BUILDING INFORMATION MODELING (BIM)
REQUIREMENTS
JKR
BUILDING INFORMATION MODELLING (BIM)
REQUIREMENTS
FOR
TABLE OF CONTENTS.............................................................................................................. i
LIST OF TABLES....................................................................................................................... ii
i
3.3 DETAILED DESIGN PHASE .......................................................................................21
LIST OF TABLES
ii
LIST OF APPENDICES
Category: MATERIAL..........................................................................................................67
iii
Family Category: DOOR .....................................................................................................87
iv
1 GENERAL PRINCIPLES
1.1 This JKR Building Information Modelling (BIM) Requirements forms part of the
Contract.
1.2 The purpose of this JKR BIM Requirements is to define the minimum requirements
for the use of BIM in the project and shall include the generation of information rich-
model, model revision, visualization and analysis, and collaborative use of BIM
throughout the project duration as defined in the document.
1.3 This JKR BIM Requirements does not effectuate or require a restructuring of a
contractual relationships or shifting of risks of the Contractor. Nothing in these
requirements shall relieve the Contractor from its obligation, nor diminish the role of
the Contractor as the person responsible for and in charge of the design,
construction, completion, supervision and maintenance of the project.
1.4 Unless otherwise agreed in the BIM Project Execution Plan (BPEP), the dimensional
tolerances provided in the Government’s Technical Requirements shall apply to
dimensions in a model.
1.5 The BIM models are not intended to provide the Level of Development (LOD)
needed to extract precise object and material quantities, unless this is required and
agreed in the BPEP.
1.6 None of the documents in this JKR BIM Requirements shall be used by the
Contractor for any purpose other than this Contract.
1.7 The Contractor shall provide everything necessary for the proper execution of BIM
until its completion according to the true intent and meaning of the Contract taken
together whether the same may or may not be particularly shown or described
provided the same can be reasonably inferred therefrom.
1
1.8 The Appendices to this Contract; including but not limited to Government’s
Requirements, Contractor’s Proposal, BIM models and any drawings, documents
produced from the models; are to be taken as mutually explanatory of one another,
but in the event of any discrepancy and ambiguity the same shall be explained by
the P.D. to the Contractor who shall rectify the discrepancy at his own cost and
expense.
1.12 The Government gives no warranty in any manner or whatsoever for any information
provided by the Government in the Contract as to their accuracy or sufficiency or as
to how the same shall be interpreted and the Government shall not be liable if such
information is inaccurate or insufficient. The Contractor shall not be relieved from
his obligations to ensure that such information is accurate and sufficient for the
purpose of this Contract.
2
2 BIM PROJECT REQUIREMENTS
The Description of the Scope of Works Related to BIM in the project are as per Appendix
A1 attached.
2.2.1 The principal objective of incorporating BIM is to improve the quality of project
delivery and the exchange of information between the relevant stake holders.
BIM project requirements shall include modelling, visualization, analysis and
documentation of the building design and shall assist in validating the scope
and cost of the project. This requires cooperation among the Contractor’s
project team, JKR’s project team and client. The use of BIM in this project shall
involve the processes of creating information-rich BIM models, analysis and
production of design documents from the models. The generated models and
analysis results shall be used to support the decision making process required
for the project.
2.2.2 The BIM processes shall be used for the design which include but not limited
to architectural, structural, civil, mechanical and electrical works, and specialty
equipment. During the design development phase, BIM shall be used to
develop and establish the basis of design in accordance with JKR BIM
Requirements and Government’s Technical Requirements. The BIM
objectives for this Project are as per described in Appendix A2.
2.3.1 The Contractor shall coordinate and prepare the BIM Deliverables as indicated
in the Appendix A3. The typical BIM elements to be provided in the BIM
models shall be in accordance with the Government’s Technical
Requirements, JKR BIM Requirements, ‘Garis Panduan BIM JKR’ and
‘Piawaian BIM JKR’, unless otherwise specified in the BPEP and subject to
the P.D.’s acceptance.
3
2.3.2 The model shall include all geometry, physical characteristics, materials,
coding, tagging, graphic, specifications and product data needed to describe
the design and construction works, and the as-built for the works done. All
drawings, schedules, simulations and services required for assessment,
review, analysis and construction shall be extracted from this model.
2.3.4 The Contractor shall be liable for any electronic file corruption or unintended
amendment, modification or alteration of data available in the BIM deliverables
during the transmission and/or submission process. The Contractor shall
ensure that the BIM deliverables are protected from any threat during
transmission via folders/devices/web/internet by providing comprehensive
maintenance, routine scanning and back-up programs throughout the contract
period until the issuance of Certificate of Practical Completion, all at the
expenses of the Contractor. The maintenance shall include all necessary
periodic servicing and renewal of licenses, fees and charges for the usage of
the BIM deliverables.
2.4.1 The BIM platform used in JKR is Autodesk and the software used are as
shown in Table 1:
4
2.4.2 All BIM model shall be developed with the most current version of JKR BIM
Project and Family Template, ‘Garis Panduan BIM JKR’ and ‘Piawaian BIM
JKR’ and shall be compatible with the current version of the BIM application
currently in used by JKR. In addition, all models shall be provided to P.D. as
per latest version of software as stated in Table 1.
2.4.3 The Contractor shall be responsible to organize and update the BIM models
to the latest version of the platform used, from time to time, all at the expenses
of the Contractor.
The P.D shall have non-limited rights to access all the electronic and digital files
including BIM model, analysis reports and the associated data (including drawings)
stored and shared in the BIM data centre at any time for the purpose of inspection,
monitoring of the works and administration of the contract as and when required from
the commencement of the contract until the issuance of the Certificate of Practical
Completion. The P.D. may extend the authorization of accessibility to his
representatives and project team, as and when required throughout the contract
period at his own discretion.
2.6.1 The Contractor shall submit an outline of BIM Project Execution Plan (BPEP)
in his proposal for tender bidding purpose. The successful Contractor then
shall update the BPEP based on the acceptance from the P.D.
a) Project information;
d) BIM deliverables;
5
i) Collaboration and coordination procedures;
j) Quality control;
l) Model structure.
2.6.3 The Contractor shall update the contents of the BPEP progressively. For
monitoring purpose, the Contractor shall submit the updated BPEP
progressively to the P.D., each at the stages of 10%, 25%, 50%, 75% and
100% project physical progress. Nevertheless, the Contractor shall also able
to provide the updated BPEP at any construction progress stages whenever
required by the P.D.
2.6.4 The acceptance by the P.D. of such plan shall not relieve the Contractor of
any of his obligations under the Contract. The Contractor shall update and
revise the said BPEP during the progress of the work when necessary in order
to comply with the contract, all to the acceptance of the P.D.
2.6.5 The Contractor shall maintain records of development of all the BIM model in
each project phase according to their respective purposes.
2.6.6 In the event of any disagreement on the terms or modifications to the BPEP,
the Contractor must seek for the P.D.’s acceptance and such decision by the
P.D. shall be final and conclusive.
2.6.7 The BPEP shall be considered as a living document and the Contractor shall
continually develop and refine the document as required throughout the
project lifecycle to ensure the project remains on schedule and meets the
Government’s Requirements.
2.6.8 The Contractor shall at his own cost provide all access, assistance and
facilities to enable the P.D.’s Representative to verify the implementation of
the BPEP and adherence thereto.
6
2.7 BIM MANAGER, BIM COORDINATOR AND BIM MODELER
2.7.1 The Contractor must ensure that his project team (design and supervision)
have the competency, capability and capacity to execute BIM works and
deliver the task of BIM Manager, BIM Coordinator and BIM Modeler for this
project. These roles shall be undertaken by existing members in the project
team such as project manager, project engineer, site engineer, designer and
design checker; provided always, they have the relevant competencies and
experiences. The roles and responsibilities of the BIM Manager, BIM
Coordinator and BIM Modeler are as shown in Table 2.
BIM Team
Responsibilities
Member
• Manage, monitor and update BIM Project Execution Plan;
• Execute the model coordination process among disciplines;
BIM Manager
• Identify and solve problems related to BIM implementation; and
• Manage BIM data storage and sharing.
7
2.8 MODEL QUALITY
f) The use of correct component classification for modeling: e.g. the use of furniture
category object for a table;
g) The maintenance of parametric linkages within the model at all times to enable
automatic generation of all plans, sections, elevations, custom details and
schedules as well as 3D views. Documentation of the models shall not happen
outside of the BIM software;
h) The use of appropriate and interoperable viewing, checking, and output file
formats such as dwfx, nwd, etc.,
i) The use of model checking tools (e.g. Navisworks Manage) to confirm the validity
and accuracy of files/models and adherence to design requirement/needs
statement; and
8
3 MODEL DEVELOPMENT PHASE AND BIM DELIVERABLES
3.1.1 The Contractor shall provide BIM models created with LOD required for each
project phases specified in this JKR BIM Requirements. The models shall be
embodied with proper object information and parametric relationship in
accordance with good engineering practice.
3.1.2 The model development shall be classified in accordance with the project
development stages. The list of parameter names required to determine the
LOD are as per Appendix C1, C2, C3, C4, C5 and C6.
