Professional Documents
Culture Documents
13
EXISTING UNDERGROUND 9
14
1800∅ PIPE TO FPU 1 INLET 5
10
15
16
11
UASBR UASBR DC-2. 1
6 DEW
ATERI
NG S
UMP
12
I C-2
7 DC- 2.2
3
UASBR
FROM FAL 1 4
FPU 1 INLET SUMP
I C-1
P
L ATF
ORM
IL.118.00
DEW
ATERI
NG
SUM
P
D C
- 1.1
IL.120.330
DC-1. 2
THIS UNIT
KEYPLAN
IL. 120.330
BYPASS LINE 4
EXISTING UNIT/CHANNEL
PROPOSED UNIT/CHANNEL
PLAN AS PER SITE TBM : 123.235
REFERENCE : UPJN APPROVED HFD DRAWING NO. (GSJ/STP/KNP/002)
NOTES
1) ALL DIMENSIONS ARE IN MM, AND LEVELS ARE IN METERS.
TOC:121.981 1) DETAILING WILL BE DONE AFTER SURVEY OF SITE.
FG: 121.500 2200 MM CHANNEL TOC:121.764
TWL:121.530
R3 AS PER UPJN LETTER NO 583/W12/59 DT. 08.09.2022 VS 12.09.2022
R2 AS PER UPJN LETTER NO 498/W12/52 DT. 11.08.2022 VS 24.08.2022
IL:120.330 IL:120.330 R1
RELOCATED THE CHAMBER ON MAIN LINE AFTER
VS 25.07.2022
STC SUGGESTION ON 22.07.2022
REV DESCRIPTION DRAWN DATE
CLIENT:
1800MM∅ UTTAR PRADESH JAL NIGAM - KANPUR
PIPE
CONSESSIONAL :
KANPUR RIVER MANAGEMENT PVT. LTD.
IL:118.00
TO FPU PROJECT TITLE :
210 MLD UASBR BASED SEWAGE TREATMENT PLANT AT KANPUR, U.P.
SECTIONAL PLAN, HFD, GA DRAWING OF BYPASS LINE 4