Design Detailed Report Prepared By - SHAIK AHMED JAWAD – B.E.

CIVIL
Trainee Structural Design Engineer, MS-12 BATCH 27th JULY 2018

VI. STABILITY CHECKS

1.Inter Story Drift ratio should be less than 0.004X storey height=0.004X2.9=0.0196.
for Spec x = 0.001082
for Spec y = 0.001003
hence, safe.
2.Maximum deflection allowed against wind is H/500=23000/500 or 23/.5=46mm
Wx = 4.69mm
Wy = 6.26mm
hence, safe.
3.Maximum deflection allowed against earthquake is H/250=25900/250 or
25.9/.25=103.6mm
for Spec x = 17.79mm
for Spec y = 14.96 mm
hence, safe.
4.Maximum Deflection against cantilever or any individual element allowed =
Span/350 or 20mm whichever is less.
Span/350=3490/350 or 3.49/.35 =9.975mm
Total Max deflection=6.43 mm
Deflection of nearer compression member=4.125 mm
effective deflection of slab=6.43-4.125 = 2.305mm
total deflection (including long term deflection) = 2.305x3=6.915 mm
6.915 ˂ 9.97 mm hence, o.k.
5.Guideline for Fundamental time period = 0.1 x N =0.1 X 9 =0.9
time period = 0.998 Sec
It is ok.
6.No of modes given should be given in such a way that around 95% to 98% modal
mass participation ratio shall be achieved.
Sum Ux = 0.9756
Sum Uy = 0.9504
It is ok.
st
7.1 mode of vibration is performed to be translation mode
Ux = 84.1%, Uy =0.63% & Rz = 1.49% < 5%
Hence ok.
8.Frequency of building
1/T = 1/0.998 = 1.002 Hz
Which is more than 1
Thus, no need to perform dynamic analysis of wind considering wind gust
factor.
9.There is no key element in this project.