3.1.3 The model submitted shall be in manageable order by using project browser,
naming convention and project template according to ‘Garis Panduan BIM
JKR’ and ‘Piawaian BIM JKR’. All the above requirements must be managed
accordingly by using Project Browser in Revit. Similarly, these requirements
shall also be satisfied by using toolspace for Civil Model in AutoCAD Civil 3D.
3.1.4 Unless otherwise stated in this JKR BIM Requirements, any existing building
or structure that interfaces with the project shall be modelled as massing
model(s) to address the potential interferences at the areas of interface during
the project.
3.1.5 The Contractor must ensure that each model’s developed always adhere to
the Sistem Kod Aset Tak Alih (SKATA) and Garis Panduan Pengumpulan &
Pelabelan Aset Tak Alih Kerajaan (PeDATA). This includes naming
convention for building’s code, building’s level code, space area code and
component’s object code
3.1.6 All components in the model shall be tagged and labelled according to the
design component including but not limited to zoning and looping.
3.1.7 All floor areas, schedules of material and schedules of quantity shall be
extracted directly from the model to support cost estimation. These schedules
generated will be used solely as a guide for cost estimation. Any quantity or
figure produced in the Contractor's Proposal for any system or portion of work
shall be taken as purely indicative only. No claims shall be entertained on any
discrepancy in quantities and/or work items.
9
3.1.8 Unless otherwise specified, the Contractor shall refer to Appendix C1, C2, C3,
C4, C5 and C6 which indicate the parameter names required for LOD 300 to
LOD 500 for all the model elements and components used. Component
schedules shall be generated from the model to indicate all the symbols,
description and quantities for every element. However, any additional
parameter name and/or component family required by the Government in
order to suit the accepted design, shall be developed and added by the
Contractor and shall not be treated as variation to the contract.
3.1.9 The development of the BIM models required for this project must be
confirmed by using ‘Declaration Form of Conformity Requirements Of The BIM
Deliverables’ (Appendix B1, B2, B3, B4 and B5). The Contractor is required to
complete the checklist as listed in the Appendix B1, B2, B3, B4 and B5. The
Contractor shall submit all the BIM models including all the necessary
checklist forms as required together with their proposal.
All detailed design drawings submitted shall be generated from the model and
printed complete with approved parameter names for tittle block.
The BIM Deliverables for use in tender proposal phase are as follows:
i) Model Requirements
10
category, function, material, size, finishes, external and internal
function and other properties where applicable. Architectural elements
are to be modeled for within architectural discipline and
interdisciplinary coordination (details as per Appendix C1 and C2):
a) Road;
c) Parking lot;
d) Entrance;
e) Perimeter fencing;
• Roof
g) Roof accessories.
• Floor
11
a) Appropriate structural members needed to complete the
architectural model;
b) Finishes in layers;
d) Insulation;
e) Floor accessories;
• All walls, curtain walls and partitions including but not limited to:
a) All openings;
d) Architectural precast.
e) Finishes in layers;
g) Insulation;
h) Wall accessories;
• Ceiling
a) Ceiling system;
b) Finishes in layers;
c) Insulation;
d) Ceiling openings;
12
f) Type according to room function.
b) Finishes in layers.
• Ramps
• Hardscape
b) Furniture works;
- Furniture Systems.
13
c) Soft furnishings; and
All drawing shall be generated from the model. The Contractor shall
also provide the following drawings in CAD format and linked (CAD
link) to a different Revit file:
• Site plan;
• Landscape plan;
• Walls detailing;
• Gutter detailing;
• Miscellaneous item.
14
Vertical continuous elements such as walls, columns and staircase
shall be modeled separately according to levels.
• Total circulation;
• Capacity;
• Room finishes;
• Ceiling height;
15
• Beam;
• Slab;
• Column;
• Staircase;
• Ramp;
• Stiffener; and
16
3.2.1.3 Civil Works Model
Model the following Civil Works element as described in Civil Works
Needs Statement and as per designed to a level that defines the
design intent and accurately represents the detailed design solution.
Civil Works Model shall consist of but not limited to the following:
• Earthworks
• Internal Road System
• Drainage System
• External Water Reticulation System
• Sewerage System
All layout and detail drawings in relation to Civil Works design shall be
generated from the Civil Works Model.
The Contractor shall carry out coordination work with relevant parties
in accordance with good engineering practice. These elements shall
include (where applicable) but not limited to:
17
• Medical Gases Pipeline Systems;
• Laboratory Equipment;
• Mortuary System;
• Kitchen Equipment;
18
arrangement in the case of air-conditioning and mechanical ventilation
systems.
Conduits of 20mm or greater in size and all cable trays and trunking
are required to be modeled.
19
Electrical wiring circuit configuration shall be modeled to indicate the
actual design.
• The components modeled shall include, but not limited to, all
connectors for the mechanical and electrical components at
minimum of LOD 300.
20
component and material coding shall be generated from the models. All
information needed for Tender Drawings shall be graphically and
alphanumerically included in and derived from the model only.
• Hard Clash - Two (2) components or elements occupy the same space;
and
21
The Contractor shall fulfil the followings:
• The Clash Analysis Reports shall be submitted for reference as and when
requested by the P.D.; and
The successful Contractor shall continue to develop, maintain and update the
Architectural, Structural, Civil Works, Mechanical and Electrical Models (also known
as Construction Models) progressively during construction period. All information
22
needed for Construction Documents shall be graphically or alphanumerically
included in and derived from these models only. The components Level of
Development shall be not less than LOD 400 in which the models will include details
such as final size, shape, material and orientation used for construction and
fabrication purposes (Refer Appendix C1, C2, C3, C4 and C5).
The BIM Deliverables for use in the construction phase are as follows:
The Contractor shall update these models progressively to include any change
that may occur during construction.
Nevertheless, the Contractor shall also able to provide the updated models at
any construction progress stage whenever required by the P.D. The final
submission of the models shall lead to the production of the project As-Built
Models.
23
shall carry out Design Coordination for that particular part(s) involved, all in
accordance to Clause 3.3.2.
The Contractor shall update and link the As-Built Models with equipment and
asset information. It shall be the Contractor’s responsibility to acquire and
integrate the data into the said models. The As-Built Models shall be handed
over to the P.D. once the project is completed.
24
3.5.2 As-Built Drawings
The Contractor shall produce the As-Built Drawings generated from the As-
Built Models as specified in the Contract.
Soft copies of As-Built Drawings shall be submitted in .pdf, .dwfx and .dwg
formats.
The printed version of the As-Built Drawings as required by the contract shall
be produced from these soft copies.
4.1 All BIM Deliverables including but not limited to design, models, components,
templates, drawings, reports and all other relevant documents including other
electronic and digital files pertaining to this Contract shall be the absolute property
of the Government and not to be utilised or retained by the Contractor for any
purpose without the permission of the Government. The Government may make use
of these deliverables at its own discretion.
4.2 The Government shall reserve its right to grant its appointed agents, permission to
use all BIM Deliverables for the purpose of this Contract and subsequent operation
and maintenance of the works at its own discretion.
25
4.3 Any intellectual property rights arising out of all BIM Deliverables used for or
incorporated in the works shall vest in and become the sole property of the
Government, free and clear of all liens, claims and encumbrances. The Contractor
shall not during or at any time after completion of the works or after the expiry or
termination of this Contract, in any way, question or dispute the ownership of the
Government.
4.4 The Contractor shall grant to the Government free from all royalties, fees and other
charges, all licenses in respect of intellectual property rights now or hereafter owned
or controlled by the Contractor or in respect of which the Contractor has or will have
the rights to grant licenses of all BIM Deliverables developed or used for or
incorporated in the works or any part thereof.
4.5 All royalties or other sums payable in respect of all BIM Deliverables that which are
subject to copyright and use in the works shall be deemed to have been included in
the Contract Sum.
*********************************************
26
Appendix A 1
Project Title:
2. Quarters:
a) Class C
b) Class D
c) Class E
d) Class F
e) Class G √
3. Ancillary Buildings:
c) Guard House √
a) Earthworks
b) Road Works
c) Drainage System
e) Sewerage System
f) Other Elements:
i. …………………………………….
….. ( This list is not exhaustive and the Project Team can include other item ) ..…
27
Appendix A 2
Project Title:
1. To create:
2. To carry out:
3D visualization √
7. To update and complete:
……………………………………………………….
.…..… ( This list is not exhaustive and the Project Team can include other objective )
.…..…
28
Appendix A 3
Project Title:
29
Appendix A 3
30
Appendix A 3
31
Appendix A 3
i) Earthworks
ii) Road Works
iii) Drainage System
iv) External Water Reticulation System
v) Sewerage System
5. Coordinated Model
a) Building works model in softcopy (.rvt)
- Not less than LOD, 400 combination of:
i) Architectural Model √
ii) Structural Model
iii) Mechanical Model
iv) Electrical Model
b) For Civil Works in softcopy (.dwg)
(generated from the models created):
i) Earthworks
ii) Road Works
iii) Drainage System
iv) External Water Reticulation System
v) Sewerage System
6. Construction Simulation Model
a) Building works model in softcopy (.nwd)
i) Architectural Model √
ii) Structural Model
iii) Mechanical Model
iv) Electrical Model
D) CLOSE OUT PHASE:
1. Updating BIM Project Execution Plan (BPEP) as required √
2. As-Built Model
a) Building works model in softcopy (.rvt & .nwd)
- Not less than LOD 500. Shall consist of:
i) Architectural Model √
ii) Structural Model
iii) Mechanical Model
32
Appendix A 3
33
Appendix B 1
Appendix B 1: DECLARATION FORM OF CONFORMITY REQUIREMENTS OF THE BIM DELIVERABLES (ARCHITECTURAL MODEL)
Project Contractor
Phase Discipline
Date
34
Appendix B 1
Architectural Model should be properly organised Floor plan should be associated with
5. -
and using architectural gridlines and levels. appropriate levels.
