyPlus
Studio,
it
choose
Revit Therefore,
the is
a
software
cal- meet to
Analysis,
similar
+
solutions
and that
based
it
choose
Energy
the
cal-
ismeet
Simergy
the
wh
solut
tha
on d th
first
Among first
completely and firstcompletely and compatible),
completely compatible), which
compatible),
first allows
which
and completelyyou
allows
which first
to produce
you
allows
and compatible),
to completely
produce
you documents produce
which
documents
compatible),
valid allows
documents
in valid
you
which into validproduce
allows in you
documents to produce valid
culation range
Termus
ArchiCAD
requirements culation ofAmong
requirements
the
range
features,
Termus
(even
ArchiCAD
engine, include:
stand-alone
culation
+andofifAmong
the
Termus
(even
the
Ecodesigner
requirementsArchiCAD
engine, include:
stand-alone
culation
features, but+and ifAmong
do the
range
latter plug-in,
Ecodesigner
requirements
therefore engine, not
(even
the
ArchiCAD
include:
therefore
stand-alone
culation
but+is
STAR ofifAmong
the
produce
do
range
latter
not plug-in,
Ecodesigner
requirements
quite
engine,
and ArchiCAD and
features,
not
the
include:
TermoLOG
stand-alone
really
+is
STAR ofAmong
the
produce
latter
not
Termusaplug-in,
Ecodesigner
requirements
therefore
similar. quite
engine,
and Revit
ArchiCAD TermoLOG
and
documents
features,
but
really
STAR
include:
stand-alone
plug-in
+is Among
do
notappears
theaplug-in,
documents
+Ecodesigner
requirements
therefore
similar.
Therefore,
quite
and Revit
ArchiCAD
Energy not
(even
include:
TermoLOG
culation
but
and
STARstand-alone
Among
+conforming
really
plug-in
but appears
the
produce
dorange
if to
Termusaplug-in,
+Ecodesigner
requirements
therefore
similar.
Therefore,
quite the Revit
ArchiCAD
Energy TermoLOG
not
Analysis,
and+be
asimilar.
the
include:
main
stand-alone
but
STAR
Therefore,
quite
the
conforming
program
plug-in of
+latter
engine,
the
appears
the
produce toplug-in,
documents
(even
Ecodesigner
Revit
Energy TermoLOG
more
afeatures,
to be
stand-alone
Among
+Italian
range
program
Analysis,
and
include:
parameter
culation
similar.
main is
whichbut
STARto
Therefore,
andthe
the
not
ifappears
toplug-in,
complete
documents
to TermoLOG
complementmore
but
atherefore
the
+Ecodesigner
Revit
Energy
parameter
be
program
really
Analysis,
have
and
which
engine,
main STARto
Therefore,
to
the
standards.
ofItalian the
conforming
+latter
the
choose
appears
to
astand-alone
features,
do plug-in,
complete
TermoLOG
notmore
complement
Revit
Energy
aAnalysis,
parameter
main
andto
be
than
standards.
plug-in
is
similar
have
and
which
STAR
quiteto+the
the
it
the
conforming
not appears
produce
abutto
tocomplete
TermoLOG
more
complement
Revit
Energy
choose
therefore
parameter
is
be
than
Italian
do
really
Analysis,
similar.
mainto but
similar
have
and
which plug-in,
+the
it
the
appears
not ato
Revit
Energy
choose acomplete
documents
to
parameter
is quite
more
be
than
standards.
produce
Italian
program
aAnalysis,plug-in
similar
have
which
Therefore,
to +the
it
the
appears
TermoLOG
to
complete
Energy more
aAnalysis,
choose
similar.
is
be
than
but
similar
have to
which
to the
it
the
standards.
conforming
documents
choose
to
complete
more
complement
amain be
than
appears
program
aAnalysis,
similar
have
Therefore,
is which the
a to
it param
is
com
conf
sim
havm
wh
the
th
It t
Italy;
the competitors the Italy;
competitors
the DesignItaly;
competitors the Design
Builder,
competitors the Design
Builder,
Open
competitors the Studio,
Design Italy;
Builder,
Open
competitorstheStudio,
Design
and
Builder,
Opencompetitors
Simergy, the Studio,
Design
and
Builder,
Open Italy;
competitors
Simergy,
based
Studio,
Design
and
Builder,
Open the
Simergy,
on based
Studio,
competitors
Design
and
Builder,
the
Open Simergy,
EnergyPlus
on based
Studio,
and
Builder,
the
Open Simergy,
EnergyPlus
Design
on based
Studio,
and
the
Open
cal- Simergy,
EnergyPlus
Builder,
on based
Studio,
and
thecal- Simergy,
EnergyPlus
onOpen
based
and
thecal- Simergy,
EnergyPlus
Studio,
on based
thecal- EnergyPlus
and
onbasedthecal-
SimergyEner
on th
first
range
Among andoffirst
completely
range
features,
Among
the andoffirst
rangecompletely
features,
stand-alone
the but and compatible),
of
do
range
stand-alone
Amongcompletely
features,
not
plug-in, but compatible),
of
produce
do
range
features,
Among
the not
plug-in, butwhich
compatible),
of
TermoLOGfirst
produce
do
range
documents
stand-alone
the allows
features,
not
but which
and
TermoLOG of
produce
do
range
stand-alone completely
documents
features,
not
appears
plug-in,you
allows
but which first
to
conforming
of
produce
dorange
Among
appears
to produce
you
documentsallows
features,
not
but and
plug-in,
TermoLOG
be compatible),
conforming
of to
produce
do
the completely
produce
you
documents
features,
theto not
but documents
Italian
conforming
TermoLOG
more
be to
produce
do produce
documents
stand-alone
Among the to not
appearsbut which
documents
compatible),
standards.
Italian
conforming
complete
more produce
thedo valid
documents
not
appears
to allows
documents
in
standards.
Italian
conforming
stand-alone
plug-in,
complete
be
than producevalid
you
documents
the to which in
standards.
Italian to
conforming
TermoLOG
more
be
than validproduce
documents
to
plug-in,
the allows inappears
standards.
Italian
conforming
complete
more to you
documents
standards.
TermoLOGItalian
conforming
complete
than totoproduce
standards
Italian
be
than
appears
the valid
to d
sta
mIt
culation Termus
ArchiCAD culation Termus
engine, (even
ArchiCADculation
+and ifTermus
engine, (even
the
Ecodesigner
ArchiCAD culation
therefore latter
+and ifTermus
(even
the
Ecodesigner
engine, thereforeculation
+is
STAR
quite latter
not
ifTermus
(even
the
Ecodesigner
engine,
and culation
therefore
similar. really
andis
STAR
quitelatter
not
engine,
and if
Termus
Revit aculation
(even
the
ArchiCAD really
andplug-in
is
STAR
therefore
similar.
Therefore,
quite +latter
engine,
and not
if
Termus
Revit aculation
(even
the
Energy
therefore
similar. really
and
Therefore, plug-in
+is
quitebut
+latter
not
if
Termus
(even
atherefore
the
aprogram
Ecodesigner
engine,
and
the Revit
ArchiCAD
Energy really
Analysis, plug-in
similar.
main is
but
Therefore,
quite +latter
engine,
andthe not
ifEnergy
(even
atherefore
the
awhich
program
really
Analysis,
parameter
culation plug-in
+is
but
STAR
similar.
main to
Therefore,
quite
and latter
not
ifcomplement
atherefore
the
ahave
Ecodesigner
the program
really
Analysis,
and
parameter plug-in
is
which
engine,
similar.
main but
to
Therefore,
to
quite latter
the notcomplement
aasimilar.
Revit
choose asimilar
program
really
have
parameter
main
and plug-in
is
whichbut
STARto
Therefore,
to
quite +the
the
it notcomplement
aasimilar.
asimilar
Energy
choose
therefore program
really
have
and
parameter
is main plug-in
but
to
Therefore,
to the
the
it complement
amain
Revit asimilar
program
aAnalysis,
choose
parameter
is quite plug-in
but
to
Therefore,
to +the
the
it complement
amain
Energy
choose
similar.
parameter
is program
but
to
which
to the
the
it
choosecomplement
amainprogram
Analysis,
have
Therefore,
parameter
is to tothe
it comp
a sim
choose
param
is tot
wh
the
Italy;
the competitors
Among the Italy;
competitors
Among
the DesignItaly;
stand-alone
Among
the the Design
Builder,
competitors
stand-alone
Among
theplug-in,the Builder,
Open
competitors
stand-alone
Among
theplug-in, Studio,
Design
Open
TermoLOGItaly;
stand-alone
Among
the Studio,
Design
and
Builder,
plug-in,
TermoLOG Simergy,
stand-alone
Among
appears
the the
plug-in, and
Builder,
Open
TermoLOG Italy;
competitors
Simergy,
stand-alone
Among
appears
theto based
Studio,
Open
plug-in,
TermoLOG
be
stand-alone
thethe on
appears
theto based
Studio,
competitors
Design
and
the
plug-in,
TermoLOG
more
be
stand-alone
theSimergy,
EnergyPlus
on
appears
to and
Builder,
the
plug-in,
complete
TermoLOG
more
be Simergy,
theEnergyPlus
Design
based
appears
toplug-in,
completeOpen
cal-
TermoLOG
more
be
than the Builder,
on based
appears
to Studio,
the
complete cal-
TermoLOG
more
be
than theEnergyPlus
onOpen
appears
to and
the
complete
more
be
than theSimergy,
EnergyPlus
Studio,
appears
to
complete
more
be cal-
than the and
tobased
complete
more
be
thancal-
Simergy
the on th
first
range ofrange and first
completely
features, and first
ofrangecompletely
features, and
butof compatible),
firstcompletely
dofeatures,
not and compatible),
but producefirst
do notcompletely which
andcompatible),
first
but produce
do
rangecompletely
documents allows
not of which
and compatible),
first
producecompletely
documents
features, you
allows
which
and compatible),
first
to
conforming
rangecompletely
produce
you
documentsallows
but which
and compatible),
conforming
of to completely
dofeatures, produce
you
tonot allows
which
documents
compatible),
Italian
conformingto
produce produce
tobutyou
allows
which
documents
compatible),
standards.
Italiando to valid
produce
you
documents
tonot allows
which
documents
in
standards.
Italian to
producevalid
produce
you
allows
which
documents
in
standards. to
conforming validproduce
you
documentsallows
documents
into validproduce
you
documents
to Italian in
conformingtovalidproduce
documenin
standards to m
com
valid th
d
It
the
culation ArchiCAD
competitors the
culation ArchiCAD
engine,
competitorsthe +and
Ecodesigner
DesignArchiCAD
engine, therefore
competitors the +and
culationEcodesigner
Design
Builder, therefore
competitors theSTAR
+Open
culation
quite Ecodesigner
engine,
Design
Builder, similar.
competitors the
and
STAR
quite
engine,
and
Studio,
Design Revit
ArchiCAD
Builder,
Open
competitors and
theSTAR
therefore
similar.
Therefore,
and
Studio,
Design
and +competitors
Builder,
Open Revit
Energy
Simergy, the
therefore and
Therefore, +Open
culation
quite +Ecodesigner
the
Studio,
Design
and
Builder, Revit
ArchiCAD
Energy
Analysis,
similar.
main
competitors quite
Simergy,
based + parameter
engine,
the
Studio,
Design
and
Builder,
Open Energy
Analysis,
culationwhich
Simergy,
on STAR
similar.
main +and
Therefore,
based
Studio,
Design
and Ecodesigner
Builder,
the
Open Analysis,
have
and
parameterwhich
therefore
engine,
Therefore,
to
Simergy,
EnergyPlus
on based the
Studio,
and
Builder,
the
Open Revit
chooseaSimergy,
similar
have
main
andwhich
toSTAR
quite
EnergyPlus
on based +therefore
the
it
Studio,
and
the
Open
cal- Energy
aSimergy,
choose similar
have
and
parameter
is similar.
main
EnergyPlus
on based it
Studio,
and
the Revit
aAnalysis,
similar
parameter
cal-is quite
Therefore,
to
Simergy,
EnergyPlus
on based
and
the+similar.
Energy
choose
cal- which
to
Simergy,
EnergyPlus
on based the
theit
choose Analysis,
have
Therefore,
cal- is main
EnergyPlus
onbased it
the aEner
param
cal-is sim
on wh
the th
Italy;
Among Italy;
Among
the Italy;
stand-alone
Among
the Italy;
stand-alone
theplug-in, Italy;
stand-alone plug-in, TermoLOGItaly;
Among plug-in,
TermoLOG Italy;
appears
the TermoLOG Italy;
stand-alone
Among
appears
tobut be theappears
thetoplug-in,
more
be
stand-alone
the tocomplete
TermoLOG
more
be do the plug-in,
complete
more
than appears
complete
TermoLOG
than to be than the
appears more to
complete
be the m th
range ofrange
features, ofrange
features, but of
do features,
not but produce
do not but produce
do
range
documents
not of
produce
documents
features, conforming
range
documents conforming
of
do features,
to not Italian
conforming
produce to but
standards.
Italian documents
to notstandards.
Italian
produce standards.
conforming
documents to Italian
conforming standards to It
culationArchiCAD
the competitors culation
engine,
ArchiCAD
the competitors culation
the
engine,
+and
Design
therefore
Ecodesigner
ArchiCAD
competitors culation
engine,
+and
Design
Builder,
therefore
Ecodesigner
ArchiCAD culation
quite
engine,
+and
STAR
Design
Builder,
Open
therefore
similar.
Ecodesigner
ArchiCAD culation
quite
engine,
+and
and
STAR
the Ecodesigner
Studio,Revit
ArchiCAD
Builder,
Open
competitorsculation
therefore
similar.
Therefore,
quite
andengine,
+and
STAR
Studio,
and Open
therefore
similar.
+Ecodesigner
Revit
ArchiCAD
Energy
Simergy, culation
Therefore,
quite
andengine,
+and
STAR
the
the therefore
similar.
main
Therefore,
+Ecodesigner
Studio,
Design
and Revit
ArchiCAD
Energy quite
Analysis,
competitorsand
Simergy,
engine,
+and
STAR
based
and
the parameter
therefore
similar.
+Ecodesigner
Builder, Revit
Energymain
Therefore,
Analysis,quite
and +and
which
Simergy,
on STAR
based
the parameter
therefore
similar.
main
Therefore,
+Ecodesigner
Design
the
Open Revit
Energy to
quite
Analysis,
have
and
which
STAR
EnergyPlus
on based
the
choose
+ parameter
Studio,
Builder,
the
similar.
main
RevitTherefore,
Energy to
quite
aAnalysis,
similar
have
and
which
STAR
EnergyPlus
on and
the
it
the
choose
+ parameter
Open
cal-
is
Revitsimilar.
main
Therefore,
Energy to the
aAnalysis,
similar
have
and
which
Simergy,
EnergyPlus
it
choose
+ parameter
Studio,
cal-
is
Revitmain
EnergyTherefore,
to the
aAnalysis,
similar
have
which
based
and
it
choose
+ parameter
cal-
is main
Energy to the
aAnalysis,
similar
have
which
Simergy,
on
it
choose
parameter
ismain
theaAnalysis,
to it
similar
have
which
EnergyPlus
based
choose
param
is
a on to
sim
hav
wh th
Among
range ofAmong
the
range
features, stand-alone
ofAmong
the
range
features, but stand-alone
of
do the
range plug-in,
features,
not but stand-alone
of
produce
do
range plug-in,
features,
not TermoLOG
but ofAmong
produce
do
range plug-in,
documentsTermoLOG
features,
not
but of appears
the
produce
do
range
documents
features,
not TermoLOG
but stand-alone
Among
appears
conforming
of
produce
dorangetonot
documents be
features,
but the
conforming
of appears
the
produce
do toplug-in,
documents more
features,
to not
but be
stand-alone
Italian the
conforming
produce
do tocomplete
documents
to TermoLOG
notmore
but be
standards.
Italian the
conforming
produce
do plug-in,
complete
documents
to notmore
than
standards.
Italian
conforming appears
produce complete
TermoLOG
documents
to than
standards.
Italian
conforming to
documents
to be
than
standards.
Italian the
conformingappears
to more
standards.
Italian
conforming to
complete
to be the
standards
Italian to m th
sta
It
culationculation engine,culation engine,
and therefore engine,
and therefore quite
and therefore
similar. culation
quite similar.Therefore,
quite
engine, similar.
Therefore,
culation
and
the therefore
main
Therefore,
engine,
the parameter
main quite
andthe parameter
therefore
similar.
mainto choose parameter
Therefore,
to
quite it
choose
issimilar.
to theit
choose
ismainTherefore,
it parameter
is the main to choose param
the competitors the competitors theDesign
competitors Design
Builder,Design Builder,
Openthe Studio,
Builder,
Open
competitors Studio,
and Open Simergy, the
Studio,
Design
and competitors
Simergy,
based
and
Builder, Simergy,
on based
Design
the
Open EnergyPlus
on based
Studio,
Builder,
the EnergyPlus
onand the
Open
cal-Simergy,
EnergyPlus
Studio,
cal- based and cal-Simergy,
on the EnergyPlus based on th
AmongAmong the stand-alone Among
the stand-alone Among
theplug-in, stand-alone
Among
theplug-in, TermoLOG
stand-alone
Among
the plug-in,
TermoLOG
stand-alone
Among
appears
the plug-in,TermoLOG
stand-alone
Among
appears
thetoplug-in,
TermoLOG
be
stand-alone
theappears
thetoplug-in,
TermoLOG
more
be
stand-alone
the
appears
toplug-in,
complete
TermoLOG
more
be the appears
toplug-in,
complete
TermoLOG
more
be
than theappears
tocomplete
TermoLOG
more
be
than the
appears
tocomplete
more
be
than the
appears
to
complete
more
be
than the to
complete
more
be
than thecom m th
culationculation engine,culation engine,
and therefore engine,
and therefore quite
and therefore
similar. culation
quite similar.Therefore,
quite
engine, similar.
Therefore,
culation
and
the therefore
main
Therefore,
engine,
the parameter
main quite
andthe parameter
therefore
similar.
mainto choose parameter
Therefore,
to
quite it
choose
issimilar.
to theit
choose
ismainTherefore,
it parameter
is the main to choose param
the competitors the competitors theDesign
competitors theDesign
Builder,
competitors theDesign
Builder,
Open
competitors the
Studio,
Design
Builder,
Open
competitors the
Studio,
Design
and
Builder,
Opencompetitors
Simergy, the
Studio,
Design
and
Builder,
Open
competitors
Simergy,
based
Studio,
Design
and
Builder,
Open Simergy,
on based
Studio,
Design
and
Builder,
the
Open Simergy,
EnergyPlus
on based
Studio,
and
Builder,
the
Open Simergy,
EnergyPlus
on based
Studio,
and
the
Open
cal-Simergy,
EnergyPlus
on based
Studio,
and
thecal-Simergy,
EnergyPlus
on based
and
thecal-Simergy,
EnergyPlus
on based
thecal-EnergyPlus
onbasedthecal-Eneron th
designer. Thus, it nullifies the advantages of the BIM workflow. If the model was correctl
set, the ArchiCAD + Ecodesigner STAR solution automatically performs the transition
from the BIM model to the BEM model. It has the great advantage of not losing any infor
mation present in the BIM and recording in real time in the BEM model all the change
Appl. Sci. 2021, 11, 2252 11 of 31
made to the BIM model. It enhances the aim of BIM design.
These considerations can be summarized in graphs in Figure 2.

