You are on page 1of 1

1 2 3 4 5 6

GENERAL KEY PLAN:

W E

MAKKAH
S

GULF OF
E AQABA

10K NCV

cast with the base


Kicker integrally
Additional
reinforcement
steel replace with
T18@150mm NOTES:

Water
Stop
LEGEND:

F.F.L. - FINISH FLOOR LEVEL


C.J. - CONSTRUCTION JOINT
U/W L - UNDERWATER LIGHTS

SECTION (A-A) - RFT


4
Water
Stop
cast with the base
Kicker integrally
C

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF NEOM. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT FROM NEOM.
SWIMMING POOL PLAN RFT
6

Additional
reinforcement
steel replace with
T18@150mm

01 ISSUED FOR APPROVAL 03-06-2023


REV DESCRIPTION APP DATE

EMPLOYER: DBFOM DEVELOPER:

B NESMA COASTAL
WALL CORONER TYPICAL RFT COMPANY LIMITED
7

PROJECT MONITOR & DESIGN REVIEW: EPC CONTRACTOR :

Kicker integrally Water


cast with the base Stop
DISCIPLINE NAME:
Water Kicker integrally
STRUCTURAL PACKAGE
Stop cast with the base

4800000621
NEOM CLUSTER A & B
SWIMMING POOL-2 (4 LANES) FLOOR PLAN

DRAWINGS TITLE :

REINFORCEMENT

PROJECT NAME:
A
10K Construction Village at CV GoA North
SECTION (B-B) - RFT NEOM Construction Village 10K
5
NEOM
KINGDOM OF SAUDI ARABIA
REGION ASSET CODE CONTRACT CODE

620000 4800000621
DRAWING NUMBER
ORIGINATOR DISCIPLINE DOCUMENT TYPE SEQUENTIAL NUMBER REV NO.

NAP ARC 00

You might also like