35
Appendix B 1
B. PROJECT INFORMATION
Complete
No. Parameter Reference Remarks
√ (Yes), X (No)
36
Appendix B 1
3.0 Schedules/Quantities
4.0 Sheets
37
Appendix B 1
D. ARCHITECTURAL FAMILIES
[Please refer to Appendix B 1 D (a), (b), (c), (d) and (e) to check the Component File Naming According To Standards, Correct Family
Category and Complete Category, respectively].
1. Floors
4. Roofs
38
Appendix B 1
D. ARCHITECTURAL FAMILIES
[Please refer to Appendix B 1 D (a), (b), (c), (d) and (e) to check the Component File Naming According To Standards, Correct Family
Category and Complete Category, respectively].
5. Stairs
6. Railings
7. Ramps
8. Room
9. Curtain Systems
10. Doors
11 Windows
12 Caseworks
39
Appendix B 1
D. ARCHITECTURAL FAMILIES
[Please refer to Appendix B 1 D (a), (b), (c), (d) and (e) to check the Component File Naming According To Standards, Correct Family
Category and Complete Category, respectively].
13 Furniture
14 Plumbing Fixtures
15 Lighting Fixtures
16 Furniture Systems
17 Specialty Equipment
18 Generic Models
19 Columns
40
Appendix B 1
D. ARCHITECTURAL FAMILIES
[Please refer to Appendix B 1 D (a), (b), (c), (d) and (e) to check the Component File Naming According To Standards, Correct Family
Category and Complete Category, respectively].
Mechanical
20
Equipment
21 Entourage
22 Site
23 Parking
24 Planting
25 Pipes RWDP
26 Structural Framing
41
Appendix B 1
D. ARCHITECTURAL FAMILIES
[Please refer to Appendix B 1 D (a), (b), (c), (d) and (e) to check the Component File Naming According To Standards, Correct Family
Category and Complete Category, respectively].
27 Structural Trusses
28 Structural Column
29 Toposurface
30 Mass
31 Profile
32 Detail Items
42
Appendix B 1
Are the
Are the View
Views done
No. Visibility Graphics Templates Reference Remarks
Using the
Acceptible
Correct
and Easy to
View
Understand
Template
……………………………………… ………………………………………
Name :
Date:
43
Appendix B 1 A
No. DESCRIPTION
(1)
Item (1) as illustrated above are to be checked to determine that the initial grid A and
1 is placed on the Project Base Point.
44
Appendix B 1 A
No. DESCRIPTION
(2)
Door Window
and Wall
Item (2) as illustrated above are to be checked to determine that the architectural
elements are placed to the correct host. Example above shows the Folding Doors
and Window are hosted by wall.
45
Appendix B 1 A
No. DESCRIPTION
(d) Spatial Analysis using Area Plans and Coloured using Color Fill Legend
Illustration above are to be checked to determine that the spatial analysis views are
using Area Plan only and Coloured using Color Fill Legend.
46
Ver. 2016 Appendix B 1 B
B. PROJECT INFORMATION
No. DESCRIPTION
47
Appendix B 1 C
No. Description
(1)
Views According
to Phases
As illustrated above, item (1) in the Architectural Project Browser are to be checked
where the browser consists of project phases and the views done within the correct
phases. Example the Building Plan Submission model and drawing views are placed
in 3_PBT view.
48
Appendix B 1 C
No. Description
(b) Spatial and Zoning Analysis are done using Area Plan and Color Fill Legend:
(1)
As illustrated above, item (1) in the Architectural Project Browser for Spatial and Zoning
analysis are to be done with Area Plans only. Example the Gross and Nett plan views
are placed in Area Plans view.
49
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
Example: File Naming Standard for Doors Family (under Component Family
Category: Doors)
jkrAR16_wll_DGs_bb01_150_UM_ cae01-cam01_
[1] Field for Discipline and Revit Version: AR = Architecture, 16 = Version 2016;
50
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
(b) i. Example: File Naming Standard for Doors Family (under Component Family
Category: Doors)
[1] Field for Discipline and Revit Version: AR = Architecture, 16 = Version 2016;
51
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
[2] [4]
**The contractor should develop their own family organization based on the PWD’s BIM
Guidelines and Standards and Architectural Needs Statement.
Item (i) and (ii) as illustrated above are to be checked to determine the use of
component file naming is according to standard.
52
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
(1)
Family
Category
for Door
Item (1) as illustrated above is to be checked to determined the correct use of Family
Category for all Architectural Components.
53
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
54
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
(1)
Furnished
Parameter
Values
Item (1) as illustrated above are to be checked to determine the complete Parameters
and appropriate Values during tender stage for all Architectural Component in
Architectural Model. The example above is the Parameters and Values for Door.
55
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
56
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
(2)
Component
Naming
Item (2) as illustrated above are to be checked to determine that the components
naming are according to Standards.
57
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
(3)
Component
naming
according to
LOD
(4)
Parameter
Values that
are yet
furnished
according to
LOD 300
Item (3) and (4) as illustrated above are to be checked to determine that the
component is modelled according to the correct LOD for example, jkrAR16_col_(01)-
3 Metric Column.rvt modelled according to LOD 300 and the parameter values are
furnished.
58
(6)
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
(1)
(2)
(3)
(4)
Wall cut
Item (4) as illustrated above are to be checked to determine the system property e.g
wall in the architectural model are modeled with the correct material and construction.
For example the wall when cut has brickwall in the middle and finishes at both sides.
Refer to diagramme 1. 2. and 3.
59
Appendix B 1 D
D. ARCHITECTURAL FAMILIES
No. Description
(5)
Type
(6)
Wall
material
codes
Item (5) and (6) as illustrated above are to be checked to determine that the system
parameter using the correct type for the design purpose and the informations are
furnished. jkrAR_wll_DGs_bb_150_KC_ex_ae_cae-cam_(DG001a)-3 150mm
dinding batu bata (Luaran @ Bilik Kawad Cam) pada ketinggian # sofit lantai –
rasuk.
60
Appendix B 1 E
No. Description
(2)
(1)
Door Colour pattern
Fire Rated door for Bomba
Submission drawing
Item (1) and (2) as illustrated above are to be checked whether the the View is setup
using View Template, so that system family and components are represent and
coloured according Setup of View Template. For example, by using View Template, it
can filter door colour to become red when cut in plan for Bomba Submission purpose.
61
Appendix B 1 E
Floor colour for Wall cut on building PBT Wall cut pattern
PBT Submission Submission drawing
Item (1) and (2) as illustrated above are to be checked whether the the View is setup
using View Template, so that system family and components are represented and
coloured according Setup of View Template. For example, by using View Template,
Model Categories the colour of the wall can become red when cut in plan for Building
Plan Submission purpose.
62
Appendix B 1 E
No. Description
(2)
Colour Code
for Department
(1)
Department Colour
Item (1) and (2) as illustrated above are to be checked whether the the View is setup
using View Template, so that Room and Departments are represent and coloured
according Setup of View Template. For example, by using View Template, Department
for Common Areas colour are green for spatial analysis and presentation purpose.
