You are on page 1of 4

INSTALLATION REPORT AND CHECKLIST

For analyzer CY015 ­ CYANElite 290

Distributor (Company name)


(Country, city)
Coordinates
(Telephone and E­mail)
(Name)
Maintenance engineer
(Telephone and E­mail)

Institution (Laboratory name)


(Country, city)
Coordinates
(Telephone and E­mail)
(Name)
Lab manager
(Telephone and E­mail)

Installation report
Serial number
Delivery date
Installation date
Content packing list verified □ Yes □ No
Installation checklist completed
(see page 2) □ Yes □ No
User training given □ Yes □ No
Warranty activated □ Yes □ No
(see page 2) Warranty end date:

The installation report of the laboratory equipment is approved and signed by:

Laboratory manager Maintenance engineer

First and last name:

Date:

Signature:

This form is a compulsory requirement for ISO certification, laboratory accreditation, good
laboratory practices and the legal requirements in many countries. Fill it out and be future ready.
P.S. Keep a copy

Rev. (0.0), 2022­03 Page 1


Checklist for installation (detailed instructions in chapter 3 of the user manual)

Ensure optimal operation

□ Verify the location specifications

□ Check the electronical current requirements. If necessary, use:


□ Electronic stabilizer
□ UPS
Installation of accessories and software
Register the analyzer to activate the warranty and obtain the software with license (see QR
□ code below)

□ Mount the reagent and sample rack

□ Install the washing solution and waste container

□ Connect the power cord to a suited power supply

□ Connect to a computer using the USB­B cable

□ Install the Hi software on the connected computer

Checking the CYANElite 290 analyzer

□ Prime the hydraulic system

□ Install and align the reaction cuvettes

Adaptation of the system to the customer

□ Import the software license and method files (received after analyzer registration)

System setup: language, report settings, data export path, define method groups and
□ profiles and create user accounts
Customize the programs: assign methods to specific method groups, adjust the report unit
□ 3, adjust the reference ranges if necessary

□ Give extensive information on daily use and maintenance to the user

Warranty activation:

Link: https://diagnostics.be/warranty

Rev. (0.0), 2022­03 Page 2

You might also like