Figure2.2.Comparison
Figure Comparisonof the analyzed
of the tools.tools.
analyzed
Each figure represents a tool. The vertexes are four main characteristics: Versatility,
Each figure
compliance with therepresents
standards,acertification,
tool. The vertexes
and the are four main characteristics:
“workflow-continuity”. Versatility
This latter
compliance
identified with the standards,
the advantage of not havingcertification, and
to open another the “workflow-continuity”.
software to conduct energy analysis. This latte
identified the advantage of not having to open another software to conduct
It leads to less interoperability since the changes made to the BIM will not be directly energy anal
ysis. It leads
reported in BEM.to less
Theinteroperability since
value related to the the changes
“versatility” made
was to the according
associated BIM will not be directl
to the
number
reported of in
features
BEM. available
The value (e.g., Open to
related Studio has 3/5 features,
the “versatility” wassoassociated
the value of its ver- to th
according
satility
number is of
0.6). The value
features related(e.g.,
available to theOpen
“compliance with3/5
Studio has thefeatures,
standard” sowas
the calculated
value of its versa
according to the number of standards complied with, e.g., Allplan + AX-Energia complies
tility is 0.6). The value related to the “compliance with the standard” was calculated ac
with 1/3 standards, so the value is 0.33. The value of the certification is equal to 1, if the
cording to the number of standards complied with, e.g., Allplan + AX-Energia complie
tool is certified, and 0 if it is not certified. The value of the workflow-continuity is equal to
1, if the tool has this characteristic, and 0 if it does not.

5. Modelling and Pre-Analysis of a Simplified Building


As a first step, the energy analysis of an apartment in a three-story building was
carried out to study the characteristics of the software using EcoDesigner STAR, a plug-in
for ArchiCAD. It allowed highlighting the main calculation characteristics and detecting
the first advantages and disadvantages of using this tool.
The choice was determined by the value and also by the simplicity of the building,
which allows us to control the result of the simulation process more precisely.
The structure is made up of a reinforced concrete frame made of rectangular section
beams and pillars (30 × 60 cm). The indoor walls are composed of non-insulated brick
blocks. It was geo-located in the city of Palermo. As regards the immediate surroundings,
it was decided to consider it not bordering other buildings.
The construction of the BIM model was carried out using the construction components
and materials already present in the program library. In this way, possible conflict situations
were avoided to better control the process. Figure 3 shows the three-dimensional view of
the building with the apartment examined in evidence.
beams and pillars (30 × 60 cm). The indoor walls are composed of non-insulated brick
blocks. It was geo-located in the city of Palermo. As regards the immediate surroundings,
it was decided to consider it not bordering other buildings.
The construction of the BIM model was carried out using the construction compo-
nents
Appl. Sci. 2021, 11, 2252 and materials already present in the program library. In this way, possible conflict 12 of 31
situations were avoided to better control the process. Figure 3 shows the three-dimen-
sional view of the building with the apartment examined in evidence.

Figure 3. Three-dimensional view of the building with the apartment examined in evidence.
Figure 3. Three-dimensional view of the building with the apartment examined in evidence.

5.1. Switching to the Building Energy Model


Once the5.1.
BIMSwitching to the
model was Buildingthe
obtained, Energy Model
missing information was implemented for the
construction of theOnceBEMthemodel.
BIM model was obtained,
In particular, the missing
data related to theinformation
project site was
and implemented
its loca- for the
construction
tion with related climaticofdata
the BEM model. In particular,
(air temperature, relativedata related solar
humidity, to theradiation,
project siteandand its location
with speed
analysis of wind relatedand
climatic data (air
direction) temperature,
were relative
included. The humidity,
software solar radiation,
can download auto- and analysis
of wind speed and direction) were included. The software can
matically the information from the Strusoft Climate Server. The Strusoft server bases its download automatically
climate data on those provided by “Reanalysis NCEP” available on the website of the climate data
the information from the Strusoft Climate Server. The Strusoft server bases its
“NOAA-Cires onClimate
those provided
DiagnosisbyCenter”.
“Reanalysis NCEP” available
The information on the
obtained waswebsite
compared of the
with“NOAA-Cires
Climate
the climatic data usedDiagnosis Center”. The
by the EnergyPlus information
calculation obtained
engine. was compared
It is based on the data with the climatic data
collec-
i. 2021, 11, x FOR PEER REVIEWtion commonlyused by theasEnergyPlus
known calculation
“IGDG—Climatic data engine. It is based
G. De Giorgio” [43]on the data
(Figure 4). collection
13 of 32 commonly
known as “IGDG—Climatic data G. De Giorgio” [43] (Figure 4).

Figure 4.Figure
On the4.left
Onthe
theclimatic
left the climatic data obtained
data obtained from thefrom the server,
Strusoft Strusofton
server, on the
the right the right the data
climatic climatic
G. De Giorgio.
data G. De Giorgio.

The comparison shows that the climatic data used by the EcoDesigner STAR calcula-
tion engine are in compliance with those used by the EnergyPlus calculation engine, with
maximum and minimum temperatures very close to each other:
Figure 4. On the left the climatic data obtained from the Strusoft server, on the right the climatic
Appl. Sci. 2021, 11, 2252 data G. De Giorgio. 13 of 31

The comparison shows that the climatic data used by the EcoDesigner STAR calcula-
tion engine are in compliance
The comparison with
shows that thethose used
climatic byused
data the EnergyPlus calculation
by the EcoDesigner STAR engine,
calcula- with
maximum and
tion engine minimum
are temperatures
in compliance with those very
used close
by theto each other:
EnergyPlus calculation engine, with
 maximum
Maximumandtemperature:
minimum temperatures very close to
36.9 °C—minimum each other: 4.62 °C (Strusoft);
temperature
◦ ◦ C (Strusoft);
 • maximum
Maximumtemperature:
temperature: 34.0
36.9 °C—minimum
C—minimum temperature
temperature4.624.79 °C (EnergyPlus).
• maximum temperature: 34.0 ◦ C—minimum temperature 4.79 ◦ C (EnergyPlus).
It was supposed that the slight deviations between the monthly temperatures were
It was supposed that the slight deviations between the monthly temperatures were
due to the different time intervals relied on for data collection. In particular, the Ener-
due to the different time intervals relied on for data collection. In particular, the EnergyPlus
gyPlus data refer to a period ranging from 1951 to 1970; while those of the Strusoft servers
data refer to a period ranging from 1951 to 1970; while those of the Strusoft servers are
areupdated
updatedfrom
from19481948
to to today.
today. Then,
Then, thethe areas
areas of the
of the building
building characterized
characterized by thebysame
the same
orientation, by the same usage profile and above all by the same system (thermal
orientation, by the same usage profile and above all by the same system (thermal blocks) blocks)
were defined
were defined(Figure
(Figure5).
5). ItIt was
was possible
possible totoidentify
identify only
only two
two thermal
thermal blocks
blocks (Figure
(Figure 4): that
4): that
of the
of the heated
heated roomsand
rooms andthat that of the
the unheated
unheatedrooms.
rooms.

Figure 5. Screen
Figure of the
5. Screen thermal
of the thermalblocks
blockswindow with3D
window with 3Dvisualization
visualizationof of
thethe selected
selected zones.
zones.