63
Appendix C 1
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance Instance
Text General
Pengarah_Projek_jkr_sit √ √ √ √ √ Tebal_Rasuk_Struktur_
√ √ √ √
Tipikal_jkr_sil
No_FaiI_AR_jkr_sit √ √ √ √ √
Luas_Tapak_Projek_jkr_
No_Model_BIM_AR_jkr_
√ √ √ √ √ √ √ √ √
sit sia
√ √ √ √ √ Bilangan_Bilik_Darjah_jkr
Perunding_Arkitek_jkr_sit √ √ √ √
_sii
Perunding_Sivil_Struktu_
√ √ √ √ √ Luas_Lantai_Bangunan_
jkr_sit √ √ √ √
GFA_jkr_sia
Perunding_Mekanikal_
√ √ √ √ √
Elektrikal_jkr_sit Tinggi_Bangunan_jkr_sil √ √ √ √
Perunding_Juruukur_ Kaedah_Perolehan_jkr_
√ √ √ √ √ √ √ √ √
Bahan_jkr_sit sit
Komen_jkr_six √ √ √ √ √ Jarak_Grid_Tipikal_jkr_sil √ √ √ √
URL_Kemaskini_jkr_piu √ √ √ √ √ Tinggi_Siling_Tipikal_jkr_
√ √ √ √
sil
Butiran_Kemaskini_jkr_
√ √ √ √ √
six Luas_Kasar_Maksimum_
√ √ √ √
jkr_sia
Bilangan_Katil_jkr_sii √ √ √ √
Luas_Bersih_NFA_jkr_
√ √ √ √
sia
64
Appendix C 1
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance Instance
Data Tinggi_Lantai_ke_Lantai_
√ √ √ √
Tipikal_jkr_sil
MakIumat_Tanah_jkr_sit √ √ √ √ √
Luas_Menurut_Brif_jkr_
Mukim_jkr_sit √ √ √ √ √ √ √ √ √
sia
Kos_Siap_Bina_AsaI_jkr
√ √ √ √ √ Jenis_Rekabentuk_
_sic √ √ √ √
Struktur_jkr_sit
Negara_jkr_sit √ √ √ √ √
Bilangan_Pakir_
Daerah_jkr_sit √ √ √ √ √ √ √ √ √
Disediakan_jkr_sii
Kod_PTJ_jkr_sit √ √ Saiz_Rasuk_Struktur_
√ √ √ √
Kos_Tambahan_jkr_sic √ √ Tipikal_jkr_sit
Bilangan_Binaan_Luar_ Kod_DAK_Blok_jkr_sit √ √ √ √
√ √
jkr_sit
Keperluan_Bomba_jkr_
√ √ √ √
Kos_Keseluruhan_jkr_sic √ √ six
Negeri_jkr_sit √ √ √ √ √ Keperluan_PBT_jkr_six √ √ √ √
Tarikh_Penilaian_jkr_sit √ √ Keperluan_Pelanggan_
√ √ √ √
Jabatan_jkr_sit √ √ √ √ √ jkr_six
Keperluan_Rekabentuk_
Bilangan_Blok_
√ √ √ √ √ √ √ √ √
Bangunan_jkr_sii EL_jkr_six
Tarikh_Siap_Bina_jkr_sit √ √ √ √ √ Keperluan_Rekabentuk_
√ √ √ √
ME_jkr_six
Jumlah_Keluasan_
√ √ √ √ √ Keperluan_Rekabentuk_
Premis_jkr_sia √ √ √ √
ST_jkr_six
Poskod_jkr_sit √ √ √ √ √
Tahun_Siap_Bina_Asal_
√ √
jkr_sit
Status_Premis_jkr_siy √ √
No_DPA_jkr_sit √ √
Sumber_Pembiayaan_jkr
√ √ √ √ √
_sit
Catatan_jkr_sit √ √ √ √ √
Kementerian_jkr_sit √ √ √ √ √
Kategori_Premis_jkr_sit √ √ √ √ √
Nama_Premis_jkr_sit √ √ √ √ √
65
Appendix C 1
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance Instance
Jenis_Premis_jkr_sit √ √ √ √ √ Others
Alamat_Premis_jkr_sit √ √ √ √ √ Project Issue Date √ √
Kumpulan_Agensi_jkr_sit √ √ √ √ √ Project Status √ √ √ √ √
Nilai_Semasa_jkr_sic √ √ Client Name √ √ √ √ √
Aset_Warisan_jkr_siy √ √ √ √ √ Project Address √ √ √ √ √
Project Name √ √ √ √ √
Project Number √ √ √ √ √
Tarikh_Kelulusan_Bomba
√ √ √ √
_jkr_sit
Tarikh_Kelulusan_PBT_
√ √ √ √
jkr_sit
Tempoh_Kontrak_jkr_sit √ √ √ √
Tarikh_MuIa_Rekabentuk
√ √ √ √ √
_jkr_sit
Tarikh_Milik_Tapak_jkr_
√ √
sit
Tarikh_Siap_Projek_jkr_
√ √
sit
Kontraktor_Projek_jkr_sit √ √
Tarikh_Tutup_Tender_jkr
√ √
_sit
Tarikh_Tender_jkr_sit √ √
Harga_Kontrak_jkr_sic √ √
Tarikh_CMGD_jkr_sit √ √
Tarikh_CPC_jkr_sit √ √
66
Appendix C 1
Category: MATERIAL
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance Instance
Name √ √ √ √ Shading
Description √ √ √ √ Transparency √ √ √ √ √
Keywords √ √ √ √ Pattern √ √ √ √ √
Manufacturer √ √ Alignment √ √ √ √ √
Cost √ √ Pattern √ √ √ √ √
URL √ √ Color √ √ √ √ √
67
Appendix C 1
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance Instance
Information Tint
Name √ √ √ √ √ Tint Color √ √ √ √ √
Description √ √ √ √ √ Masonry
Keywords √ √ √ √ √ Type √ √ √ √ √
Generic Image √ √ √ √ √
Color √ √ √ √ √ Finish √ √ √ √ √
Image √ √ √ √ √ Plastic
Image Fade √ √ √ √ √ Type √ √ √ √ √
Glossiness √ √ √ √ √ Color √ √ √ √ √
Highlights √ √ √ √ √ Finish √ √ √ √ √
Reflectivity Wall Paint
Direct √ √ √ √ √ Color √ √ √ √ √
Oblique √ √ √ √ √ Finish √ √ √ √ √
Transparency Application √ √ √ √ √
Amount √ √ √ √ √ Metal
Image √ √ √ √ √ Type √ √ √ √ √
Image Fade √ √ √ √ √ Finish √ √ √ √ √
Translucency √ √ √ √ √ Wood
Refraction √ √ √ √ √ Image √ √ √ √ √
Cutout Stain Color √ √ √ √ √
Image √ √ √ √ √ Finish √ √ √ √ √
Self-Illumination √ √ √ √ √ Used For √ √ √ √ √
Filter Color √ √ √ √ √ Concrete
Luminance √ √ √ √ √ Color √ √ √ √ √
Color Temperature √ √ √ √ √ Sealant √ √ √ √ √
Bump
Image √ √ √ √ √
Amount √ √ √ √ √
68
Appendix C 1
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance
Instance
Glazing
Identity Data
Color √ √ √ √ √
Komen_jkr_six √ √ √ √ √
Reflectance √ √ √ √ √
Phasing
Sheets of Glass √ √ √ √ √
Butiran_APK_jkr_six √ √
Ceramic
Tarikh_Kelulusan_APK_
Type √ √ √ √ √ √ √
jkr_sit
Color √ √ √ √ √
Finish √ √ √ √ √
69
Appendix C 1
Category: AREA
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance Instance
Constraints Phasing
Level √ √ √ √ √ Butiran_APK_jkr_six √ √
Dimensions Tarikh_Kelulusan_APK_
√ √
jkr_sit
Area √ √ √ √ √
Other
Perimeter √ √ √ √ √
Dipilih_jkr_siy √ √
Identity Data
Number √ √ √ √ √
Name √ √ √ √ √
Room Style √ √ √ √ √
Comments √ √ √ √ √
Occupancy √ √ √ √ √
Department √ √ √ √ √
Komen_jkr_six √ √ √ √ √
Zon_jkr_sit √ √ √ √ √
Fungsi_jkr_sit √ √ √ √ √
Kategori_jkr_sit √ √ √ √ √
Kod_Kawasan_jkr_sit √ √ √ √ √
70
Appendix C 1
Category: ROOM
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance Instance
Constraints Electrical
Level √ √ √ √ C0101_Network_Points_
√ √ √ √
jkr_six
Upper Limit √ √ √ √
C0201_Telephone_jkr_
Limit Offset √ √ √ √ √ √ √ √
six
Base Offset √ √ √ √
C0301_Computer_jkr_six √ √ √ √
Text
C0401_PACS_
√ √ √ √
Diterima_jkr_siy √ √ √ √ Workstation_jkr_six
Kategori_jkr_sit √ √ √ √ C0501_Printers_jkr_six √ √ √ √
Bilangan_Ruang_jkr_sii √ √ √ √ C0601_Miscellaneous_jkr
√ √ √ √
_six
Zon_jkr_sit √ √ √ √
D0201_Sistem_
Gred_Jawatan_jkr_sit √ √ √ √ √ √ √ √
Pengudaraan_jkr_six
Bilangan_No_jkr_sit √ √ √ √
D0301_Puncakuasa_jkr_
√ √ √ √
Luas_Brif_jkr_sia √ √ √ √ six
Bahagian_jkr_sit √ √ √ √ D0401_Sistem_Siaraya_
√ √ √ √
jkr_six
Unit_jkr_sit √ √ √ √
D0501_Sistem_MATV_
√ √ √ √
jkr_six
D0601_Digital_Calling_
√ √ √ √
System_jkr_six
D0701_Nurse_Calling_
√ √ √ √
System_jkr_six
D0801_Audio_Visual_
√ √ √ √
System_jkr_six
