COMMISSIONING PLAN
[DRAFT]
Plan Approved:
Signature Title Date
Commisionning Plan MTC ADIA Draft
TABLE OF CONTENTS
1. Overview
1.1. Purpose of the Commissioning Plan
1.2. Commissioning Scope
1.3. Commissioned Systems List
1.4. Forms
2. TCMO Organization Chart
3. Commissioning Parties
4. Roles and Responsibilities
4.1. Commissioning Parties
4.2. General Management Plan
4.3. General Descriptions of Roles
4.4. Scheduling
5. Commissioning Process
5.1. Commissioning Follow up Sheet
5.2. Commissioning Meetings and Progress Reporting
5.3. Off Site Tests and Inspections
5.4. Pre-commissioning Checkouts
5.5. Execution of Commissioning Test Procedures
5.6 Integration Tests Commissioning Strategy
5.7. O&M Manuals and Warranties
6. Summary
APPENDIX 1
Commisionning Plan MTC ADIA Draft
1. Overview
1.1. Purpose of the Commissioning Plan
The Commissioning Plan provides direction for the commissioning tasks to demonstrate proper
performance of the critical systems before handing over. The plan clearly defines the responsible
parties, the commissioning organization of the main contractor, the information flow and the
reporting structure of the commissioning process.
1. Provide direction for the development of the commissioning procedures according to the MTC
Contract specification requirements and guidelines stated in: 01 33 00 Submittal Procedures , 01
45 00 Quality Control and Testing, 01 46 00 Factory Testing, 01 77 00 Project Close-out, 01 78
23 Operation and Maintenance Data , 01 78 36 Warranties , 01 78 43 Spare Parts, Tools, and
Extra Stock Material, 01 79 00 Demonstration and Training , 01 91 00 Commissioning, 01 92 00
Operational Support, 01 99 00 Operational Readiness.
2. Provide direction for the commissioning process, particularly defining the structure of the
subject systems and define & coordinate related commissioning activities in terms of reports,
procedures and responsible parties.
3. Define the dependencies of the activities via other Contract packages within ADIA and verify
relevant testing procedures are implemented correctly e.g. by embedding provisions for
interfaces and future tasks as necessary.
4. Outline rules providing the commissioning activities are reviewed ad scheduled in
accordance with the construction programme.
5. Keep track that inherent activities such as training, spare parts handovers are fulfilled.
This plan does not intend to provide detail of each procedure which depends on vendor
specific and industry wide practices but outline and wrap the activities to be executed. The
detailed testing requirements and procedures are to be submitted to the Consultant through
TCMO for review and comment.
1.4. Forms
Forms used during commissioning overviewing & wrapping up subcontractors or manufacturers
SAT forms / Checklists are found in Appendix 1 of this plan.
3. Commissioning Parties
[Here each member playing a role in the commissioning process has been identified and contact
information to be given]
Parties are indicated in section 3. For each system related MEP Department Mngs, Project
Manager of Subcontractor or Project Manager of Vendor where applicable, shall be
primarily responsible for the execution of the commissioning tasks.
TCMO forms a workgroup consisting of related technical departments inclusive QA/QC and
Technical office of the main contractor to follow up and review execution of commissioning tasks.
In case of need subcontractors and manufacturers shall be involved in the workgroup. All
parties will work together to fulfill their contractual responsibilities and meet the objectives of
the Contract Documents.
4.4. Scheduling
The Main Contractor will integrate all commissioning activities within its project schedule via TO
and monitor the progress on the project schedule.
During the construction progress, in necessary cases schedules related to the Commissio ning are
to be revised and relevant parties shall be informed timely.
5. Commissioning Process
The objective of Commissioning is to demonstrate that each system is operating according to the
documented design intent and Contract Documents. Commissioning testing facilitates bringing
the systems from a state of substantial completion to full dynamic and integrated operation
where Interfaces and sequencing & scoping of the works to be clearly described , from an
Integrated Commisioning perspective.. Additionally, during the testing process, areas of deficient
performance are identified and corrected, improving the operation and functioning of the
systems. In general each system should be operated through all modes of operation. Inter-
system integration performance shall further be tested and checked within management level
systems. The DC in coordination with TCMO oversees and coordinates the development
test procedures in a sequential written form; and coordinates, directs and documents the
actual testing, which will be performed by the installing subcontractor or vendor.
Commisionning Plan MTC ADIA Draft
Upon complete installation of any individual equipment component or complete system a series of
precedent actions need to be undertaken before actual system commissioning takes place. These are
generally divided into the following categories:
Tentatively each week TCMO calls for a short commissioning meeting to update parties involved
in commissioning. These meetings will cover coordination, deficiency resolution and planning
issues. The frequency of such meetings will be fitted to the construction progress, until the final
6 months of the construction when they will be held as frequently as one per week. Minutes of
such meetings will be submitted to all parties for information and action.
The Employer/Consultant can call meetings if and when he considers such meetings are
required.
Factory Acceptance Tests / Source Inspections: Factory Acceptance Tests and Source
Inspections will be planned and scheduled by each DC, , according to the Contract Specifications
and preceding requirements of the CA. Factory Acceptance Tests witnessing and source
inspections shall participated by representatives of CO or CA . The DC will coordinate the tests
and inspections with the Manufacturer(s). The tests will be performed by the Manufacturer. The
test results will be received by DC and submitted to QM & TCMO trough DCC for the records.
Manufacturers’ Tests and Certificates: For the Manufacturers’ tests which witnessing or
inspection is not necessary according to the Contract Specifications, the tests will be performed
by the manufacturer. Certificates of compliances to industry standards and conventions will be
submitted to TCMO & QM trough DCC.
Pre-commissioning is important to ensure that the equipment and systems are operational and
that commissioning testing may proceed without unnecessary delays. The pre-commissioning
activities for a given system must be successfully completed prior to formal commissioning also
providing time to remedy any malfunctions. In case needed a sampling strategy may be used.
Commisionning Plan ADIA Draft
The pre-commissioning test reports shall be signed off by QM & TCMO supervisors and punch
lists to be followed up.
5.6.1.5. Demonstrate that the complete integrated configuration of systems internal and
external to MTC meets the contractual technical specifications using the
approved hardware and software.
Functional test
6. Summary
The work flow of the commissioning process is summarized in the table below:
Description
İtem Created By Received By Reviewed
/Approved By
Commissioning TCMO Commissioning Plan All Commissioning CO (A)
Plan (Wrap parties
Procedure)
Commissioning DC ,Subs Defines subject systems , TCMO QM TO TCMO
Follow up Sheets ,Mfg constituents as per location
or just system
Commissioning DC ,TO Defines timing of activities TCMO TCMO TO
Schedules
Commisoning DC Defining the execution of TCMO TCMO CO(A)
Test Procedures ,Subs,Mfgs specific test per system
Precommisioning DC Filled out checklists TCMO TCMO
Checklists ,Subs,Mfgs
Commissioning TCMO Record / track of all activities All CO
Progress Meeting mainly in form of MoM
Filled out & signed Subs/Mfg DC Recorded documentation of TCMO CO CA (A)
Commisoning Test the test on the form
forms