For each block, an operating profile and a plant system (heating, air conditioning,
and ventilation) were set. The software includes different operating profiles (residential,
commercial activity, hotel, cinema, museum, and others), but it was chosen to have a
more complete overview of the program and its potential, to create a new one. As for the
most common software, it is possible to select different schedules for different seasons:
One for the summer season (for the cooling plant) and one for the winter season (for the
heating plant).
It is possible to assign several thermal blocks to a single system or to assign a specific
one to a single thermal block. In particular, it is possible to set the use of a boiler for heating
and the production of domestic hot water to several thermal blocks; while the cooling
system is, if made with single units serving only one room at a time, it must be assigned
for each air-conditioned block. In this case, there is only a natural gas boiler for heating
and the production of domestic hot water. Furthermore, there is no type of summer air
conditioning and the ventilation is natural as it is normally the case in common homes.
The data relating to the autonomous heating system are very simplified. It is possible
to select the nominal power of the element, the type of control (with internal/external
sensor or by manual ignition), the type of energy source used, the cost of the energy used,
in order to obtain an estimate of the costs and consumption of that particular system. On
the other hand, the items relating to terminals are completely missing.
Appl. Sci. 2021, 11, 2252 14 of 31

It is not possible to set the number of terminals and their performance. They can be
inserted as elements within the model, but they do not interface with the plug-in during the
calculation. For a more accurate analysis, it should be necessary to use an external program
that includes these attributes. In general, the number of parameters that can be selected is
less than the parameters available in the most common software for energy analysis.
For natural ventilation, the parameters to be set are accompanied by an hourly sched-
ule. In this case, it was set to keep the “system” active all year round. In the case of
mechanical ventilation, it is certainly useful for calibrating the best usage profile. In addi-
tion, it is also necessary to specify the air changes by choosing from four different units of
measurement. Furthermore, it is possible to select a function that uses automatically the
standard ASHRAE values.
Once all the elements of the building and their materials are set, it is possible to conduct
the calculation of the thermal bridges. Before proceeding with the calculations, the plug-in
updates the model with the latest changes and automatically detects errors or warnings,
which, if not resolved, do not allow it to continue with the simulation. Solving any errors
and starting the simulation, EcoDesigner STAR compiles a final report of the simulation.

5.2. First Results of the Analysis


According to the aim of this paper, some advantages and disadvantages were detected
already in this step. The main advantages are:
• Automatic construction of the BEM starting from BIM: The model obtained contains in
itself a lot of fundamental information for energy analysis, so a few other parameters
must be integrated;
• constant updating: Any type of modification made on the BIM model is automat-
ically reflected in the BEM and in the EcoDesigner STAR cards, without any loss
of information;
• reliability: The climatic data of the Strusoft server comply with other types of data
used by certified analysis programs (see EnergyPlus); furthermore, the calculations are
consistent with the parameters set and the result, for example, in terms of consumption,
and is plausible if compared with similar buildings;
• good definition of the parameters: The thermo-physical attributes on which one can
act are many, allowing us to represent even the most complex elements;
• optimized workflow: Thanks to the use of a single software and a single type of file, it
is possible to work quickly and accurately without the loss of data that may occur in the
passage of the file from one program to another. Furthermore, all EcoDesigner STAR
tools are best calibrated to operate without conflicts with those present in ArchiCAD;
• design support: This tool is not to be used a-posteriori, or after the project is finished,
to know only its behavior from an energy point of view. It must be used during the
design phase to ensure the maximum result in terms of performance; so, the final
simulation refers to a building designed in a truly sustainable way.
Even if they are not many and do not affect the use of the program, some constraints
were found and listed following:
• Poor definition of the parameters relating to the systems (especially heating);
• and therefore, it is not possible to insert the calculation of terminals of any kind or the
performance of the heating systems. It makes the calculation of these aspects more
limited. For this reason, further investigations with other programs should be carried
if necessary.
• A separate reasoning must be made for thermal bridges. They are connected to the
ArchiCAD Detail tool and they are configured as separate 2D drawings. If a material
or a type of construction element changes, the individual modification must be made
on the detail and the thermal bridge recalculated. Generally, this operation is not long
and it is easy, but for large architectural complexes with numerous thermal bridges
where changes need to be made, it is long and hard.
Appl. Sci. 2021, 11, 2252 15 of 31

6. Application of the Methodology on an Existing Case Study


In order to verify their correctness, the procedures for the energy analysis in the BIM
environment, developed on a sample building, have been tested on a sample building.
Indeed, only a building complete in all its parts can provide the necessary information,
especially from the plant engineering point of view. Furthermore, in an existing building,
the systems have already been measured and have precise characteristics. They can be
traced back by recovering the technical sheets drawn up by the manufacturers. The research
of the case study was conducted by preliminarily defining some characteristics that the
case study building must possess. The aim was to validate the methodology and the final
results of the energy simulation. These features are:
• End use: The residential end-use is the one of greatest application interest, as well
because many policies aimed to reduce consumption of residential architecture;
• simplicity of the case study: Both in terms of geometric or constructive characteristics,
in terms of thermal zones and for the absence of peculiar characteristics (e.g., under-
ground habitable rooms, large glazed areas, or systems designed ad hoc and different
from the more common types);
• size: It is a medium size building. It implies the exclusion of individual housing units
exposed to the external environment on all sides (this condition would prevent testing
all the potential of the software), i.e., large apartment complexes consisting of a few
thermal zones, but repeated for several floors (in this case there would be a large
amount of data, not very significant from the point of view of the calculation), i.e.,
considering a 7-storey condominium, in the calculation phase, the significant floors
are the ground floor that exchanges heat with the ground, the floor that borders two
heated rooms both above and below, and the top floor that exchanges heat with the
outside through the cover. For the purposes of this study, it would be enough to
consider only one of the 5 floors bordering heated rooms. A good compromise is
therefore offered by buildings with two (or rather three) elevations above ground;
• building envelope and thermal plants: All the information about stratigraphy, fixtures,
and materials were known or can be inferred with a good approximation;
• it is an existing building.

6.1. Case Study Modelling


As said, this case study was selected as an important sample of existing architecture
characterized by the main data available, and, as well in this case, for simplicity. This
latter concerns both the spatial and architectural quality of the building or housing, and
the relationships with the ground and the characteristics of use that allow more effective
control of the BEM energy analysis. The chosen building, in fact, has simple thermal zones,
with no particularities (of use or construction) that can alter the calculation of the energy
simulation. It is characterized by a simple structure, and a regular plan, with essential
thermal zones (with a common residential type of user profile). It is a residential building
and has three apartments distributed over three floors above ground connected by an
external staircase. Only the apartment on the first floor was chosen.
It must be specified that some simplifications regarding the articulation of the architec-
tural and climate artefact can be made, where necessary, to ensure greater control over data
processing by the software. Moreover, some simplifications, e.g., regarding the articulation
of the architectural and climate artefact, were made. It endured greater control over data
processing by the software.
The selected building met all the necessary characteristics: The Langham House Close
residential complex in Richmond (England), designed by James Stirling.
The apartment building consists of 18 residential units. They are spread over three
elevations above ground (6 per floor). There are 3 different types of apartments, all based
on the same floor plan, which differ in the number of rooms:
• 3 apartments with one bedroom (approx. 65 m2 );
Appl. Sci. 2021, 11, 2252 16 of 31

• 9 apartments with two bedrooms (approx. 75 m2 );


• 6 apartments with three bedrooms (approx. 85 m2 ).
The three smaller apartments, all on the ground floor, are identical to the apartments
with two bedrooms. One of the rooms is intended for the service of condominiums,
as an accessory storage. There are also three two-bedroom apartments on the ground
floor. On the next floor, there are three two-bedroom apartments and three three-bedroom
apartments; the same distribution is repeated on the second and last floor.
At each level, a pair of housing units are served by a common stairwell; one block
Appl. Sci. 2021, 11, x FOR PEER REVIEW 17 of 32
includes 6 apartments on 3 levels, served by a stairwell; the residential complex consists of
3 blocks (Figures 6 and 7).

Figure 6. Plans of the building.


Figure 6. Plans of the building.
Appl. Sci. 2021, 11, 2252 17 of 31
Appl. Sci. 2021, 11, x FOR PEER REVIEW 18 of 33

Figure 7. Section ofFigure 7. Section of the building.


the building.
The entire structure is in load-bearing masonry, consisting of solid bricks (215 × 102.5
The complex× is located in a suburban area of London, characterized by a low popula-
65 mm) and 10 mm lime mortar joints. The wall structures are differentiated into three
tion density and types:
a strong natural presence; the residential complex is open on all fronts
and is surrounded• byThetrees [44].perimeter walls are cavity walls, very recurrent in English houses of the
external
The entire structure is of
first half inthe
load-bearing masonry,
twentieth century; consisting
they have of solid ofbricks
an overall thickness (215mm
about 270 ×
102.5 × 65 mm) and 10 (solid
mm brick of 102.5
lime mm—air
mortar gapThe
joints. of about
wall65structures
mm—solid brick of 102.5 mm);
are differentiated into
• the internal perimeter walls separate the apartments from each other and from the
three types:
staircase body; they are entirely in solid bricks without cavities and have a thickness
• The external perimeter
of 215 mm walls areofcavity
(length a singlewalls,
brick); very recurrent in English houses of the
• the internal dividing walls
first half of the twentieth century; they have are the partitions
an overallof the houses, formed
thickness by individual
of about 270 mm
courses of bricks (102.5 mm thick).
(solid brick of 102.5 mm—air gap of about 65 mm—solid brick of 102.5 mm);
Each apartment is characterized by the presence of a central block, where the fire-
• the internal perimeter walls separate the apartments from each other and from the
place is located, and the plant room; this block is in load-bearing masonry and plays a
staircase body;
decisive role inentirely
they are in solid
the load-bearing bricksofwithout
structure cavities and have a thickness
the building.
of 215 mm (length of a single
Regarding brick); the load-bearing masonry is combined with reinforced con-
the structure,
• the internal crete
dividing
beams walls are the
characterized by partitions
a rectangularof the houses,
section formed
(27 × 35 cm). by individual
They work as curbs for
the distribution
courses of bricks (102.5 mm of loads of the upper floors. Outside, the elevations are characterized by
thick).
the alternation between brick and concrete. In addition to the beams, visible directly from
Each apartment is characterized
the outside, byreinforced
there are other the presence of elements,
concrete a centralsuch
block, where
as the the gargoyles,
U-shaped fireplace
is located, and thetheplant room;
ventilation this block
openings, is in
and the load-bearing
panels masonry
under the windows. and
These plays
latter a to
serve decisive
further
stiffen the floors, linking the
role in the load-bearing structure of the building.masonry with the reinforced concrete of the beams and floors
[45].
Regarding the structure, the load-bearing masonry is combined with reinforced con-
crete beams characterized by a rectangular section (27 × 35 cm). They work as curbs for
the distribution of loads of the upper floors. Outside, the elevations are characterized by
the alternation between brick and concrete. In addition to the beams, visible directly from
the outside, there are other reinforced concrete elements, such as the U-shaped gargoyles,
the ventilation openings, and the panels under the windows. These latter serve to fur-
ther stiffen the floors, linking the masonry with the reinforced concrete of the beams and
floors [45].
The floors are reinforced slabs, made together with the beams and panels under
the windows. Their stratigraphy, described from bottom to top, varies according to the
reference plane:
Appl. Sci. 2021, 11, 2252 18 of 31

• Ground floor slab: This slab rests directly on the ground and is composed of a bed
of compacted materials (generally stones, bricks, concrete) of about 20 cm thick, by a
15 cm cast-in-situ reinforced concrete slab, by a layer of bitumen, from a 3 cm screed,
from a 1 cm floor, mainly made of wood and stoneware;
• floor slab: 1–1.5 cm lime-based plaster, 15 cm cast-in-situ reinforced concrete slab,
bitumen layer, 3 cm screed, 1 cm flooring (wood or stoneware);
• roof slab: 1–1.5 cm lime-based plaster, 12.5 cm cast-in-situ reinforced concrete slab,
3.5 cm screed, bituminous sheath;
The fixtures are very similar to those envisaged in the project and consist of wooden
frames, painted white, with single glass.
Regarding the plants, it must be noted that this building, like many others built in
the 1950s, was not originally equipped with heating or cooling systems. The control of
the internal temperature was therefore obtained through natural ventilation. In the winter
season, the heating of the rooms was performed by a wood-burning fireplace in each single
house in the living area. Over the years, with the change in technology, product costs, and
lifestyles, each home has been equipped with a heating system. The individual owners
carried out the construction of the systems independently. For this reason, the components
of the systems (boiler, radiators) vary from apartment to apartment. The solution adopted
provides, in general, the installation of an autonomous internal boiler of about 24 kW in
the central masonry body. The boiler allows the production of domestic hot water and
the power supply of the terminals located in each room of the apartment. The terminals
are standard radiators. Given the differences between the apartments, a schematic was
adopted in the calculation phase, considering the system of a typical accommodation and
then applying it to the other apartments examined. Therefore, small differences (model or
commercial brand of the radiator, for example) were eliminated, given that they did not
affect the calculation results.
Appl. Sci. 2021, 11, x FOR PEER REVIEW 19 of 32
The fireplace is present in all apartments, but its function changes, e.g., in some cases,
it is not used. Its function is performed by the heating system (Figure 8). In other cases,
residents decided
residents decided totocontinue
continueto
touse
useititinincombination
combinationwith
withthe heating
the system,
heating maintaining
system, maintain-
the wood supply, and others replaced the wood-burning fireplace with a gas fireplace that
ing the wood supply, and others replaced the wood-burning fireplace with a gas fireplace
replaces the radiators in the living area.
that replaces the radiators in the living area.