D0901_CCTV_System_
√ √ √ √
jkr_six
D0902_Access_System_j
√ √ √ √
kr_six
D0903_lntercom_jkr_six √ √ √ √
D0101_Pencahayaan_jkr
√ √ √ √
_six
71
Appendix C 1
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
(Architectural) Development
Instance
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance
Identity Data
Mechanical Number √ √ √ √
B0101_Gas_Piping_jkr_ Name √ √ √ √
√ √ √ √
six Room Style √ √ √ √
B0102_Type_Of_Outlet_ Comments √ √ √ √
√ √ √ √
jkr_six
Occupancy √ √ √ √
B0201_Pencegah_
√ √ √ √ Department √ √ √ √
Kebakaran_jkr_six
Base Finish √ √ √ √
B0301_Ventilation_jkr_
√ √ √ √ Ceiling Finish √ √ √ √
six
B0302_Air_Conditioning_ Wall Finish √ √ √ √
√ √ √ √
jkr_six Floor Finish √ √ √ √
B0303_Air_Conditioning_ Occupant √ √ √ √
√ √ √ √
Usage_jkr_six
Tinggi_Siling_jkr_sil √ √ √ √
B0401_Keperluan_Air_
√ √ √ √ Label_Ruang_jkr_sit √ √ √ √
Dan_Sanitari_jkr_six
Komen_jkr_six √ √ √ √
B0501_Pneumatic_Tube
√ √ √ √ Kod_Kambi_jkr_sit √ √ √ √
_jkr_six
B0601_Special_ Sistem_Pengudaraan_jkr
√ √ √ √ √ √ √ √
Requirement_jkr_six _sit
Dimensions Kod_Ruang_jkr_stt √ √ √ √
Area √ √ √ √ √ Phasing
Perimeter √ √ √ √ √ Butiran_APK_jkr_six √ √
Category: ROOM
72
Appendix C 1
73
Appendix C 1
Category: SHEETS
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
(Architectural) Development
Instance
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance
Identity Data
Graphic Dependency √ √ √ √
Muka_Surat_jkr_sit √ √ √ √ Nota_jkr_six √ √ √ √
Category: SHEETS
74
Appendix C 1
75
Appendix C 1
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
(Architectural) Development
Instance
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance
Identity Data
Graphics Approved By √ √ √ √
Scale √ √ √ √ Designed By √ √ √ √
Text Checked By √ √ √ √
Nama_Bilik_jkr_sit √ √ √ √ Drawn By √ √ √ √
Tarikh_jkr_sit √ √ √ √ Komen_jkr_six √ √ √ √
76
Appendix C 1
77
Appendix C 1
Category: MASS
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Dimensions
Kod_Ciri_Komponen_ Mass Floors √ √ √ √ √
√ √ √ √ √
jkr_stx Gross Floor Area √ √ √ √ √
Material and Finishes Gross Surface Area √ √ √ √ √
Kod_Kemasan_jkr_stt √ √ √ √ √ Gross Volume √ √ √ √ √
Kod_Bahan_jkr_stt √ √ √ √ √ Identity Data
Bahan_jkr_stm √ √ √ √ √ Comments √ √ √ √ √
Bahan_jkr_stt √ √ √ √ √ Komen_jkr_six √ √ √ √ √
Kemasan_jkr_stt √ √ √ √ √ Visibility
Kemasan_jkr_stm √ √ √ √ √ Sembunyi_jkr_siy √ √ √ √ √
Identity Data Others
Model √ √ Dipilih_jkr_siy √ √ √ √ √
Manufacturer √ √
Type Comments √ √
Description √ √
Kod_Jenis_jkr_stt √ √
Spesifikasi_jkr_stx √ √
Jenis_Perolehan_jkr_stt √ √
OmniClass Number √ √
OmniClass Title √ √
Code Name √ √
Kod_Komponen_jkr_stt √ √
Huraian_BQ_jkr_stx √ √
Model Properties
Projek_Asal_jkr_stt √ √ √ √ √
Nota_Family_jkr_stt √ √ √ √ √
78
Appendix C 1
Category: MASS
Parameter Level of
(Architectural) Development
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_
√ √ √
jkr_stx
Nota_jkr_stx √ √ √
Visibility
Petunjuk_jkr_sty √ √ √
Other
ID_Komponen_jkr_stt √ √
79
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
80
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Panel_jkr_stm √ √ √ Data
Panel_jkr_stt √ √ √ No_Pesanan_Rasmi_
√ √
Kerajaan_jkr_sit
Permukaan Meja_jkr _stm √ √ √
Tarikh_Waranti_Tamat_
Permukaan Meja_jkr_stt √ √ √ √ √
jkr_sit
Dimensions
Kos_Perolehan_jkr_sic √ √
Depth √ √ √ √ √
Tarikh _Dipasang_jkr_sit √ √
Height √ √ √ √ √
No_Tel_Kontraktor_jkr_
√ √
Width √ √ √ √ √ sit
Identity Data No_Tel_Pembekal_jkr_sit √ √
Description √ √ √ √ Jangka_Hayat_jkr_sit √ √
Huraian_BQ_jkr_stx √ √ √ Pembekal_jkr_sit √ √
Model √ √ Kontraktor_jkr_sit √ √
Manufafacturer √ √ No_Siri_jkr_sit √ √
Kod_Komponen_Projek Alamat_Kontraktor_jkr_
√ √ √ √ √ √ √
_jkr_stt six
Kumpulan_Peralatan_jkr_ Alamat_Pembekal_jkr_
√ √ √ √ √
sti six
Spesifikasi_jkr_stx √ √ √ ID_Komponen_jkr_sit √
Kaedah_Perolehan_jkr Kod_DAK_Lokasi_jkr_sit √ √
_stt
Model Properties
Note: ID_Komponen_jkr_sit information is
No_Lukisan_Butiran_jkr_
√ √ √ required after project hand over
stt
No_Lukisan_Elektronik_jkr
√ √ √
_stt
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
jkr_stt
Projek_Asal_jkr_stt √ √ √ √
81
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
General
Nota_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Panduan_Revit_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
82
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constrains
Structure √ √ √ Level √ √ √ √ √
Kod_Jenis_jkr_stt √ √ √ Height Offset From Level √ √ √ √ √
MS1064_jkr_sty √ √ √ Room Bounding √ √ √ √ √
Komponen_IBS_jkr_sty √ √ √ Dimensions
Kod_Kedudukan_jkr_stt √ √ √ Slope √ √ √ √ √
Ruang_Berkaitan_jkr_stt √ √ √ Identity Data
Kod_Ciri_Komponen_jkr_ Komen_jkr_six √ √ √ √
√ √ √ √ √
stx
Phasing
Graphic
Butiran_APK_jkr_six √ √
Warna_Kelulusan_PBT_
√ √ √ Tarikh_Kelulusan_APK_
jkr_stt √ √
jkr_sit
Material & Finishes
Kod_Kemasan_jkr_stt √ √ √
Kod_Bahan_jkr_stt √ √ √
Bahan_jkr_stt √ √ √
Kemasan_jkr_stt √ √ √
Identity Data
Model √ √
Manufacturer √ √
Description √ √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
83
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Projek_Asal_jkr_stt √ √ √ √ No_Pesanan_Rasmi_
√ √
Kerajaan_jkr_sit
No_Lukisan_Elektronik_jkr
√ √ √
_stt Tarikh_Waranti_Tamat_
√ √
jkr_sit
No_Lukisan_Butiran_jkr_
√ √ √ Kos_Perolehan_jkr_sic √ √
stt
Nota_Family_jkr_stx √ √ √ Tarikh_Dipasang_jkr_sit √ √
Kod_Komponen_Sumber_ No_Tel_Kontraktor_jkr_
√ √ √ √ √ √ √
Jkr_stt sit
General No_Tel_Pembekal_jkr_sit √ √
Panduan_Revit_jkr_stx √ √ √ Jangka_Hayat_jkr_sit √ √
Pembekal_jkr_sit √ √
Panduan_Rekabentuk_
√ √ √
jkr_stx Kontraktor_jkr_sit √ √
Nota_jkr_stx √ √ √ Alamat_Kontraktor_jkr_
√ √
six
Data
Alamat_Pembekal_jkr_
Sub_Sistem_jkr_stt √ √ √ √
six
Kod_DAK_Komponen_ ID_Komponen_jkr_sit √
√ √
jkr_stt
Kod_DAK_Lokasi_jkr_sit √ √
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Note: ID_Komponen_jkr_sit information is
Kaedah_Pemasangan_ required after project hand over.
