0013 0013 0013 0013 0014 0014 0014 No liability shall be accepted for its unauthorised use.

N
Notes:

DC 1 DC 2 DC 3 DC 4 DC 5 1. Unless shown otherwise or indicated in the Specification,


whichever is the more onerous, dimensional tolerance is
1 to be in accordance with Tables 1 and 2 of BS 5606.
VL628 Piles 2. All dimensions are in millimetres (mm) unless noted
282 36 37 45 46 62 63 80 81 otherwise. DO NOT SCALE FROM THIS DRAWING, USE
FIGURED DIMENSIONS ONLY.

3. This drawing is to be read in conjunction with the


Specification and any Specialist drawings.
1
4. Refer also to:
DC 1

Drawing numbers: 55-19007-DR-0011, 0012, 0013 &


0014.

DC 5
5. UNLESS THE REVISION OF THIS DRAWING IS
DENOTED BY THE PREFIX C THEN THIS DRAWING IS
NOT FOR CONSTRUCTION.

6. Crucial material characteristics are as follows:


Sheet pile minimum grade S390
233 232 224 223 207 206 189 188
7. Unless noted otherwise, all steelwork is to be execution
class EXC2.
2 DC 1 DC 2 DC 3 DC 4 DC 5

IF IN DOUBT ASK

General Arrangement - Plan


Scale 1:125

DC 1 DC 2 DC 3 DC 4 DC 5

Level of temporary Top level of sheet piles in 17.04m


Existing Ground Level props 17.30m the temporary condition
16.69m
17.70m 17.70m 16.34m

Temporary excavation 15.99m


level 15.50m Temporary excavation
level 14.50m Temporary excavation
level 14.00m

C01 12.02.20 Issued for construction MB GRM MG


13.845m Top of pile level revised on
13.425m P04 20.12.19 Elevation 2-2. Capping detail MB GRM MG
13.005m added.
12.585m
12.165m P03 29.11.19 Updated to suit comments MB GRM MG
Proposed slab P02 22.10.19 Sheet pile type changed MB - MG

9.30m P01 03.10.19 Preliminary issue MB - MG


Issue Date Description Drawn Des. Chkd.
Issue codes:-
F : Feasibility T : Tender P: Preliminary C : Construction AB : As built
8.80m Drawing
8.00m
7.65m
status
FOR CONSTRUCTION
Elevation 1-1
Scale 1:125 Extent of capping beam

Level of temporary Top level of sheet piles in 17.04m


props 17.30m the temporary condition
16.69m
17.70m 17.70m 16.34m PARTNERS

Temporary excavation 15.99m


level 15.50m Temporary excavation
level 14.50m Temporary excavation
level 14.00m

SPONSORS

Proposed slab
100 on Original - A1

9.30m
UNLOCKING THE SEVERN FOR LIFE
LIFE 15 NAT UK 000219/H6-15-04573
ACTION A.1 PREPARE CIVIL ENGINEERING DRAWINGS FOR FISH PASSAGE
IMPROVEMENTS.

8.80m
8.00m
7.65m KIER PROFESSIONAL SERVICES
Elevation 2-2
FS 653123

Safety, Health and Environment Information.


Scale 1:125
Notes below are additional to hazard/risks normally
Kier Professional Services Limited
associated with this type of work: Kier Duplex, Ayton Rd, Wymondham, Norfolk NR18 0QH
Construction Tel : 01953 609 899
Ci. Piling & crane platform to be designed by suitable www.kier.co.uk professional.services@kier.co.uk
qualified person. Client
Cii. Working behind cofferdam water levels rise faster than
anticipated.
Ciii. Unknown stability of existing weir.
CANAL & RIVER TRUST
Civ. Extent of existing weir unknown.
Cv. Bank may be undermined due to river bank erosion. Contract
Pile Information Construction Sequence: Cvi. Propping to be designed by competent person.
Cvii. Deflection to be measured during construction. KPS to
advise.
Toe Level Temporary Prop Pile Cut Off
Design Case Pile No. No. of piles Design Case Pile Type
(m AOD) Loading ULS (kN/m) Level (m AOD)
Pile Length (m) Corner Pieces 1. Reduce level and install piling platform. Cviii. Excavating between / under props. Safe system of work
to be implemented.
LINCOMB FISH PASS
2. Install piles to toe level indicated in pile information table. Cx. Excavation level to be monitored to avoid over
1 No. Omega excavation.
DC 1 1 to 36 & 233 to 282 86 DC 1 VL628 9.30 150 17.70 8.40
3 No. E20 3. Excavate to temporary excavation level, see elevation. Operations
DC 2 36 to 45 & 224 to 232 18 DC 2 VL628 9.30 150 17.70 8.40 - Oi. Title
4. Install temporary waling and propping system, at elevation 17.30m A.O.D, for Maintenance
DC 3 46 to 62 & 207 to 223 34 DC 3 VL628 8.80 200 17.70 8.90 - loadings as indicated in table. The propping system is to be designed by others. Mi. De-watering needs to be mantained during works.
DC 4 63 to 80 & 189 to 206 36 DC 4 VL628 8.00 200 17.70 9.70 - Dismantling/Demolition (future)
1 No. Omega
5. Excavate to underside of slab +75mm blinding, see elevation. Di. Slab to be cured 28 days prior to removal of temporary
props.
PILING LAYOUT
DC 5 81 to 188 108 DC 5 VL628 7.65 200 17.70 10.05 3 No. E20 6. Install base slab, allow 28 days curing for slab prior to prop removal.
2 No. L90
These notes are based on the use of experienced and
competent contractors carrying out the work using an
approved safe method of working. Scale (A1)
The Temporary Works Coordinator (or other suitably As shown
competent person) is responsible for the implementation of Drawing No. Issue
these works on site and notifying the designer of any
changes. 55-19007-DR-0010 C 01
100 on Original - A1 Plotted by: brooks, mark 12/02/2020 13:16:34 File reference: 55-19007-DR-0010 C01 - Sheet Pile Layout.dwg