Professional Documents
Culture Documents
Drew3 System
Date: Customer: Contact and Phone: Ser#:
1) Preparation Comments
_____ Ensure customer has current Calibrator
_____ O-ring Kit – FRU-9318-034
_____ Tubing – FRU-9318-066
_____ D3 Service spares and tools
2) System Review
_____ Error Logs (include report)
_____ System Logs (include report for last 60 days)
_____ QC Results Logs (include report)
_____ Datalog Review (review patient H&H’s with Indices)
_____ Backgrounds (include report)
_____ Calibration Review (include report)
_____ Reagents Log Current Lot# _____ (include report)
3) Maintenance
_____ Needle dismantling and O-ring replacement
_____ Rinse Block Servicing
_____ Syringe module Dismantling and O-ring replacement
_____ Baths/Apertures Dismantling and O-ring replacement
_____ Bleach apertures (20%, 20 minutes)
_____ Count pathway tubing replacement (tubes 17, 19, 20)
_____ Examine and Replace Diluent Filter
_____ Ensure all TSB’s and software current Current SW# _____
4) Running
_____ System Prime
_____ Start-Up with Backgrounds (include report)
_____ 10 run Repeatability Study (include report)
_____ Calibrator as patient (include report)
_____ Calibration if required (include report)
_____ QC Runs (include reports)
Drew3 System