√ √
jkr_stt
Visibility
Petunjuk_jkr_sty √ √ √
84
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constrains
Komponen_IBS_jkr_sty √ √ √ Base Level √ √ √
Kod_Jenis_jkr_stt √ √ √ Top Level √ √ √
MS_1064_jkr_sty √ √ √ Room Bounding √ √ √
Kod_Ciri_Komponen_jkr_ Identity Data
√ √ √ √ √
stx
Komen_jkr_six √ √ √
Graphic
Phasing
Warna_Kelulusan_PBT_
√ √ √ Butiran_APK_jkr_six √ √
jkr_stt
Tarikh_Kelulusan_APK_
Material & Finishes √ √
jkr_sit
Kod_Kemasan_jkr_stt √ √ √
Data
Kod_Bahan_jkr_stt √ √ √
No_Pesanan_Rasmi_
√ √
Bahan_jkr_stm √ √ √ Kerajaan_jkr_sit
Bahan_jkr_stt √ √ √ Tarikh_Waranti_Tamat_
√ √
jkr_sit
Kemasan_jkr_stt √ √ √
Kos_Perolehan_jkr_sic √ √
Kemasan_jkr_stm √ √ √
Tarikh _Dipasang_jkr_sit √ √
Dimensions
No_Tel_Kontraktor_jkr_
Depth √ √ √ √ √
sit
Width √ √ √
No_Tel_Pembekal_jkr_
√ √
Identity Data sit
Model √ √ Jangka_Hayat_jkr_sit √ √
Manufacturer √ √ Pembekal_jkr_sit √ √
Description √ √ √ √ Kontraktor_jkr_sit √ √
Kod_Komponen_Projek_ Alamat_Kontraktor_jkr_
√ √ √ √ √ √ √
jkr_stt six
Spesifikasi_jkr_stx √ √ √ Alamat_Pembekal_jkr_
√ √
six
Huraian_BQ_jkr_stx √ √ √
ID_Komponen_jkr_sit √
Kod_DAK_Lokasi_jkr_sit √ √
85
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Model Properties
Projek_Asal_jkr_stt √ √ √ √
No_Lukisan_Elektronik_jkr
√ √ √
_stt
No_Lukisan_Butiran_jkr_
√ √ √
stt
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
jkr_stt
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
86
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constraints
Function √ √ √ Level √ √ √
Kekisi_jkr_sty √ √ √ √ Construction
Kod_Ciri_Komponen _jkr_ Kumpulan_Ironmongery_
√ √ √ √ √ √ √ √
stx jkr_sii
Kod_Kedudukan_jkr_stt √ √ √ Ironmongery_jkr_six √ √ √
Kod_Kekisi_jkr_stt √ √ √ Identity Data
Kekisi_jkr_stt √ √ √ Komen_jkr_six √ √ √
Kod_Rekabentuk_jkr_stt √ √ √ Phasing
Kod_Saiz_jkr_stt √ √ √ Tarikh_Kelulusan_APK_
√ √
jkr_sit
Komponen_Bomba_jkr_
√ √ √
sty Butiran_APK_jkr_six √ √
Kod_Jenis_jkr_stt √ √ √
MS1064_jkr_sty √ √ √
Ruang_Berkaitan_jkr_stt √ √ √
Graphic
Warna_Kelulusan_PBT_
√ √ √
jkr_stt
87
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Type
Huraian_BQ_jkr_stx √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
88
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Model Properties
No_Lukisan_Butiran_jkr_
√ √ √
stt
No_Lukisan_Elektronik_jkr
√ √ √
_stt
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
jkr_stt
Projek_Asal_jkr_stt √ √ √
General
Nota_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Panduan_Revit_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
89
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
90
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
91
Appendix C 2
Family Category: FIRE ALARM DEVICES Family Category: FIRE ALARM DEVICES
Parameter Level of Parameter Level of
(Architectural) Development (Architectural) Development
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
92
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constrains
Structure √ √ √ √ Level √ √ √ √ √
Function √ √ √ Height Offset From Level √ √ √ √ √
Komponen_IBS_jkr_sty √ √ √ Room Bounding √ √ √ √ √
Kod_Jenis_jkr_stt √ √ √ Graphics
MS1064_jkr_sty √ √ √ Warna_Kelulusan_PBT_
√ √ √
jkr_sit
Kod_Kedudukan_jkr_stt √ √ √
Dimensions
Ruang_Berkaitan_jkr_stt √ √ √
Slope √ √ √
Kod_Ciri_Komponen_jkr_
√ √ √ √ √
stx Identity Data
Material & Finishes Komen_jkr_six √ √ √ √
Kod_Kemasan_jkr_stt √ √ √ Phasing
Kod_Bahan_jkr_stt √ √ √ Butiran_APK_jkr_six √ √
Bahan_jkr_stt √ √ √ Tarikh_Kelulusan_APK_jkr
√ √
_sit
Kemasan_jkr_stt √ √ √
Other
Kemasan_Bawah_jkr_stt √ √ √
Warna_Aras_jkr_sit √ √ √ √
Kod_Kemasan_Bawah_jkr
√ √ √
_stt
Lapisan_Kalis_Air_jkr_stx √ √ √
Lapisan_Kalis_Air_jkr_sty √ √ √ √
Identity Data
Model √ √
Manufacturer √ √
Description √ √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
93
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
94
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
95
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
96
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Identity Data
Model √ √
Manufacturer √ √
Description √ √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
Kumpulan_Peralatan_jkr_
√ √ √
sti
Kaedah_Perolehan_jkr_stt √ √ √
Model Properties
Projek_Asal_jkr_stt √ √ √
No_Lukisan_Butiran_jkr_
√ √ √
stt
No_Lukisan_Elektronik_jkr
√ √ √
_stt
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
jkr_stt
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Visibility
Petunjuk_jkr_sty √ √ √
97
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
98
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
99
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Identity Data
Model √ √
Manufacturer √ √
Description √ √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
Kumpulan_Peralatan_jkr_
√ √ √
sti
Kaedah_Perolehan_jkr_stt √ √ √
Model Properties
No_Lukisan_Butiran_jkr_
√ √ √
stt
No_Lukisan_Elektronik_jkr
√ √ √
_stt
Nota_Family_jkr_stx √ √ √
Projek_Asal_jkr_stt √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
jkr_stt
General
Nota_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Panduan_Revit_jkr_stx √ √ √
100
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
101
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
102
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Identity Data
Model √ √
Manufacturer √ √
Description √ √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
Kumpulan_Peralatan_jkr_
√ √ √
sti
Kaedah_Perolehan_jkr_stt √ √ √
Model Properties
No_Lukisan_Butiran_jkr_
√ √ √
stt
No_Lukisan_Elektronik_jkr
√ √ √
_stt
Nota_Family_jkr_stx √ √ √
Projek_Asal_jkr_stt √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
General
Nota_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Panduan_Revit_jkr_stx √ √ √
103
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
104
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
105
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
General
Nota_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Panduan_Revit_jkr_stx √ √ √
Visibility
Petunjuk_jkr_sty √ √ √
106
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
107
Appendix C 2
108
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
109
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
General
Nota_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Panduan_Revit_jkr_stx √ √ √
Visibility
Petunjuk_jkr_sty √ √ √
110
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
111
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
112
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
113
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Model Properties
Projek_Asal_jkr_stt √ √ √
No_Lukisan_Elektronik_jkr
√ √ √
_stt
No_Lukisan_Butiran_jkr_
√ √ √
stt
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
114
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constraints
Thickness √ √ √ Base Level √ √ √ √ √
Function √ √ √ Top Level √ √ √ √ √
Komponen_IBS_jkr_sty √ √ √ Multistory Top Level √ √ √ √ √
Kod_Jenis_jkr_stt √ √ √ Dimensions
MS1064_jkr_sty √ √ √ Width √ √ √ √ √
Kod_Kedudukan_jkr_stt √ √ √ Identity Data
Kod_Ciri_Komponen_jkr_ Komen_jkr_six √ √ √
√ √ √ √ √
stx
Phasing
Graphic
Butiran_APK_jkr_six √ √
Warna_Kelulusan_PBT_
√ √ √ Tarikh_Kelulusan_APK_jkr
jkr_stt √ √
_sit
Material & Finishes
Data
Ramp Material √ √ √
No_Pesanan_Rasmi_
√ √
Kod_Kemasan_jkr_stt √ √ √ Kerajaan_jkr_sit
Kod_Bahan_jkr_stt √ √ √ Tarikh_Waranti_Tamat_jkr
√ √
_sit
Bahan_jkr_stt √ √ √
Kos_Perolehan_jkr_sic √ √
Kemasan_jkr_stt √ √ √
Tarikh_Dipasang_jkr_sit √ √
Identity Data
No_Tel_Kontraktor_jkr_sit √ √
Model √ √ √
No_Tel_Pembekal_jkr_sit √ √
Manufacturer √ √ √
Jangka_Hayat_jkr_sit √ √
Description √ √ √ √
Pembekal_jkr_sit √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt Kontraktor_jkr_sit √ √
Spesifikasi_jkr_stx √ √ √ Alamat_Kontraktor_jkr_six √ √
Huraian_BQ_jkr_stx √ √ √ Alamat_Pembekal_jkr_six √ √
ID_Komponen_jkr_stt √
Kod_DAK_Lokasi_jkr_sit √ √
115
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Model Properties
Projek_Asal_jkr_stt √ √ √
No_Lukisan_Elektronik_jkr
√ √ √
_stt
No_Lukisan_Butiran_jkr_
√ √ √
stt
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
116
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Dimensions
Structure √ √ √ √ Slope √ √ √ √ √
Komponen_IBS_jkr_sty √ √ √ Identity Data
Kod_Jenis_jkr_stt √ √ √ Komen_jkr_six √ √ √ √
Kod_Rekabentuk_jkr_stt √ √ √ Phasing
Kod_Ciri_Komponen_jkr_ Butiran_APK_jkr_six √ √
√ √ √ √ √
stx
Tarikh_Kelulusan_APK_
√ √
Graphic jkr_sit
Warna_Kelulusan_PBT_ Data
√ √ √
jkr_stt
No_Pesanan_Rasmi_
√ √
Material & Finishes Kerajaan_jkr_sit
Kod_Kemasan_jkr_stt √ √ √ Tarikh_Waranti_Tamat_
√ √
jkr_sit
Kod_Bahan_jkr_stt √ √ √
Kos_Perolehan_jkr_sic √ √
Bahan_jkr_stt √ √ √
Tarikh_Dipasang_jkr_sit √ √
Kemasan_jkr_stt √ √ √
No_Tel_Kontraktor_jkr_ sit √ √
Lapisan_Kalis_Air_jkr_stx √ √ √
No_Tel_Pembekal_jkr_sit √ √
Lapisan_Kalis_Air_jkr_sty √ √ √ √
Jangka_Hayat_jkr_sit √ √
Identity Data
Pembekal_jkr_sit √ √
Model √ √
Kontraktor_jkr_sit √ √
Manufacturer √ √
Alamat_Kontraktor_jkr_
Description √ √ √ √ √ √
six
Kod_Komponen_Projek_
√ √ √ √ √ Alamat_Pembekal_jkr_ six √ √
jkr_stt
ID_Komponen_jkr_sit √
Spesifikasi_jkr_stx √ √ √
Kod_DAK_Lokasi_jkr_sit √ √
Huraian_BQ_jkr_stx √ √ √
117
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Model Properties
Projek_Asal_jkr_stt √ √ √
No_Lukisan_Elektronik_
√ √ √
jkr_stt
No_Lukisan_Butiran_jkr_
√ √ √
stt
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
118
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Instance
Constraints
Base Constraint √ √ √
Top Constraint √ √ √
Construction
Kod_Ciri_Komponen_jkr_
√ √ √ √ √
six
Identity Data
Komen_jkr_six √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_sit
Phasing
Butiran_APK_jkr_six √ √
Tarikh_Kelulusan_APK_jkr
√ √
_sit
119
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
120
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Identity Data
Model √ √
Manufacture √ √
Description √ √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
Kumpulan_Peralatan_jkr_
√ √ √
sti
Kaedah_Perolehan_jkr_stt √ √ √
Model Properties
Projek_Asal_jkr_stt √ √ √
No_Lukisan_Elektronik_
√ √ √
jkr_stt
No_Lukisan_Butiran_jkr_
√ √ √
stt
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
General
Panduan_Rekabentuk_jkr
√ √ √
_stx
Panduan_Revit_jkr_stx √ √ √
Nota_jkr_stx √ √ √
Visibility
Petunjuk_jkr_sty √ √ √
121
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
122
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
123
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Dimensions Data
Panjang_jkr_stl √ √ √ √ √ No_Pesanan_Rasmi_
√ √
Kerajaan_jkr_sit
Lebar_jkr_stl √ √ √ √ √
Tarikh_Waranti_Tamat_
Tinggi_jkr_stl √ √ √ √ √ √ √
jkr_sit
Identity Data
Kos_Perolehan_jkr_sic √ √
Model √ √
Tarikh_Dipasang_jkr_sit √ √
Manufacturer √ √
No_Tel_Kontraktor_jkr_
√ √
Description √ √ √ √ sit
Kod_Komponen_Projek No_Tel_Pembekal_jkr_sit √ √
√ √ √ √ √
_jkr_stt Jangka_Hayat_jkr_sit √ √
Spesifikasi_jkr_stx √ √ √ Pembekal_jkr_sit √ √
Huraian_BQ_jkr_stx √ √ √ Kontraktor_jkr_sit √ √
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √ Note: Data Information required related to floor
Jkr_stt finishes.