Figure 8.
Figure 8. Pictures
Pictures of
of the
the flat with aa gas-fireplace
flat with gas-fireplace and
and aa wood-fireplace
wood-fireplace (above)
(above) and
and aa picture
picture of
of the
the external
external part
part of
of the
the
building with the analyzed part (below).
building with the analyzed part (below).

Figure 8 shows pictures of the flat with a gas-fireplace and a wood-fireplace and a
picture of the external part of the building with the analyzed part. The cooling systems
have never been installed because they are not necessary because the climate in London
in the summer is not very hot. Furthermore, it should also be considered that the building
Appl. Sci. 2021, 11, 2252 19 of 31

Figure 8 shows pictures of the flat with a gas-fireplace and a wood-fireplace and a
picture of the external part of the building with the analyzed part. The cooling systems
have never been installed because they are not necessary because the climate in London in
the summer is not very hot. Furthermore, it should also be considered that the building is
located in a well-ventilated area, far from the densely built urban center.
The present study examined a single block consisting of 6 apartments, distributed in
pairs, on three elevations, and served by a common staircase. The limitation to a single
block of apartments does not affect the search results. It respects the modularity desired
by Stirling and excludes the repetition of identical elements, superfluous for the purposes
of the calculation. The delimitation required the modification of the perimeter walls of
the housing: The walls that previously bordered other apartments, in solid bricks, were
transformed into cavity walls bordering the external environment, as is already the case for
the rest of the construction.
The modelling process was conducted on the basis of two-dimensional graphic refer-
ences (plans, sections, elevations) produced through the redesign of the project drawings
and the verification of the relative congruence (between plan and section, for example);
the modelling phase was conducted, as required by BIM, specifying the material and
construction characteristics of the individual elements and also the parameters useful for
the energy simulation. An accurate BIM model of the building, defined in its architectural-
construction aspects, was developed. From the model, it is possible to extract plans and
sections, or inspect the building in three-dimensional views.
To export the model from the Building Information Model (Figure 9) and to import it
into the Building Energy Model, it is necessary to create the thermal zones to which each
Appl. Sci. 2021, 11, x FOR PEER REVIEW
room is assigned. This operation, easy and immediate from an operational point of view,
requires particular attention from a conceptual point of view.

Figure
Figure 9. Navigable
9. Navigable virtual virtual model,
model, view of the view of the
main front. main front.
For the Stirling building, 7 thermal blocks were identified (Figure 10), one for each
of the 6For the Stirling
apartments, building,
and one 7 thermal
for the common areas.blocks were block
The thermal identified
referred(Figure
to an 10),
the 6 apartments,
apartment, andit one
contains within for thermal
as many the common
zones asareas. The
there are thermal
rooms block referr
that compose
it. Indeed, all the rooms are heated by the same system and therefore share the same
ment, contains within it as many thermal zones as there are rooms that comp
internal temperature. Furthermore, since this is a residence, the occupancy will also be
all the rooms
homogeneous are heated
throughout by the same system and therefore share the sam
the apartment.
perature. Furthermore, since this is a residence, the occupancy will also be
throughout the apartment.
For the Stirling building, 7 thermal blocks were identified (Figure 10), one for each of
the 6 apartments, and one for the common areas. The thermal block referred to an apart-
ment, contains within it as many thermal zones as there are rooms that compose it. Indeed,
Appl. Sci. 2021, 11, 2252 all the rooms are heated by the same system and therefore share the same internal tem-
20 of 31
perature. Furthermore, since this is a residence, the occupancy will also be homogeneous
throughout the apartment.

Figure 10. Graphic visualization of the Building Energy Model (BEM) model with chromatic dis-
Figure 10. Graphic visualization of the Building Energy Model (BEM) model with chromatic distinc-
tinction of the thermal blocks.
tion of the thermal blocks.

Commonareas
Common areasdo donotnothavehaveany
any type
type ofof heating
heating and
and havehave a different
a different occupancy
occupancy pro-
profile
file from that of the apartments. After verifying the correct definition
from that of the apartments. After verifying the correct definition of the Building Energy of the Building En-
ergy Model, it is possible to proceed to enrich its information
Model, it is possible to proceed to enrich its information content. The operations carried content. The operations car-
riedwithin
out out within
the three theEcoDesigner
three EcoDesignerSTAR tabs STAR
are: tabs
Thermal are: Blocks,
Thermal Blocks, Structures,
Structures, and Openings. and
Openings.
Within Within the
the thermal thermal
block block
section, it issection,
possibleit istopossible
modifyto themodify the operation
operation profiles ofprofiles
each
of each thermal
thermal block with block with related
related heatingheating and ventilation
and ventilation systems,systems, to determine,
to determine, duringduring
the
the calculation phase, the thermal inputs deriving from external
calculation phase, the thermal inputs deriving from external and internal factors. The and internal factors. The
analysis on the operation profiles was calibrated on the basis
analysis on the operation profiles was calibrated on the basis of a typical English family. of a typical English family.
Theschedules
The scheduleswere wereset setincluding
includingthe thedifferentiation
differentiationofofthe thetypes
typesofofuse
useover
overthe
thedifferent
different
seasonsand
seasons andworking
workingand andnon-working
non-workingdays. days. To Toidentify
identifythetheperiod
periodofofoperation
operationofofthe the
heatingsystem,
heating system,the thegraphs
graphson onthe
theclimatic
climaticdata datagenerated
generatedby bythe
thesoftware
softwarewerewereexamined.
examined.
ItItisisthus
thusdetermined
determinedthat thatthe theapartment
apartmentisisinhabited
inhabitedfor foraafewfewhours
hoursaaday dayduring
duringwork
work
and school days and that, consequently, systems, lights, and appliances will be active forfor
and school days and that, consequently, systems, lights, and appliances will be active a
ci. 2021, 11, x FOR PEER REVIEW 21 of 32
a few
few hours.
hours. On Onthe the
otherother
hand, hand, the occupation
the occupation during during non-working
non-working days isdays is different,
different, when
when
the the apartment
apartment is occupied
is occupied for mostfor most
of the of the
day, day, generating
generating a more intensive
a more intensive use of
use of systems,
lights,
systems, andlights,
appliances.
and appliances.
A deep study made A deep it study
possible to trace
made in detail
it possible the characteristics
to trace and technical data
in detail the characteristics and technical data
sheets of the elements
sheets of that composethat
the elements it (Figure
compose 11).it Similarly
(Figure 11). to Similarly
the operationto theprofiles
operationset-profiles setting,
ting, heating and
heatingventilation systems must
and ventilation systems be assigned to each thermal
must be assigned to each block.
thermal block.

Figure 11.ofSchedules
Figure 11. Schedules of the
the operation operation
profiles. Noteprofiles.
how theNote how the
occupation ofoccupation
the houses of the houses
changes changes
between working and school
between working and school days (left) and non-working days (right) within the period of the
days (left) and non-working days (right) within the period of the year in which the heating is activated.
year in which the heating is activated.

EcoDesigner STAR, as already specified above, does not provide for the insertion of
the heating system terminals (radiators); therefore, only the parameters relating to the
boiler (nominal power and flow and return temperatures) and the production of domestic
Appl. Sci. 2021, 11, 2252 Figure 11. Schedules of the operation profiles. Note how the occupation of the houses changes
21 of 31
between working and school days (left) and non-working days (right) within the period of the
year in which the heating is activated.

EcoDesigner STAR,
EcoDesigner STAR, as
as already
already specified
specified above,
above, does
does not
not provide
provide for
for the
the insertion
insertion of
of
the heating
the heating system
system terminals
terminals (radiators);
(radiators); therefore,
therefore, only
only the
the parameters
parameters relating
relating to
to the
the
boiler (nominal
boiler (nominal power
power and
and flow
flow and
and return
return temperatures)
temperatures) andand the
the production
production ofof domestic
domestic
hot water have been entered. Figure 12 shows the window in which the flow and return
hot water have been entered. Figure 12 shows the window in which the flow and
temperature of
temperature ofthe
theheating
heatingsystem
systemwater
water
is issetset
andand
thethe energy
energy source
source usedused to power
to power the
the boiler.
boiler.

Figure
Figure 12.
12. On
On the
the left,
left, the
the window
window in
in which
which the
the flow
flow and
and return
return temperature
temperature of
of the
the heating
heating system
system
water is set; on the left, the energy source used to power the boiler.
water is set; on the left, the energy source used to power the boiler.

The
The ventilation
ventilation ofof the
the apartments
apartments is natural. Therefore,
is natural. it was
Therefore, it was possible
possible to
to set
set parame-
param-
eters such as the number of air changes per hour (defined as ACH—Air
ters such as the number of air changes per hour (defined as ACH—Air Changes per Hour) Changes per
Hour) and the program for using the fixtures. The air exchange has been
and the program for using the fixtures. The air exchange has been set with a value of set with a value
of
0.50.5 ACH.
ACH. ForFor
thethe attribution
attribution of of
thisthis value,
value, thethe harsh
harsh climate
climate waswas considered.
considered.
The
The tab
tab called
called “Structures”
“Structures” cancan be
be used
used to
to insert
insert and
and calculate
calculate thermal
thermal bridges.
bridges.
The
The software manages
manages thethecalculation
calculationofofthethethermal
thermalbridge
bridgeinin
anan extremely
extremely intuitive
intuitive way:
way:
• With the Detail tool, it is possible to isolate the desired portion of the drawing in an
independent tab;
• the 2D drawing is graphically improved and the materials are attributed to the various
screens representing the construction elements;
• through a dedicated command, the calculation of the thermal bridge is started and
takes place in several phases: (i) In the first phase, the area relating to the external air is
selected with its temperature (already calculated based on climatic data, but possibly
editable); (ii) in the second phase, the same operation is carried out, this time for the
indoor air; (iii) we then move on to the identification of the foundation soil using a net
(if it is a matter of structures in direct contact with the ground, otherwise we move on
to the next phase); (iv) in the fourth phase, the thermo-physical characteristics of the
building materials are checked.
This calculation provides an interactive graph of the temperatures (or a graph of the
heat flow). The main thermal bridges identified in the analyzed case study concern the
combination of bricks and concrete beams/panels of reinforced concrete, and the material
discontinuities at the windows and the corners of the structure. The window fixtures
required a detailed study for each frame. Each window was decomposed optimally to not
distort the performance of the building envelope. In order to conduct this analysis, the
factors considered are: The juxtaposition between the concrete panel and the masonry wall,
the particular shaped frame and its contact with the bricks and concrete, and the angle of
the structure, which is identified as a thermal bridge in shape. Normally, these aspects
should be taken into account separately, but their positioning within a very small area does
combination of bricks and concrete beams/panels of reinforced concrete, and the material
discontinuities at the windows and the corners of the structure. The window fixtures re-
quired a detailed study for each frame. Each window was decomposed optimally to not
distort the performance of the building envelope. In order to conduct this analysis, the
factors considered are: The juxtaposition between the concrete panel and the masonry
Appl. Sci. 2021, 11, 2252 22 of 31
wall, the particular shaped frame and its contact with the bricks and concrete, and the
angle of the structure, which is identified as a thermal bridge in shape. Normally, these
aspects should be taken into account separately, but their positioning within a very small
area
not doesthis
allow notprocedure.
allow this procedure.
In doing so, Inthermal
doing so, thermal
bridges bridges
would would be calculated
be calculated two or more two
or more
times, times,
in the in the to
elements elements
which theyto which
belongthey
andbelong
in theand in the ones.
adjacent adjacent ones. Itdistort
It should should
distort
the the performance
performance of the building
of the building envelope,envelope, whichbe
which would would
worsebethan worse theythan theyare.
really really
It
are.therefore,
was, It was, therefore,
decided to decided
break downto break
anddown and schematize
schematize these factors. these factors.
In this way,Inthey
thiswere
way,
considered
they were independent, and a correctand
considered independent, calculation
a correct was obtained.
calculation was obtained.
The
Thefirst
firstthermal
thermalbridgebridgecalculated
calculatedwas wasthat
thatbetween
betweenthe thereinforced
reinforcedconcrete
concretepanelpanel
under
underthethewindow
windowand andthetheadjacent
adjacentmasonry.
masonry.InInthisthiscase,
case,thethethermal
thermalbridge
bridgeofofthe theshape
shape
deriving
derivingfromfromthe the angle
angle formed by the the structure
structure(the(thewall
walltotothe theright
right ofofthethe panel)
panel) is
is cal-
calculated simultaneously.The
culated simultaneously. Thethermal
thermal bridge
bridge was divided into into two
twoparts:
parts:OneOnebetween
between
window
windowand andbrick
brickandandoneonebetween
betweenwindow
windowand andconcrete.
concrete.The Theresulting
resultingthermal
thermalbridge
bridge
value
value has attributed a length equal to the perimeter of the window in contact withthe
has attributed a length equal to the perimeter of the window in contact with the
bricks,
bricks,excluding
excludingthat thatpart
partinincontact
contactwith
withthe
thewall
wallininthe
theright
rightcorner.
corner.ItItwaswasbecause
becausethe the
effect
effectofofthis
thisthermal
thermalbridge
bridgewas wascalculated
calculatedininthethecase
caseofofthe
theprevious
previousstep. step.
The
Thethermal
thermalbridge
bridge ofof
thethe
window
window was calculated
was calculated in contact
in contact with the the
with concrete, consid-
concrete, con-
ering a vertical section of the frame (Figures 13 and 14). The length to
sidering a vertical section of the frame (Figures 13 and 14). The length to be attributed to be attributed to the
thermal bridge
the thermal is therefore
bridge the perimeter
is therefore of theofframe
the perimeter in contact
the frame with the
in contact withconcrete.
the concrete.

