Project: MANGO TREE RESIDENCES

Date: MAY 11, 2020


Subject: QUANTITY TAKE OFF FOR WHEEL STOPS (EAST & WEST TOWER)

QUANTITY
ITEM DESCRIPTION UNIT TOTAL
2nd FLOOR (PODIUM 3rd FLOOR (PODIUM PARKING) 6th FLOOR (PODIUM
PARKING) PARKING)

1 WEST TOWER

1.1 Typical Precast Concrete Wheel Stop per panel 11 11 15 37

1.2 Handicap Precast Concrete Wheel Stop per panel 0 0 1 1

2 EAST TOWER

2.1 Typical Precast Concrete Wheel Stop per panel 32 32 32 96

2.2 Handicap Precast Concrete Wheel Stop per panel 0 0 0 0

Prepared by:

ENGR. JOHN MICHAEL A. MANTALABA


SITE ENGINEER-OPERATIONS
2ND FLOOR (PODIUM PARKING)(TOTAL OF 11 WHEEL STOPS)
3RD FLOOR (PODIUM PARKING)(TOTAL OF 11 WHEEL STOPS)
6TH FLOOR (PODIUM PARKING)(TOTAL OF 16 WHEEL STOPS)
2ND FLOOR (PODIUM PARKING)(TOTAL OF 32 WHEEL STOPS)
3RD FLOOR (PODIUM PARKING)(TOTAL OF 32 WHEEL STOPS)
6TH FLOOR (PODIUM PARKING)(TOTAL OF 32 WHEEL STOPS)