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
124
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
125
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constrains
Komponen_IBS_jkr_sty √ √ √ Base Level √ √ √
Kod_Jenis_jkr_stt √ √ √ Top Level √ √ √
MS1064_jkr_sty √ √ √ Column Style √ √ √
Kod_Ciri_Komponen_jkr_ Identity Data
√ √ √ √ √
stx
Komen_jkr_six √ √ √
Graphic
Phasing
Warna_Kelulusan_PBT_
√ √ √ Butiran_APK_jkr_six √ √
jkr_stt
Tarikh_Kelulusan_APK_
Material & Finishes √ √
jkr_sit
Kod_Kemasan_jkr_stt √ √ √
Kod_DAK_Lokasi_jkr_sit √ √
Kod_Bahan_jkr_stt √ √ √
Bahan_jkr_stm √ √ √
Bahan_jkr_stt √ √ √
Kemasan_jkr_stt √ √ √
Kemasan_jkr_stm √ √ √
Dimensions
b √ √ √ √ √
h √ √ √ √ √
Identity Data
Description √ √ √ √
Model √ √
Manufacturer √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
126
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
General No_Tel_Pembekal_jkr_sit √ √
Panduan_Revit_jkr_stx √ √ √ Jangka_Hayat_jkr_sit √ √
Panduan_Rekabentuk_jkr Pembekal_jkr_sit √ √
√ √ √
_stx
Kontraktor_jkr_sit √ √
Nota_jkr_stx √ √ √
Alamat_Kontraktor_jkr_
√ √
Data six
Sub_Sistem_jkr_stt √ √ Alamat_Pembekal_jkr_
√ √
six
Kod_DAK_Komponen_jkr
√ √
_stt ID_Komponen_jkr_sit √
Sistem_jkr_stt √ √ Kod_DAK_Lokasi_jkr_sit √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √ Note: Data Information is required for finishes
_stt and when using Decorative Column that does
Visibility not involve structural analysis.
127
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constrains
Komponen_IBS_jkr_sty √ √ √ Start Offset Level √ √ √ √ √
Kod_Jenis_jkr_stt √ √ √ End Offset Level √ √ √ √ √
MS1064_jkr_stt √ √ √ Identity Data
Kod_Ciri_Komponen_jkr_ Komen_jkr_six √ √ √
√ √ √ √ √
stx
Phasing
Graphic
Butiran_APK_jkr_six √ √
Warna_Kelulusan_PBT_
√ √ √ Tarikh_Kelulusan_APK_
jkr_stt √ √
jkr_sit
Material & Finishes
Data
Kod_Kemasan_jkr_stt √ √ √
No_Pesanan_Rasmi_
√ √
Kod_Bahan_jkr_stt √ √ √ Kerajaan_jkr_sit
Bahan_jkr_stm √ √ √ Tarikh_Waranti_Tamat_
√ √
jkr_sit
Bahan_jkr_stt √ √ √
Kos_Perolehan_jkr_sic √ √
Kemasan_jkr_stt √ √ √
Tarikh_Dipasang_jkr_sit √ √
Kemasan_jkr_stm √ √ √
No_Tel_Kontraktor_jkr_ sit √ √
Dimension
No_Tel_Pembekal_jkr_sit √ √
b √ √ √ √ √
Jangka_Hayat_jkr_sit √ √
h √ √ √ √ √
Pembekal_jkr_sit √ √
Identity Data
Kontraktor_jkr_sit √ √
Description √ √ √ √
Alamat_Kontraktor_jkr_
Model √ √ √ √
six
Manufacturer √ √
Alamat_Pembekal_jkr_ six √ √
Kod_Komponen_Projek_
√ √ √ √ √ ID_Komponen_jkr_sit √
jkr_stt
Kod_DAK_Lokasi_jkr_sit √ √
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
128
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Model Properties
Projek_Asal_jkr_stt √ √ √
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
129
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constrains
Komponen_IBS_jkr_sty √ √ √ Offset √ √ √
Kod_Jenis_jkr_stt √ √ √ Workplane √ √ √
Kod_Ciri_Komponen_jkr_ Identity Data
√ √ √ √ √
stx
Komen_jkr_six √ √ √
Material & Finishes
Phasing
Kod_Bahan_jkr_stt √ √ √
Butiran_APK_jkr_six √ √
Bahan_jkr_stm √ √ √
Tarikh_Kelulusan_APK_jkr
√ √
Bahan_jkr_stt √ √ √ _sit
Dimensions
Panjang_jkr_stl √ √ √ √ √
Lebar_jkr_stl √ √ √ √ √
Tinggi_jkr_stl √ √ √ √ √
Identity Data
Description √ √ √ √
Kod_Komponen_Projek_
√ √ √ √ √
jkr_stt
Spesifikasi_jkr_stx √ √ √
Huraian_BQ_jkr_stx √ √ √
Model Properties
Projek_Asal_jkr_stt √ √ √
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
130
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Visibility
Petunjuk_jkr_sty √ √ √
131
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constrains
Komponen_IBS_jkr_sty √ √ √ Start Level Offset √ √ √ √ √
Kod_Jenis_jkr_stt √ √ √ End Level Offset √ √ √ √ √
Kod_Ciri_Komponen_jkr_ Dimension
√ √ √ √ √
stx
Truss Height √ √ √ √ √
Material & Finishes
Identity Data
Kod_Kemasan_jkr_stt √ √ √
Komen_jkr_six √ √ √
Kod_Bahan_jkr_stt √ √ √
Phasing
Bahan_jkr_stm √ √ √
Butiran_APK_jkr_six √ √
Bahan_jkr_stt √ √ √
Tarikh_Kelulusan_APK_jkr
√ √
Kemasan_jkr_stt √ √ √ _sit
Kemasan_jkr_stm √ √ √ Data
Dimension No_Pesanan_Rasmi_
√ √
Kerajaan_jkr_sit
b √ √ √ √ √
Tarikh_Waranti_Tamat_jkr
h √ √ √ √ √ √ √
_sit
Identity Data
Kos_Perolehan_jkr_sic √ √
Description √ √ √ √
Tarikh_Dipasang_jkr_sit √ √
Model √ √
No_Tel_Kontraktor_jkr_sit √ √
Manufacturer √ √
No_Tel_Pembekal_jkr_sit √ √
Kod_Komponen_Projek_
√ √ √ √ √ Jangka_Hayat_jkr_sit √ √
jkr_stt
Pembekal_jkr_sit √ √
Spesifikasi_jkr_stx √ √ √
Kontraktor_jkr_sit √ √
Huraian_BQ_jkr_stx √ √ √
Alamat_Kontraktor_jkr_six √ √
Alamat_Pembekal_jkr_six √ √
ID_Komponen_jkr_sit √
Kod_DAK_Lokasi_jkr_sit √ √
132
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Model Properties
Projek_Asal_jkr_stt √ √ √
Nota_Family_jkr_stx √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
133
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constrains
Structure √ √ √ Location Line √ √ √ √
Function √ √ √ Base Constrain √ √ √ √
Komponen_Bomba_jkr_ Base Offset √ √ √ √
√ √ √
sty
Top Constraint √ √ √ √
Komponen_IBS_jkr_sty √ √ √
Top Offset √ √ √ √
Kod_Jenis_jkr_stt √ √ √
Room Bounding √ √ √ √
MS1064_jkr_sty √ √ √
Graphics
Kod_Tinggi_jkr_stt √ √ √
Warna_Kelulusan_PBT_
√ √ √ √
Kod_Kedudukan_jkr_stt √ √ √ sit
Ruang_Berkaitan_jkr_stt √ √ √ Identity Data
Kod_Ciri_Komponen_jkr_ Komen_jkr_six √ √ √ √
√ √ √ √ √
stx
Phasing
Material & Finishes
Tarikh_Kelulusan_APK_jkr
√ √
Kod_Bahan_jkr_stt √ √ √ _sit
Kod_Kemasan_Luar_jkr_ Butiran_APK_jkr_six √ √
√ √ √
stt
Kod_Kemasan_Dalam_jkr
√ √ √
_stt
Bahan_jkr_stt √ √ √
Kemasan_Dalam_jkr_stt √ √ √