Appl. Sci. 2021, 11, x FOR PEER REVIEW


Figure 13. Output of the calculation of the thermal bridge of the window inside a fictitious23wall
of 32
Figure 13. Output of the calculation of the thermal bridge of the window inside a fictitious wall (left)
(left) and dimensions considered for the length to be attributed to the thermal bridge (right).
and dimensions considered for the length to be attributed to the thermal bridge (right).

Figure
Figure14.
14.Output
Outputof
ofthe
thecalculation
calculation of
of the
the thermal bridge of
thermal bridge of the
the window
windowin incontact
contactwith
withthe
theconcrete
con-
crete (left) and dimensions considered for the length to be attributed to the thermal bridge
(left) and dimensions considered for the length to be attributed to the thermal bridge (right). (right).

In
Inthis
thiscalculation,
calculation,the
thefloor
floorin
in contact
contactwith
withthe
the beam
beam was
was also
also included
included because
becauseitit
gave rise to another thermal bridge. By calculating the thermal bridge of the concrete
gave rise to another thermal bridge. By calculating the thermal bridge of the concrete beam
in contact
beam with the
in contact floor,
with thethe lengths
floor, already
the lengths taken into
already takenconsideration for thefor
into consideration frames were
the frames
excluded. Once all thermal bridges were calculated, they were attributed to each thermal
block via the structures table. Alternatively, it is also possible to enter a table value of the
thermal bridge, but the specific calculation for each element is always to be preferred. In
this last sheet, the characteristics of the frame are specified. They can be selected from a
vast library inside the plug-in, divided into glass type and frame material. The alternatives
In this calculation, the floor in contact with the beam was also included because
gave rise to another thermal bridge. By calculating the thermal bridge of the concrete bea
in contact with the floor, the lengths already taken into consideration for the frames we
Appl. Sci. 2021, 11, 2252
excluded. Once all thermal bridges were calculated, they were attributed to23each of 31
therm
block via the structures table. Alternatively, it is also possible to enter a table value of t
thermal bridge, but the specific calculation for each element is always to be preferred.
were excluded. Once all thermal bridges were calculated, they were attributed to each
this last sheet, the characteristics of the frame are specified. They can be selected from
thermal block via the structures table. Alternatively, it is also possible to enter a table
vast library
value ofinside the plug-in,
the thermal bridge, butdivided into calculation
the specific glass typefor and frame
each material.
element The
is always to alternativ
be
madepreferred.
availableInbythis thelast
library
sheet, are
the numerous
characteristics and canframe
of the satisfy areeven the cases
specified. They of
canfixtures
be wi
particular performances. However, if the characteristics to be entered do not correspon
selected from a vast library inside the plug-in, divided into glass type and frame material.
The present
to those alternatives
in made availableitbyisthe
the library, library possible
always are numerous and can satisfy
to manually even the them
overwrite cases for ea
of fixtures with particular performances. However, if the characteristics to be entered do
framenotor correspond
groups oftoframes. It is also necessary to start the calculation of the solar analy
those present in the library, it is always possible to manually overwrite
(Figure 15)for
them for all frame
each external frames
or groups (all internal
of frames. doors
It is also necessarywilltobestart
automatically
the calculationexcluded).
of the Th
operation has a double
solar analysis (Figure advantage. The frames
15) for all external first is(all
that the data
internal doorsobtained can be used by t
will be automatically
excluded). This operation has a double advantage. The first
program in the calculation phase, while the second is that the professional receives is that the data obtained can su
be used by the program in the calculation phase, while the second is that the professional
port, during the design, from the interactive graph produced as a result of the calculatio
receives support, during the design, from the interactive graph produced as a result of
This graph offers the
the calculation. Thispossibility
graph offersto investigate,
the possibility today-by-day, hour-by-hour,
investigate, day-by-day, the irradiati
hour-by-hour,
conditions of a given
the irradiation frame.of
conditions So, it is possible
a given frame. So, to itinstantly
is possibleevaluate theevaluate
to instantly effectiveness
the of t
effectiveness
positioning, of the positioning,
dimensions, dimensions,
or shielding system or shielding
adoptedsystem (Figure adopted
16). (Figure 16).

Figure 15. Three-dimensional


Figure display
15. Three-dimensional of of
display thetheselected window
selected window element
element andand relative
relative solar analysis.
solar analysis.

Before proceeding with the energy simulation of the building, it is possible to select
a “Reference building” in the calculation phase. This building is another virtual model
that serves as a benchmark. Thanks to it, the advantages and disadvantages of the two
alternatives of the same project can be immediately highlighted. Moreover, it is possible
to compare the building under consideration with a similar one whose performance we
already know. This is a completely optional operation. The simulation can very well
proceed with the building data without any reference building.
However, in this case, it was decided to build a reference building model both for com-
pleteness in the study of the possibilities of this software, and to highlight considerations
on the design applications extensively presented in the next paragraph. The construction
of the reference building was based on the same geometric-architectural model of the
case study building. The elements and climatic data used are completely identical; while
thermo-physical properties of the elements are different.
Appl. Sci. 2021, 11, 2252 24 of 31
Appl. Sci. 2021, 11, x FOR PEER REVIEW 24 of 32

Figure 16.
Figure 16. Window
Window for
for selecting
selecting openings/frames
openings/frames on
on the
the left,
left, library
library of
of the
the glass
glass type
type and
and frame
frame material
material on
on the
the right.
right.

Before proceeding
In particular, with the energy
the calibration of the simulation of the building,
building envelope was based it ison
possible to select
the guidelines
adictated
“Reference building” in the calculation phase. This building
by the “Interministerial Decree of 26 June 2015—A” and by the “Interministerial is another virtual model
that
Decreeserves
of 26as a benchmark.
June 2015—B” [46]. Thanks to it, the adopted
The procedure advantages and disadvantages
is purely for study purposes, of theastwo
the
alternatives
building wasofnot thedesigned
same project
in Italy can
norbeisimmediately highlighted.
it subject to Italian Moreover,
regulations. it is possible
The parameters are
to compare
classified building according
in the standard under consideration
to the climatic with a similar
zones of theone whose
locality. performance
Italy we
is divided into
already
6 climaticknow.
zonesThis is a completely
ranging from zone Aoptionalto zone operation.
F [47]. They The simulation
differ in the valuecan of very well days
degree pro-
ceed
(GG).withThe the building data
“degree-day” withoutasany
is defined thereference
sum, over building.
one year, of the (positive) difference
However,
between in thisambient
the internal case, ittemperature
was decidedand to the
build a reference
average buildingtemperature
daily external model both[48]. for
completeness in the studyinofItaly
The indoor temperature the possibilities
has been setof 20 ◦software,
atthis C, so the anddegreeto highlight considera-
days are calculated
basedon
tions onthethisdesign
temperature. It is evident
applications that the
extensively Stirling in
presented building
the next cannot be placed
paragraph. Theincon-
the
Italian climatic
struction zones, therefore
of the reference building thewasproblem
based on arises
the of
samewhich climatic zone to choose
geometric-architectural modelto
obtain
of the parameters
the case study building. of the
Thereference
elementsbuilding.
and climaticIt was
datadecided
used are to completely
calculate the degree
identical;
days near
while London (Ham
thermo-physical Common,
properties of Richmond,
the elementsBC, areUSA). In doing so, also the fictitious
different.
climatic zone according
In particular, to Italian parameters
the calibration of the building was found.
envelope Although
was based in England the degree
on the guidelines
days (HDD
dictated by theand“Interministerial
CDD, respectively, DecreeHeating Degree
of 26 June Day and
2015—A” and Cooling
by the Degree Day) are
“Interministerial
used, they
Decree of 26 areJune
calculated
2015—B” differently
[46]. The than the Italian
procedure ones, and
adopted in particular,
is purely for study they refer to an
purposes, as
internal temperature of 15.5 ◦ C instead of 20 ◦ C. Comparing the GG calculated with two
the building was not designed in Italy nor is it subject to Italian regulations. The parame-
different
ters temperatures
are classified in theis standard
an operation that distorts
according to thethe resultszones
climatic at theof start,
the itlocality.
was necessary
Italy is
divided into 6 climatic zones ranging from zone A to zone F [47]. They differ the
to calculate them through an online application [49]. It was used to choose internal
in the value
temperature
of degree days to (GG).
be included in the calculation.
The “degree-day” is definedThe asoutput of this
the sum, overprocess
one year,is a spreadsheet
of the (posi-
in which
tive) the following
difference betweenare theentered:
internalThe periodtemperature
ambient of time considered
and theand temperature
average of the
daily external
reference indoor
temperature [48].environments, source, accuracy
The indoor temperature in Italyofhas
thebeen
climatic
set atdata
20 °C,forsothat
thearea, weather
degree days
station used, a table with monthly degree day values, and finally
are calculated based on this temperature. It is evident that the Stirling building cannot be the total. A value of
3063 GG was considered. It was compared with the parameter
placed in the Italian climatic zones, therefore the problem arises of which climatic zone to suggested by the Italian
standard.
choose So, thethe
to obtain Stirling building
parameters ofwas ideally placed
the reference in theIt“climate
building. was decided zone to F”.calculate
It indicates
the
Appl. Sci. 2021, 11, 2252 25 of 31

the period of heating system operation and it allows identifying the parameters that the
building envelope must have to be considered as a reference building. EcoDesigner STAR
can overwrite the new parameters on the old, as a finished element, to quickly update the
Building Energy Model in a few steps. This avoids replacing the elements built previously
(walls, floors, windows, etc.) and having to model the building again. The resulting
building is better performing than the real building. It is because the building envelope
is made up of elements with high thermal efficiency. After starting the energy simulation
calculation, it is possible to save the building as a reference building. Finally, it can be used
as a term of comparison when analyzing the building with real parameters.

6.2. Simulation Results


All the aspects studied and exposed were useful for the correct construction of the BEM
model and a valid setting of the data for energy simulation. The previously built reference
building was included in the appropriate tool section. At the end of the calculation, a final
report was obtained.
The first section reports all the general data of the entire building, including geometric
ones, and some average values for all the thermal zones. The data concerning the energy
supplied to the building (heating system, lighting systems, internal heat inputs due to the
presence of people, etc.) are shown in the form of a weekly chart. It provides an immediate
understanding of which system requires the most energy. Therefore, it predicts which of
these fields can be the most expensive in economic terms. The first section contributes to
giving an overall view of the analyzed construction. The second section contains the same
information as the first, but this time concerning the individual thermal blocks. Each block
is associated with a weekly graph of the energy supplied and a graph on the energy emitted.
In the specific case of the Stirling building, the 6 apartments are shown (each definitive
with a thermal block) and a single common area (represented with a single thermal block).
It was noted that the apartments that require less energy in a year are those on the first floor.
It is because they exchange heat with the external environment only on three sides. On the
fourth side, the apartments border an unheated internal environment. Both at floor and
ceiling level they border with other heated rooms. Therefore, the heat losses are less. The
accommodations that require more energy to maintain an optimal internal temperature
are those on the top floor. Indeed, they exchange heat with the external environment even
from the ceiling. Moreover, the roof slab, compared to the floor slabs, has a lower thickness
and there is not any type of insulating layer. The apartments on the ground floor, on the
other hand, have energy consumption closer to those on the first floor. Another aspect
that can be immediately noticed is that the apartments on the right of the entrance (and
therefore facing north) have slightly higher energy consumption than those facing south.
The third section relates to the daily temperature profiles. It is possible to insert graphs
for each day of the year of any thermal block, to show the curves of internal and external
temperatures. During the design phase, these graphs are very useful to better calibrate the
systems and know when it is necessary to heat or cool the rooms. The fourth section is
dedicated to the energy consumption, environmental impact, and energy production (if
renewable energy sources are present). Energy consumption is shown both as a table and
as a graph, and is divided into categories (heating, cooling, domestic hot water production,
consumption due to mechanical ventilation if present, lighting, and equipment). If the
prices of the various energy sources are also set, the cost of the various systems can be
known. The environmental impact is instead calculated through the kg/y of CO2 emitted,
or the carbon dioxide expressed in kg emitted in a year.
The last section focuses on comparing the consumption of the building to be analyzed
and a reference building. It is possible, through this section, to compare two variants of
the same project, in order to know both the consumption of the two buildings. They are
compared in economic terms.
In Table 2, the results of the simulation were reported.
Appl. Sci. 2021, 11, 2252 26 of 31

Table 2. Geometric characteristic of the analyzed apartment and simulation result ante and post ideal retrofit action.

