DXB-23-13146077-Rev.0 (C264 From Schneider Electric)
DXB-23-13146077-Rev.0 (C264 From Schneider Electric)
Non-Binding Offer
Supply of configured C-264 to SCAN
OFFER FOR
Scan Electromechanical
Cont. Co. L.L.C.
Non-binding Offer
09/06/2023
Job No:OP-210411-10742031
Reference No: DXB-23-13146077
Supply of configured C-264 to SCAN
Date: 6/9/2023
____________________________________________________________________________________
Dear Sirs,
We refer to the above-mentioned subject and your reference number, Schneider Electric is pleased to present
its best budgetary and non-binding proposal in response to the above-mentioned inquiry and this proposal is
based on the elements that were provided to us to date.
For the sake of clarity and avoidance of doubt, this proposal is non-binding and estimated, and it has been
established based on the technical and commercial standards generally used by the Schneider Electric and
the information made available to us, no purchase order, contract and/or agreement shall be binding upon any
Schneider Electric affiliated entity as a result of this non-binding proposal.
We trust that this proposal will be of interest to you. Should you need any further information, please do not
hesitate to contact us.
Yours faithfully,
SCHNEIDER ELECTRIC
Page 2/6
Documentation Modification:
Page 3/6
Page 4/6
Our offer does not include any Man-days for EPNP for site testing and commissioning which shall be charged in man-day rates indicated
below. Man-days are counted based on our engineer’s presence on site.
Commissioning Engineer:
Per man-day (8 hours or less working time including lunch break): 2500 USD
Conditions for site services applied.
1.3 Exclusions
- Level 2 (HMI system-software licenses) for Power Automation System
- Site commissioning (To be charged in men day rates)
- Local HMI for the Power Automation PLC’s
- GPS System (shall be provided by network timing protocol from the existing SCADA system)
- System training for customer team, can be offered as optional price, if required
- Spare parts (to be offered as optional price, if required)
- Advanced Cybersecurity system
- Firewall
- Transducers
- Any kind of major Civil works
- Power source
- Control & relay panels
- IEDs (relays, meters)
- Field wiring & Control cables – its supply laying & termination
- Any kind of Cables - its supply laying & termination outside the SCMS cubicle
- IFAT-Integrated Factory Acceptance Test in the switchgear factory (to be charged additional in men day basis, if required)
- Any kind of works or modification on the existing Level 2 SCADA system
- Expenses towards mob/ demob, food etc. for customer personnel for training & FAT
- Any kind of co-ordination with local authority
- ICD/CID files for relays if any
- Relay setting software
- Telecom devices (PLC, modem, etc.)
- Current and voltage transformers
- UPS, battery, chargers
- AC/DC auxiliary distribution systems
- Current and voltage injection test kits
- Type and special test
Page 5/6
2.2 Incoterms
The equipment shall be delivered FCA, JEBEL ALI FREE ZONE-UAE
3 Other conditions
In all cases, this proposal is to be considered as an estimation, the content of which is subject to variation, therefore Schneider Electric
reserves its right to modify it at all terms, including the price and Schneider Electric shall in no way be bound by any other conditions. It is
agreed by the recipient that this budgetary and non-binding proposal shall have no commercial and/or financial consequences on
Schneider Electric in any way whatsoever. Schneider Electric’s General Conditions are available upon request, if not attached hereto.
Page 6/6