Kemasan_Luar_jkr_stt √ √ √
Lapisan_Kalis_Air_jkr_stx √ √ √
Lapisan_Kalis_Air_jkr_sty √ √ √ √
134
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
135
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
136
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
Construction Constraints
Wall Closure √ √ √ Level √ √ √ √
Kod_Jenis_jkr_stt √ √ √ Sill Height √ √ √ √
Kod_Rekabentuk_jkr_stt √ √ √ Construction
Kod_Kekisi_jkr_stt √ √ √ Kumpulan_Ironmongery_
√ √ √
jkr_sii
Kekisi_jkr_stt √ √ √
Ironmongery_jkr_six √ √ √
Kekisi_jkr_sty √ √ √ √
Identity Data
MS1064_jkr_sty √ √ √
Komen_jkr_six √ √ √
Kod_Saiz_jkr_stt √ √ √
Phasing
Kod_Tinggi_jkr_stt √ √ √
Tarikh_Kelulusan_APK_jkr
Kod_Kedudukan_jkr_stt √ √ √ √ √
_sit
Ruang_Berkaitan_jkr_stt √ √ √
Butiran_APK_jkr_six √ √
Kod_Ciri_Komponen_jkr_
√ √ √ √ √
stx
Graphic
Warna_Kelulusan_PBT_
√ √ √
jkr_stt
137
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type Instance
138
Appendix C 2
LOD 100
LOD 200
LOD 300
LOD 400
LOD 500
Type
Model Properties
No_Lukisan_Butiran_jkr_
√ √ √
stt
No_Lukisan_Elektronik_jkr
√ √ √
_stt
Nota_Family_jkr_stx √ √ √
Projek_Asal_jkr_stt √ √ √
Kod_Komponen_Sumber_
√ √ √ √ √
Jkr_stt
General
Panduan_Revit_jkr_stx √ √ √
Panduan_Rekabentuk_jkr
√ √ √
_stx
Nota_jkr_stx √ √ √
Data
Sub_Sistem_jkr_stt √ √
Kod_DAK_Komponen_jkr
√ √
_stt
Sistem_jkr_stt √ √
Jenama_jkr_stt √ √
Kaedah_Pemasangan_jkr
√ √
_stt
Visibility
Petunjuk_jkr_sty √ √ √
Others
Default Sill Height √ √ √
139
Appendix D 1
CLASH
NO CLASH TEST CATEGORY
HARD SOFT
ARCHITECTURAL Vs. STRUCTURAL
1 Ceilings vs. Structural Columns /
140
Appendix D 1
CLASH
NO CLASH TEST CATEGORY
HARD SOFT
29 Caseworks vs. Structural Framings /
Mechanical Equipment
27 Ceiling vs. /
(Indoor unit)
141
Appendix D 1
CLASH
NO CLASH TEST CATEGORY
HARD SOFT
Mechanical Equipment
29 Curtains vs. /
(Outdoor unit)
30 Curtains vs. Sprinklers /
31 Walls vs. Air Terminal (Supply) /
32 Walls vs. Mechanical Equipment (AHU) /
Mechanical Equipment
33 Walls vs. /
(Outdoor unit)
34 Walls vs. Sprinklers /
35 Windows vs. Air Terminal (Supply) /
36 Windows vs. Sprinklers /
Mechanical Equipment
37 Windows vs. /
(Outdoor unit)
142
Appendix D 1
CLASH
NO CLASH TEST CATEGORY
HARD SOFT
20 Doors vs. Electrical Fixtures /
21 Doors vs. Fire Alarm Devices /
22 Doors vs. Lighting Devices /
23 Doors vs. Lighting Fixtures /
24 Doors vs. Nurse Call Devices /
25 Doors vs. Security Devices /
26 Doors vs. Telephone Devices /
27 Pipes (RWDP) vs. Electrical Fixtures /
28 Pipes (RWDP) vs. Lighting Fixtures /
29 Pipes (RWDP) vs. Security Devices /
30 Windows vs. Communication Devices /
31 Windows vs. Data Devices /
32 Windows vs. Electrical Equipment /
33 Windows vs. Electrical Fixtures /
34 Windows vs. Fire Alarm Devices /
35 Windows vs. Lighting Devices /
36 Windows vs. Lighting Fixtures /
37 Windows vs. Nurse Call Devices /
38 Windows vs. Security Devices /
39 Windows vs. Telephone Devices /
40 Ceilings vs. Cable Trays /
41 Ceilings vs. Electrical Fixtures /
42 Ceilings vs. Conduits /
43 Caseworks vs. Lighting Fixtures (Lighting) /
44 Caseworks vs. Lighting Fixtures (Fan) /
45 Caseworks vs. Lighting Fixtures (Wall Fan) /
46 Doors vs. Electrical Equipment /
47 Floors vs. Electrical Fixtures (Socket) /
Electrical Equipment
48 Walls vs. /
(Floor Standing Switch Board)
143
Appendix D 1
CLASH
NO CLASH TEST CATEGORY
HARD SOFT
2 Floors vs. Pipes /
3 Structural Columns vs. Ducts /
4 Structural Columns vs. Pipes /
5 Structural Columns vs. Sprinkler /
6 Structural Foundations vs. Pipes /
7 Structural Framings vs. Ducts /
8 Structural Framings vs. Mechanical Equipment /
9 Structural Framings vs. Pipes /
10 Structural Framings vs. Sprinkler /
11 Wall (Structural) vs. Air terminals /
12 Wall (Structural) vs. Ducts /
13 Wall (Structural) vs. Pipes /
14 Structural Trusses vs. Ducts /
15 Structural Trusses vs. Mechanical Equipment /
16 Structural Trusses vs. Pipes /
Mechanical Equipment
17 Floors (Upper floor) vs. /
(Tank)
Mechanical Equipment
18 Structural Columns vs. /
(AHU)
Mechanical Equipment
19 Walls (Structural) vs. /
(AHU)
Mechanical Equipment
20 Walls (Structural) vs. /
(Lifts)
144
Appendix D 1
CLASH
NO CLASH TEST CATEGORY
HARD SOFT
9 Structural Trusses vs. Conduit /
10 Wall (Structural) vs. Conduit /
11 Structural Framings vs. Cable Tray /
12 Structural Framings vs. Lighting Fixtures (Fans) /
Electrical Equipment
13 Walls (Structural) vs. /
(Floor Standing Switch Board)
14 Structural Framings vs. Conduit /
145
Appendix D 1
CLASH
NO CLASH TEST CATEGORY
HARD SOFT
24 Fire Alarm Devices vs. Lighting Devices /
25 Mechanical Equipment vs. Communication Devices /
26 Mechanical Equipment vs. Data Devices /
27 Mechanical Equipment vs. Electrical Equipment /
28 Mechanical Equipment vs. Electrical Fixtures /
29 Mechanical Equipment vs. Lighting Devices /
30 Mechanical Equipment vs. Telephone Devices /
31 Pipes vs. Communication Devices /
32 Pipes vs. Data Devices /
33 Pipes vs. Electrical Equipment /
34 Pipes vs. Electrical Fixtures /
35 Pipes vs. Lighting Devices /
36 Pipes vs. Lighting Fixtures /
37 Pipes vs. Telephone Devices /
38 Ducts vs. Conduit /
39 Pipes vs. Conduit /
40 Mechanical Equipment vs. Conduit /
41 Fire Alarm Devices vs. Conduit /
42 Sprinklers vs. Conduit /
43 Ducts vs. Cable Trays /
44 Mechanical Equipment vs. Lighting Fixtures /
45 Sprinklers vs. Communications Devices /
46 Sprinklers vs. Lighting Fixtures /
47 Sprinklers vs. Security Devices /
146