Ground Floor 1st Floor 2nd Floor


Gross Floor Area [m2 ] 67.68 67.67 67.7
Treated Floor area [m2 ] 56.3 56.3 56.3
Geometry Data
Building shell area [m2 ] 78.09 75.74 132.41
Ventilated Volume [m3 ] 135.41 135.41 135.41
Glazing ration [%] 16 16 9
ante 2.18–2.18 - -
Floors [W/m2 K] post - - -
Heat Transfer ante 1.04–3.74 1.04–3.74 1.04–3.74
Coefficients External [W/m2 K] post 0.43–3.74 0.43–3.74 0.43–3.74
ante 2.35–5.70 2.35–5.70 2.35–5.70
Openings [W/m2 K] post 1.81–2.48 1.81–2.48 1.81–2.48
ante 6.59 6.3 4.52
Min (06:00, 29) [◦ C] post 6.07 6.61 5.96
ante 14.3 15.32 15.57
Internal Temperature Annual Mean [◦ C] post 14.33 14.62 14.37
Max (19:00 05 August) [◦ C] ante 20.36 21.83 27.99
post 18.6 18.65 18.91

Heating [hrs/a] ante 127 126 124


Unmet Load Hours post 128 126 128

Annual Supplies Heating [kWh] ante 16,249.43 14,766.44 22,253.95


post 12,243.32 11,741.08 13,873.37

Heating (19:00 14 December) [kW] ante 10.22 10.05 15.03


Peak Loads post 9.11 10.27 10.06

The proposed interventions are to be considered the hypothesis that complete and
conclude the entire process outlined above. It has to be remembered that the aim of this
paper is not the design of improvement solutions for the James Stirling building, but the
definition of a methodology that integrates the simulation energy in the BIM environment,
thus identifying a valid design support tool. Anyway, some possible interventions aimed
at reducing the consumption of individual apartments and improving the performance of
the entire building are listed below:
• Addition of an insulating layer in the roof slab; the second and last level are those
affected by greater heat losses; this occurs at the roof level, as can be seen from the
thermography; thus acting on the attic, inserting an insulating layer that does not alter
the aesthetic and structural components of the building, the consumption and costs
for heating these apartments would be reduced;
• of the ground floor slab in contact with the ground; the consumption of the ground
floor apartment, compared with the consumption of the apartment on the first level,
is higher; it is hypothesized that improving the contact between the ground and the
attic through the insertion of a crawl space, consumption can be reduced and made
similar to that of the apartment on the first level;
• strengthening of the insulation package of the external cavity walls; currently the walls
have an air gap and by blowing in insulating material their thermal transmittance
values could be improved, thus reducing heat loss;
• replacement of fixtures; for this intervention two solutions could be opted for: (i) The
first involves the complete replacement of the current fixtures with fixtures, similar in
materials, but with double glass and thermal break; (ii) the second, if the first cannot be
carried out due to the protected nature of the building, provides for the maintenance
of the current wooden frames and for the replacement of the single glass with a double
glass, capable of guaranteeing an improvement in the performance of the fixture.
By updating the BIM model with the new parameters, the BEM model will also be
updated automatically. So, the energy simulation calculation can be quickly started.
The consumption of the apartment at the ground floor after the application of the
retrofit actions is 12,243.32 kWh; while before the ideal retrofit actions was 16,349.43 kWh.
Appl. Sci. 2021, 11, 2252 27 of 31

The apartment on the first floor adjoins two heated rooms, both at floor and ceiling
level, with an annual consumption of 14,766.44 kWh, before the ideal retrofit actions, and
of 11,741.08 kWh, after the ideal retrofit actions.
The consumption of this apartment is slightly lower than the ground floor apartment
and significantly lowers. The apartment on the second level borders on a heated room at
floor level and with the external environment at ceiling level. The annual consumption
calculated was 22,539.95 kWh before the ideal retrofit actions, and 13,873.37 kWh after the
ideal retrofit actions. Furthermore, it is possible to obtain the perspective sections of the
apartments in which it is also possible to read the distribution of temperatures within the
building envelope; this type of paper, following a correct interpretation, is particularly
useful for identifying the areas of intervention.
Looking at the thermography of the new configuration of the building, it can be seen
how the roof slab disperses less heat than the real configuration and how the windows and
cavity walls break down the heat flow.

7. Results
In the previous section, the results of the process were reported. By conducting this
study, it was possible to highlight the advantages and limitations of the tool EcoDesigner
STAR application and to outline a clear picture of the potential and criticality of the
chosen. The greatest advantage that is obtained from the use of ArchiCAD associated with
EcoDesigner STAR is the overcoming of one of the major problems in this field, namely
the transition from BIM to BEM. The modelling software allows the construction of a BIM
model according to certified tools. Plug-in allows its interpretation in BEM with an almost
instantaneous operation.
It is clear that this transition from BIM to BEM is error-free. Moreover, it is configured
as an immediate operation when the designer builds the BIM to then conduct an energy
analysis. Indeed, during the design and modelling process, it is necessary to better calibrate
the data entered in the BIM, the used elements and the relationships established with
other elements. It is also useful to facilitate the subsequent transformation of the Building
Information Model Building Energy Model. It has to be reminded that, according to the
BIM goals, the interoperability must take place from the earliest stages of design. To do this,
all the professional figures required should be involved to operate with the same objectives
and making the work faster and more effective.
If the BIM model is built to transform it into BEM, the operation is easy. In this way, it
is possible to apply an energy simulation in all the design phases of a building. Clearly,
this action occurs with degrees of detail and accuracy based on the progress of the project.
So, better integration between design and energy analysis can be achieved. This latter is
not relegating to the final phases of the project. As for typical energy analysis, at the end
of the simulation process, many data can be obtained (both directly and indirectly). From
them, it is possible to consider possible interventions aimed at reducing the consumption
of apartments.
Another advantage of this tool is the feasibility to compare two or more variants of
one of the same building. They can be compared both in the early stages of the project and
in the final stages, managing to choose the best solution according to needs.
The output data looks user-friendly. It is an important aspect for the designer, who
can know the advantages and disadvantages of a design choice almost immediately. For
example, it is possible to choose the orientation and materials of the building envelope and
start an initial energy simulation by mentioning the other fundamental data. Furthermore,
it is possible to propose a different orientation and different types of materials for the
building envelope, keeping the other data completely identical to the previous variant.
Finally, it proceeds with the simulation of a second alternative and automatically compares
it with the first, in order to obtain graphs on the savings and consumption of both and
choose the most suitable solution. In order to support this consideration and to check
the possible improvements of the tool, further comparison with a stand-alone software
notis relegating
example, theitsame to the final
istoadvantage
possible antoThe phases
choose of
the the project.
orientation As andfor typical
materials energy analysis, atenvelope
the end
it
one Another
possible
of apply
building.
can know
of
energy
They this can
output
the
tool
simulation
be is the
compared
data
advantages
feasibility
looks and both to
in alluser-friendly.
the in compare
design
the early
disadvantages It of
phases istwothe
stages
an
of
abuilding
or more
of important
building.
of
a design
variants
thechoice Clearly,
project
aspect andof
for the
almost desi
immed
of
and
this
one the
of simulation
start
action
the ansameinitial
occurs process,
energy
with
building.
in the final stages, managing many
simulation
degrees
They to of
can data
choosedetail
be can
by be
compared
the obtained
mentioning
and accuracy
best both
solution (both
the
based
in the directly
otheron fundamental
early
according the and
progress
stages
to indirectly).
of
needs. data.
of
the the From
Further-
project.
project and
can know the advantages and disadvantages
example, it is possible to choose the orientation and materials of the building of a design choice almost immed
them,
more,
So, it is
better possible
isoutput
possible
integration to
to consider
propose
between possible
ais different interventions
orientation aimed
and at reducing
different types the
of consumption
materials for
in the final
The stages, managing
data looks
example,
and itdesign
to
an
choose
startuser-friendly.
and
possible
initial
the
energy Itenergy
best
toischoose
an analysis
solution
important
simulation the by
can
according be achieved.
aspect
orientation
mentioning
to
forneeds.
andthe This latter
designer,
materials
the ofwho is building
the
other fundamental dat
of
the
not apartments.
building
can relegating
The output
know envelope,
to data
theand
the advantages keeping
final
looks phases
and the
user-friendly. other
of theenergy
disadvantages data
project.
It isof completely
anAs identical
for typical
a important
design choice energy
aspect to
almost the previous
foranalysis,
the variant.
at the
designer,
immediately. end
who
For
more, startit isanpossible
initial to propose simulation by
a different mentioning
orientation the
andother fundamental
different types ofdat ma
Finally,Another
it ittheis advantage
proceeds with of the this tool theiscan theof feasibility to compare two or more variants of31
Appl. Sci. 2021, 11, 2252 of
can the
example, simulation
know process,
advantages
possiblethe to
more, many
andissimulation
choose
it
building
data
disadvantages
possible
envelope, to be
orientation aobtained
propose
keeping
second
of aanddesign
athe alternative
(both directly
choice
materials
different
other data ofand
almost and
the
orientation automatically
indirectly).
immediately.
building
completely andidentical
differentcom-
From
28For
envelope oftypes
to of ma
the previo
one
and of
pares
them,
example, itthe
start itsame
with
isan the
possible
is
initialbuilding.
first,
to
possible into They
order
consider
energy choose can
possible
simulation beby
toenvelope,
obtain
the compared
graphs
interventions
orientation
mentioning both
onand thein the
savings
aimed
the early
materials
other at ofstages
and
reducing of
thethe
consumption
the building project and
of both
consumption
envelope
the building
Finally, it proceeds withkeeping the
the simulation other offundamental
data a completely data. Further-
identical
second alternative to the
and previo
automati
in
of
and the final
choose
apartments.
start an stages,
the most
initial
more, it is possible to managing
suitable
energypropose to
simulation
a choose
solution.
different by the
In best
order
mentioning
orientationsolution
to support
the
and according
this
other to
fundamental
different needs.
consideration
types of and
data. to check
Further-
materials for
Finally, it proceeds with the simulation of
pares it with the first, in order to obtain graphs on the savings and consumpti a second alternative and automati
the The
it isoutput
possible
Another data
improvements
advantage looks user-friendly.
of athe
ofit this tool tool,
is the Itfeasibility
further iscompletely
ancomparison
important aspect
withtwo a for orthe ofdesigner,
stand-alone who
software
more,
the building possible
envelope, to propose
pares
and keeping
choose with thedifferent
thethe other
mostfirst, orientation
data
in order
suitable to to
andcompare
obtain
solution.
different
identical
ordertotoon
In graphs
types
the more
previous
the
support
variants
materials andfor
thisvariant.
savings ofconsumpti
consideration an
was
can
was
one performed.
know
performed.
of the the The
advantages
The main
main results
and
results are are
disadvantages reported
reported of
inina Table
design
Table 3.3. Regarding
choice
Regarding almost the
the building
immediately.
building systems,
For
systems,
the
Finally, it same
building proceeds building.
envelope, with
and
the
They
keeping
the
choose the
possible
can
the
simulation be
othercompared
data
of a both
completely
second
most suitableofsolution.
improvements the
in the early
identical
alternative
tool, Infurther stages
to
and
order to the of the
previous project
automatically
support this
comparison
and
variant.
com-
consideration
with a stand-alonan
“basic”
example, itmeans
itproceeds
isthe thatmanaging
possible there are just aathe
few options to set the plants; “detailed” means that ititis
“basic”
in
paresthe it
Finally, means
final
with stages,that
first,
the
was into
there
with choose
are
the
order
possible just
to
performed.
choose
simulation
to few
obtain orientation
improvements
The
options
theofbest
graphs
main
to
on
of
and
results
set
solution
a second the
the
materials
the plants;
according
alternative
savings
tool,
are
of
and
further
reported
and
in
the building
“detailed”
tocomparison
needs. means
automatically
consumption
Table 3.
envelope
ofthat
with
Regarding
com-
both
a the
stand-alon
buildin
ispossible
and start
possible
pares it withtotoinitial
an set all
setmost
the allthe
energy
the
first, parameters.
in simulation
parameters.
order to obtain by mentioning
graphs anon thesavings
the other fundamental
and consumptiondata. Further-
and The
choose output
the data waslooks
suitable
“basic”
user-friendly.
solution.
performed.
means The
that In It isresults
order
main
there
important
aretojust
support
are
a few
aspect
this
reported infor
consideration
options
the 3.
toTable
set the and toofcheck
designer,
Regarding
plants;
both
who the buildin
“detailed” me
more,
can
and it
know
chooseis possible
the
the
the possible improvements most to
advantages propose
suitable andof a different
disadvantages
solution.
the tool, In orientation
order
further oftoa design
support
comparisonand different
choice
this
with almosttypes
consideration
a of materials
immediately.
stand-alone and to for
For
check
software
“basic”
is possible
Comparison
Table3.3.Comparison means that
to Termolog
with set there
all thesoftware.
Termolog are just
parameters.
software. a few options to set the plants; “detailed” me
the Table with
wasbuilding
example,
possible it isenvelope,
performed. possible
improvements
Theismain keeping
to choose
possible of
results theare
to set
other
the
tool, data
orientation
further
reported
all the
completely
incomparison
Table
parameters.
identical
and materials with
3. Regarding of ato
thethebuilding
previousenvelope
stand-alone
the building variant.
software
systems,
Finally,
and start itan proceeds
initial with
energy the simulation
simulation of a second
byoptions
mentioning setthealternative andthe automatically com-
was
“basic”performed.
means The
that mainare
there results
just
Table are
a3.few reported
Comparison intoTable
ArchiCAD
with the+other
3.ArchiCAD fundamental
Regarding
plants;
EcoDesigner
Termolog +“detailed”
software. STAR data.
building
means Further-
systems,
Termolog
Termolog that it
pares it with the first, in order to obtain graphs on EcoDesigner
the savings STAR
and consumption of both
“basic”
more, it means
is possible is possible
to set that there
all to
the are
propose
parameters.
Density [ρ] just
a
Table a few
different
3. options
Comparisonorientation to set
with the
and plants;
Termologdifferent
✓ “detailed”
software.types of means
materials
✓ thatfor it
and chooseto
is possible
the building the most
setThermal
all the
envelope, suitable Density
parameters.
keeping the [ρ]
solution. other In order
data to support
completely X consideration
this
identical ArchiCAD
to the +and
previous Xto
EcoDesigner
check
variant. STAR T
conductivity
Thermal conductivity [λ] [λ] ✓X X ✓
the possible improvements of theTermolog
tool, Density
further [ρ]
comparison ArchiCAD + EcoDesigner
✓ STAR T
Finally, itTable
proceeds
Vapour 3.Vapour with
Comparison
diffusion the simulation
with
resistance
diffusion resistance factor ofsoftware.

factor a second
][µ] ✕withand
alternative a stand-alone
automatically Xsoftware
✓ com-
Material
Material physicalproperties
physical properties
was Thermal Density [ρ]
conductivity [λ] ✓
paresperformed.Tablethe
it with 3.The
first,main
Comparison
Heat results
Heat
in order with
Capacity are
toTermolog
Capacity obtainreported in on
software.
graphs Table the3.savings
Regarding
✓X and the buildingXsystems,
consumption of both

“basic” means that there Embodied
are Vapour
just energy
a Thermal
few diffusion
options ArchiCAD
conductivity
resistance
to set the+ EcoDesigner
[λ]
factor X[µ ] “detailed”
plants; STAR Termolog
means✓
✕ that it
and choose
Material physicalthe most suitableenergy
Embodied
properties solution. In order to support
ArchiCAD ✓
this consideration
+ EcoDesigner
and
STAR Termolog
to✕ check
Density
Embodied [ρ]
Vapourcarbon diffusion resistance factor
Heat Capacity ✓X[µ ] ✓✓

is
thepossible
Material possible
physical toimprovements
set allEmbodied
properties the parameters.
of the
carbon tool, further comparison ✓with a stand-alone software ✕
Thermal Density [ρ] Nominal
conductivity [λ] Embodied
Heat
capacity Capacity
energy X—basic— ✓ ✓✓
X—detailed
was performed. The main results are
Nominal reported
capacity [η] in energy
Table 3. ✓—basic—
Regarding
✓ the building ✓—detailed
systems,
Vapour
Table 3.
Thermal
diffusion
Comparison
conductivity
resistance
with
[λ]
factor
Efficiency
Termolog [µ
Embodied ]
software. carbon ✕ X ✓✓
—detailed
Material physical properties “basic” means that Boiler
there are Efficiency
just a few[η] options to set the ✕
plants;
✕ “detailed” ✓—detailed
meansX ✓that it
Vapour Boilerdiffusion resistanceEmission
Heat Capacity factor [µsystem
Embodied ] Nominal carbon capacity ✓ ✓
✓—basic— ✓
Material physical properties is possible to set allEmbodied the Emission
parameters. system
Thermoregulation X ✕
—basic X ✓
—detailed
heating and cooling Heat Capacity
energy Efficiency [η] ArchiCAD
Nominal capacity ✓
+ EcoDesigner ✓ STAR✓—basic— ✕✓ ✕
Termolog ✓
heating and cooling Thermoregulation ✓—basic ✓—detailed
Building Systems Embodied [ρ] Boiler
Densityenergy
carbon Nominal capacity
Efficiency
Emission
X—basic
[η]
system ✓ X—detailed
✕ ✕
✓ ✓
Table 3. Comparison Nominal
with BoilerEfficiency
capacity
Termolog software. ✓—basic ✓—detailed
andEmbodied
heatingThermal
AC carbon
unitconductivity
coolingNominal [λ]
capacity Emission system
[COP/EER]Thermoregulation
X—basic

✓—basic— ✓—basic✕
X—detailed
✕✓
✓—detailed ✓
Building Systems AC unit Efficiency
Nominal [COP/EER]
capacity ✓—basic
✓—basic—
✕ ✓—detailed
✓—detailed
X ✓
Vapour
heating diffusion
and cooling resistance
Efficiency factor
[η] [µsystem
Emission ] Thermoregulation
Nominal
ArchiCAD capacity
+ EcoDesigner STAR ✓—basic
Termolog ✓
Material physical properties Boiler Emission system
Thermoregulation ✕
X—basic ✓
X—detailed
Building Systems Heat
Density Efficiency
Capacity
Emission
[ρ] AC [η]
system
unit Nominal
Efficiency capacity
[COP/EER] ✕

✓ ✓—detailed
✓—basic✓
✓ ✓
Boiler Thermoregulation Power ✓—basic ✓—detailed
heating
BuildingandSystems
cooling Embodied
Thermal Emission
energy
conductivity AC system
Thermoregulationunit
[λ] Efficiency
Emission [COP/EER]
system ✕
X

✓—basic

X ✕
✕ ✓
✓—detailed
✓—basic✓ ✓
lighting PowerSources typologies X
✓ X ✓
heating and cooling Vapour Embodied
diffusion Thermoregulation
carbon
Nominal
resistance capacity
factor
Control [µ ]
system Emission system
Thermoregulation✓—basic

✕ ✓—detailed
X ✕

✓—basic✓ ✓
Material lighting
physical properties Sources typologies ✓
✓—basic ✓
Building Systems AC unit Heat Nominal
Efficiency
Capacity capacity
[COP/EER] ✓—basic—
Thermoregulation
Power ✓ ✓—detailed
✓—basic
✓ ✓ ✓
Control system ✕
✓—basic
✕ ✓
Building Systems AClighting
unitEmbodied
Efficiency
Emission
energy[COP/EER]
Efficiency [η]
system SourcesPower
typologies ✓ ✓—detailed
✓ ✓

8. Discussion Boiler
lighting
Embodied Emission
carbonsystem
Thermoregulation Sources
Controltypologies
system ✕
✓—basic
✓ ✓✓
✓—detailed
✕ ✕
heating and 8. Discussion
coolingThe main goals of Thermoregulation
this study
Nominal Power are the analysis
capacity Control of the interaction between
✓—basic
system ✓
✓—basic— ✕BIM
✓ and
✓—detailed
✓—detailed
lightingenergyThe simulation,
main goals8.through
ofDiscussion
this aPower
study
Nominal
Sources review
are[η]of the
the
capacity
typologies
Efficiency
mainof
analysis existing commercial
the ✓—basic✓
interaction

tools, BIM
between and and
the
✓ iden-
✓—detailed
✓—detaileden-
Building Systems lighting tification
ergy Boiler
and
AC
simulation, application
unit
through of
Sources
Efficiency
a a
review
Control methodology
typologies
[COP/EER]
of
systemthe main in a BIM
existing environment

✓—basic

commercial by using
tools, and Graphisoft’s
the ✓
✓—detailed
identi-
8. Discussion
Emission system are the✕ ✓
BIM software Archicad The
heating and fication
cooling and application
and main
the
Control
Emission
of a
goals of this
plug-in
systemfor in
system
methodology
Thermoregulation a
studyenergy
dynamic
BIM environment
✓—basic
analysis ofEcoDesigner
simulation
✕ by
the interaction
using Graphisoft’s
✓—detailed
between BI
✓ STAR.
ergy The main goals
simulation, of thisa study
through review are
of the
the analysis
main of the commercial
existing interaction between BI
The
8.
BIM application
Discussion
software on a case
Archicad study gave
Thermoregulation
and the capacity
plug-inthe for
possibility to✓—basic
explore simulation and limits tools,
✓—detailed
advantagesEcoDesigner of and
ergy Nominal
simulation,
fication and through
application a dynamic
of review
a methodology
energy
of✓—basic
the main
in aexisting
BIM ✓—detailed
commercial
environment tools,
by usingand
Gr
this
8. commercial
Discussion
STAR. The tools and,
application consequently,
on astudyPower
case study to provide some ✓ to explore
possible improvements. ✓ and
Building Systems The AC
main unit
goals Efficiency
of this
fication
BIM and
software the gave
[COP/EER]
are
application
Archicadanalysis
ofthe possibility
of
thethe
a methodology
and
✓—basic
interaction
plug-in for BIM advantages
between
in adynamic ✓—detailed
BIM andsimulation
environment
energy en-
by using Ec
Gr
lighting As said in Section 4, the
Sourcesselection
Emission of
typologies
system the analyzed tool ✓
was based on
✕ for dynamic some main ✓
✓criteria.
ergy The main goals
simulation, of this
through
BIM a study
review
software
STAR.are The
are
of the
the
Archicadanalysis
main of
existing
and the the interaction
commercial
plug-in between
tools, andBIM
theand
energy en-
identi-
simulation Ec
The first characteristics
ergy simulation, theapplication
Control versatility
system
Thermoregulation
through
on athe
and case study✕gave
possibility
✓—basic
the possibility
to combine BIM to
✓ explore advan
modelling
✓—detailed
fication and application
STAR. ofaThe
areview of the main
methodology
application onaaexisting
in BIM
case commercial
environment
study bytools,
gaveexport
the usingand theto
identi-
Graphisoft’s
possibility explore advan
with well-integrated
fication and applicationplug-in for
Powerenergy analysis, to import and
✓ building 2D
✓ draw-
BIM software Archicad of and a methodology
the plug-in for in adynamic
BIM environment
energy by using
simulation Graphisoft’s
EcoDesigner
8.ings,
lighting BIM modelling and
Discussion 3D visualization,
Sources typologies quasi-static energy
✓ todiagnosis, dynamic✓energy
BIM
STAR.software Archicadon
The application and the
a case plug-ingave
study for the
dynamic energy
possibility simulation
explore EcoDesigner
advantages and
diagnosis,
The calculation
main of
goals of thisthermal
Control bridges,
system and calculation of renewable
✕ energy sources. The
✓ and
STAR. The application on astudycase are the gave
study analysis
the of the interaction
possibility between
to explore BIM and
advantages en-
second characteristic is that it meets the requirements set by the most
ergy simulation, through a review of the main existing commercial tools, and the identi- advanced energy
8.diagnosisandstandards,
Discussion
fication applicationsuchof aasmethodology
UNI EN ISO in 52016-1
a BIMfor the calculation
environment in dynamic
by using hourly
Graphisoft’s
regime,
BIM The and
software ASHRAE
Archicad 140-2017
and and
the are UNI/TS
plug-in 11300
for dynamic on the monthly
energy simulationaverage stationary
main goals of this study the analysis of the interaction between EcoDesigner
BIM and en-
calculation.
STAR. Finally, it on
meets the study
validity requirements required by buildingSMART for
ergy simulation, through a review of the main existing commercial tools,advantages
The application a case gave the possibility to explore and
and the identi-
IFC certification. All these requirements, according to the conducted study and the results
fication and application of a methodology in a BIM environment by using Graphisoft’s
reported above, were confirmed.
BIM software Archicad and the plug-in for dynamic energy simulation EcoDesigner
Although the results of this study are satisfactory, some critical issues and disadvan-
STAR. The application on a case study gave the possibility to explore advantages and
tages were found within the application and possible fields. They can be addressed in
future research, in order to improve digital tools and achieve perfect integration between
BIM and BEM, without the passage of digital models in third-party analysis software. As
shown in Table 3, the major limitation that has been detected is the poor personalization of
data relating to heating systems. The type of data that can be set is limited and inherent to
the fundamental characteristics of the system, such as the nominal power, the thermoregu-
lation, the nominal capacity, and the COP/EER. It is not possible to specify the efficiency
and to insert the heating terminals with their technical specifications. Furthermore, it is not
possible to set the vapor diffusion resistance factor of the material, the efficiency and the
emission of the system.
Thus, as improvements of the tools there is the implementation of the possibility to
set these latter parameters. In particular, giving the possibility to set the vapor diffusion
Appl. Sci. 2021, 11, 2252 29 of 31

resistance factor of the materials, it will improve the calculation of possible surface and
interstitial condensation. Regarding the HVAC system, in order to provide a more precise
energy analysis, the tool could be improved by giving the possibility to set the efficiency
of the boiler and the emission system characteristics and typology. Furthermore, it could
be necessary to detail the parameters to be inserted regarding the nominal capacity, the
thermoregulation and the COP/EER. Finally, some details about the lighting system and
mainly the control system should be added.

9. Conclusions
The purpose of the paper is to study a new integrated energy simulation methodology
in a BIM environment by using Graphisoft’s BIM software Archicad and the plug-in for
dynamic energy simulation EcoDesigner STAR. They have been selected after a careful
study of the rules on energy analysis, an examination of the operational potential of
different software on the market, and research conducted by a wide scientific community
interested in various capacities in issues related to the interaction between architecture
and energy analysis. Thanks to the application on the case study, the advantages and
disadvantages of the existing tools were highlighted and compared. The greatest advantage
that is obtained from the use of ArchiCAD associated with EcoDesigner STAR is the
overcoming of one of the major problems in this field, namely the transition from BIM to
BEM. The modelling software allows the construction of a BIM model according to certified
tools. Plug-in allows its interpretation in BEM with an almost instantaneous operation
when the designer builds the BIM with the intention of conducting an energy analysis.
Another advantage of this tool is the feasibility to compare two or more variants of one of
the same building, both in the early stages of the project and in the final stages, managing
to choose the best solution according to needs. Furthermore, the output data looks user-
friendly. It is an important aspect for the designer, who can know the advantages and
disadvantages of a design choice almost immediately. Moreover, some critical issues and
disadvantages were found within the application and possible fields. The major limitation
that has been detected is the poor personalization of data relating to heating systems. The
type of data that can be set is limited and inherent to the fundamental characteristics of the
system, such as the nominal power, the thermoregulation, the nominal capacity, and the
COP/EER. It is not possible to specify the efficiency and to insert the heating terminals
with their technical specifications. Furthermore, it is not possible to set the vapor diffusion
resistance factor of the material, the efficiency, and the emission of the system.
These lacks can be used as a starting point for further improvements to the tool. The
possibility to set the vapor diffusion resistance factor of the materials would improve the
calculation of possible surface and interstitial condensation. Regarding a more precise
analysis, the tool could be improved by giving the possibility to set the efficiency of the
boiler and the emission system characteristics and typology and to detail the parameters
to be inserted regarding the nominal capacity, the thermoregulation, and the COP/EER.
Finally, some details about the lighting system and mainly the control system should
be added.

Author Contributions: Conceptualization, M.B., S.D.L. and G.L.; methodology, M.B., S.D.L. and
G.L.; software, S.D.L.; validation, M.B., S.D.L. and G.L.; formal analysis, M.B., S.D.L. and G.L.;
investigation, M.B., S.D.L. and G.L.; data curation, S.D.L.; writing—original draft preparation, M.B.,
S.D.L. and G.L.; writing—review and editing, M.B., S.D.L. and G.L.; visualization, M.B., S.D.L. and
G.L.; supervision, M.B. All authors have read and agreed to the published version of the manuscript.
Funding: This research received no external funding.
Institutional Review Board Statement: Not applicable.
Informed Consent Statement: Not applicable.
Data Availability Statement: The data presented in this study are available on request from the
corresponding author.
Appl. Sci. 2021, 11, 2252 30 of 31

Acknowledgments: This study starts from the degree thesis [50], carried out by Simone Di Lisi with
the fundamental support of Arch. Fabrizio Agnello and of the Ing. Marco Beccali.
Conflicts of Interest: The authors declare no conflict of interest.

References
1. Wong, J.H.; Rashidi, A.; Arashpour, M. Evaluating the Impact of Building Information Modeling on the Labor Productivity of
Construction Projects in Malaysia. Buildings 2020, 10, 66. [CrossRef]
2. Tu, K.J.; Vernatha, D. Application of Building Information Modeling in energy management of individual departments occupying
university facilities. Int. J. Archit. Environ. Eng. 2016, 10, 225–231.
3. Alahmad, M.; Nader, W.; Neal, J.; Shi, J.; Berryman, C.; Cho, Y.; Lau, S.-K.; Li, H.; Schwer, A.; Shen, Z.; et al. Real Time Power
Monitoring & integration with BIM. In Proceedings of the IECON 2010—36th Annual Conference on IEEE Industrial Electronics
Society, Glendale, AZ, USA, 7–10 November 2010; pp. 2454–2458.
4. Woo, J.H.; Diggelman, C.; Abushakra, B. BIM-based energy monitoring with XML parsing engine. In Proceedings of the 28th
ISARC, Seoul, Korea, 29 June–2 July 2011; pp. 544–545.
5. Maltese, S.; Tagliabue, L.C.; Cecconi, F.R.; Pasini, D.; Manfren, M.; Ciribini, A.L.C. Sustainability Assessment through Green BIM
for Environmental, Social and Economic Efficiency. Procedia Eng. 2017, 180, 520–530. [CrossRef]
6. Shin, M.; Haberl, J.S. Thermal zoning for building HVAC design and energy simulation: A literature review. Energy Build. 2019,
203, 109429. [CrossRef]
7. Waibel, C.; Evins, R.; Carmeliet, J. Co-simulation and optimization of building geometry and multi-energy systems: Interdepen-
dencies in energy supply, energy demand and solar potentials. Appl. Energy 2019, 242, 1661–1682. [CrossRef]
8. Liu, S.; Ning, X. A Two-Stage Building Information Modeling Based Building Design Method to Improve Lighting Environment
and Increase Energy Efficiency. Appl. Sci. 2019, 9, 4076. [CrossRef]
9. Jeong, W.; Yan, W.; Lee, C.J. Thermal Performance Visualization Using Object−Oriented Physical and Building Information
Modeling. Appl. Sci. 2020, 10, 5888. [CrossRef]
10. Clarke, J.; Hensen, J. Integrated building performance simulation: Progress, prospects and requirements. Build. Environ. 2015, 91,
294–306. [CrossRef]
11. Ramaji, E.; Memari, A.M. Review of BIM’s application in energy simulation: Tools, issues, and solutions. Autom. Constr. 2019, 97,
164–180.
12. Andriamamonjy, A.; Saelens, D.; Klein, R. A combined scientometric and conventional literature review to grasp the entire BIM
knowledge and its integration with energy simulation. J. Build. Eng. 2019, 22, 513–527. [CrossRef]
13. Bracht, M.; Melo, A.; Lamberts, R. A metamodel for building information modeling-building energy modeling integration in
early design stage. Autom. Constr. 2021, 121, 103422. [CrossRef]
14. Kamel, E.; Memari, A.M. Automated Building Energy Modeling and Assessment Tool (ABEMAT). Energy 2018, 147, 15–24.
[CrossRef]
15. Kim, J.B.; Jeong, W.; Clayton, M.J.; Haberl, J.S.; Yan, W. Developing a physical BIM library for building thermal energy simulation.
Autom. Constr. 2015, 50, 16–28. [CrossRef]
16. El Sayary, S.; Omar, O. Designing a BIM energy-consumption template to calculate and achieve a net-zero-energy house. Sol.
Energy 2021, 216, 315–320. [CrossRef]
17. Xu, X.; Mumford, T.; Zou, P.X. Life-cycle building information modelling (BIM) engaged framework for improving building
energy performance. Energy Build. 2021, 231, 110496. [CrossRef]
18. Utkucu, D.; Sözer, H. Interoperability and data exchange within BIM platform to evaluate building energy performance and
indoor comfort. Autom. Constr. 2020, 116, 103225. [CrossRef]
19. Rodrigues, F.; Isayeva, A.; Rodrigues, H.; Pinto, A. Energy efficiency assessment of a public building resourcing a BIM model.
Innov. Infrastruct. Solut. 2020, 5. [CrossRef]
20. Tushar, Q.; Bhuiyan, M.A.; Zhang, G.; Maqsood, T. An integrated approach of BIM-enabled LCA and energy simulation: The
optimized solution towards sustainable development. J. Clean. Prod. 2021, 289, 125622. [CrossRef]
21. Alam, J.; Ham, J.J. Towards a BIM-based energy rating system. In Proceedings of the 19th International Conference on Computer-
Aided Architectural Design Research in Asia: Rethinking Comprehensive Design: Speculative Counterculture, Kyoto, Japan,
14–16 May 2014; pp. 285–294.
22. Jalaei, F.; Jrade, A. Integrating BIM with Green Building Certification System, Energy Analysis, and Cost Estimating Tools to
Conceptually Design Sustainable Buildings. In Proceedings of the Construction Research Congress 2014, Atlanta, GA, USA, 19–21
May 2014; American Society of Civil Engineers (ASCE): Reston, VA, USA, 2014; pp. 140–149.
23. IESVE. Available online: https://www.iesve.com/software/BIM (accessed on 10 January 2021).
24. ENERGY PLUS. Available online: https://energyplus.net/ (accessed on 10 January 2021).
25. Hirsch, J.J.; Lawrence Berkeley National Laboratory. eQUEST. Available online: http://www.doe2.com/eQuest/ (accessed on 12
January 2013).
26. Gao, H.; Koch, C.; Wu, Y. Building information modelling based building energy modelling: A review. Appl. Energy 2019, 238,
320–343. [CrossRef]
27. Autodesk. Available online: https://www.autodesk.com/products/revit/architecture (accessed on 10 January 2021).
Appl. Sci. 2021, 11, 2252 31 of 31

28. Graphisoft. Available online: https://graphisoft.com/ (accessed on 10 January 2021).


29. Allplan. Available online: https://www.allplan.com/us_en/ (accessed on 10 January 2021).
30. Muñoz, J.N.; Manzanares, F.V.; Gonçalves, M.M. BIM Approach to Modeling a Sports Pavilion for University Use. Appl. Sci. 2020,
10, 8895. [CrossRef]
31. Available online: https://www.acca.it/bim-modeling-software?gclid=CjwKCAiAxeX_BRASEiwAc1Qdkb_-Th144lYXAi8UFc8
tsWEIJt745zXabINlVxZUYBia5CbHvS0zIBoCCYkQAvD_BwE (accessed on 3 March 2021).
32. ASHRAE 140-2017. Available online: https://xp20.ashrae.org/140-2017/ (accessed on 3 March 2021).
33. Decreto Legislativo 29 Dicembre 2006, n. 311 “Disposizioni Correttive ed Integrative al Decreto Legislativo 19 Agosto 2005,
n. 192, Recante Attuazione della Direttiva 2002/91/CE, Relativa al Rendimento Energetico Nell’edilizia”. Available online:
https://www.camera.it/parlam/leggi/deleghe/testi/06311dl.htm (accessed on 3 March 2021).
34. Decreto Legislativo 30 Maggio 2008, n. 115 “Attuazione della direttiva 2006/32/CE Relativa All’efficienza Degli Usi Finali
Dell’energia e i Servizi Energetici e Abrogazione Della Direttiva 93/76/CEE”. Available online: https://www.camera.it/parlam/
leggi/deleghe/08115dl.htm (accessed on 3 March 2021).
35. UNI/TS 11300-1:2014, Prestazioni Energetiche Degli Edifici—Parte 1: Determinazione del Fabbisogno di Energia Termica
Dell’edificio per la Climatizzazione Estiva ed Invernale. Available online: http://store.uni.com/catalogo/uni-ts-11300-1-2014
(accessed on 3 March 2021).
36. UNI/TS 11300-2:2019, Prestazioni Energetiche Degli Edifici—Parte 2: Determinazione del Fabbisogno di Energia Primaria
e dei Rendimenti per la Climatizzazione Invernale, per la Produzione di Acqua Calda Sanitaria, per la Ventilazione e per
L’illuminazione in Edifici non Residenziali. Available online: http://store.uni.com/catalogo/uni-ts-11300-2-2014 (accessed on 3
March 2021).
37. Design Builder. Available online: https://designbuilder.co.uk// (accessed on 10 January 2021).
38. Open Studio. Available online: https://www.openstudio.net/ (accessed on 10 January 2021).
39. Simergy. Available online: https://d-alchemy.com/products/simergy (accessed on 10 January 2021).
40. Logicalsoft. Available online: https://www.logical.it/software-per-la-termotecnica (accessed on 10 January 2021).
41. UNI EN ISO 52016-1:2018, Prestazione Energetica Degli Edifici—Fabbisogni Energetici per Riscaldamento e Raffrescamento,
Temperature Interne e Carichi Termici Sensibili e Latenti—Parte 1: Procedure di Calcolo. Available online: http://store.uni.com/
catalogo/uni-en-iso-52016-1-2018 (accessed on 3 March 2021).
42. EcodesignStar. Available online: https://www.bimtechla.com/pdf/Brochure-EcoDesigner_STAR_Brochure.pdf (accessed on 3
March 2021).
43. Mazzarella, L. Dati climatici G. De Giorgio. In Giornata Di Studio Giovanni De Giorgio; Politecnico di Milano: Milano, Italy, 18
November 1997.
44. Stirling, J.; Gowan, J. Flats at Langham House, Ham Common, Richmond. In Architectural Design; 1958; Available online:
https://historicengland.org.uk/listing/the-list/list-entry/1051027 (accessed on 3 March 2021).
45. Izzo, A.; Gubitosi, C. James Stirling, Officina Edizioni, Roma. 1976.
46. Decreto Interministeriale 26 Giugno 2015—Applicazione Delle Metodologie di Calcolo Delle Prestazioni Energetiche e Definizione
Delle Prescrizioni e dei Requisiti Minimi Degli Edifici. Available online: https://www.gazzettaufficiale.it/eli/id/2015/07/15/1
5A05198/sg (accessed on 3 March 2021).
47. D.P.R. 26 August 1993, n. 412 (Annex A), on the subject of the “Regulation containing rules for the design, installation, operation
and maintenance of the thermal systems of buildings for the purpose of containing energy consumption”.
48. UNI EN ISO 15927-6: 2008, in Terms of Performance Hygrometric Temperature of Buildings—Calculation and Presentation of
Climatic Data—Part 6: Cumulated Temperature Differences (Degree Days). Available online: https://standards.iteh.ai/catalog/
standards/sist/3da76bd7-e17c-4e3c-a10e-4f0be76d017d/sist-en-iso-15927-6-2008 (accessed on 3 March 2021).
49. Degreedays. Available online: https://www.degreedays.net/#generate (accessed on 10 January 2021).
50. Di Lisi, S. Simulazione Energetica in Ambiente BIM Per Il Progetto di Architettura. Master’s Thesis, University of Palermo,
Palermo, Italy, 2020.